My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/15/2023 Regular
>
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 3:46:14 PM
Creation date
8/9/2023 4:37:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23
Date
8/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- k - <br />I <br />PP i ornia legends aquatics center <br />university of california, berkeley <br />Cal's Legends Aquatics Center, a Pac 12 conference <br />venue for swimming and diving, features a new 50M <br />stretch pool with a two -centerline dive tower, locker <br />rooms, and a multipurpose training room. The design <br />establishes a connection with the university, creating <br />a regional athletics precinct, and, at night, becomes <br />a glowing beacon activating what was once a dark <br />corner of the campus. The sustainably designed <br />facility is highly functional, efficient, and durable, and <br />exceeds sustainability requirements mandated by UC <br />Berkeley. The project was designed to take advantage <br />of daylighting—all occupied spaces are daylit using <br />either windows or skylights. Additionally, the project <br />achieves 40% water reduction and utilizes 20% <br />fi <br />berkeley, ca <br />recycled materials, FSC-certified wood products, and <br />all low -emitting materials. The project is certified LEED <br />Silver, and has received design awards from AIA East <br />Bay and Berkeley Design Advocates. <br />Completion: 2019 1 Client Reference: Peter Schnugg, <br />Client Representative for UC Berkeley, 510.207.4629, <br />pschnugg@pacbell.net <br />r W. <br />6 of 10 <br />memorial park aquatic center I south san fran <br />south san francisco <br />ELS is working with the City of South San Francisco <br />to develop design alternatives, cost estimates, and <br />construction documentation for this new $34MM <br />aquatic center. Itwill include two indoor pools: a warmer <br />pool for therapy and classes and a cooler lap pool. <br />ELS+SWA blended the aquatic center into Orange <br />Memorial Park's master plan and existing circulation <br />system. Our scope also includes exploring reuse of <br />the existing facility's footprint. We are working with <br />the community to tailor the project's characteristics to <br />the needs of various local user groups. The facility will <br />be constructed adjacent to the existing Orange Pool <br />to allow for its continued operation even during the <br />construction phase. Just like that pool, our new multi - <br />generational facility will be used by residents, non- <br />residents, students, children, adults, and seniors for <br />a variety of aquatic classes, events, and recreational <br />swim activities. <br />Completion: 2025 (projected) I Client Reference: Sharon <br />Ranals, City Manager/Chief Sustainability Officer, City of <br />South San Francisco, 650.829.3807, sharon.ranals@ssf <br />net <br />els+swa <br />
The URL can be used to link to this page
Your browser does not support the video tag.