My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/15/2023 Regular
>
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 3:46:14 PM
Creation date
8/9/2023 4:37:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23
Date
8/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7of10 <br />W4 <br />+ uytengsu aquatics stadium los angeles, ca <br />university of southern california <br />A renovation and expansion of the former USC <br />McDonald's Olympic Swim Stadium, the Uytengsu <br />Aquatic Center boasts new features including <br />permanent seating, a new shade canopy, eco-friendly <br />LED lighting for nighttime events, and an array of <br />student -athlete amenities. The new Center gives USC's <br />championship intercollegiate aquatic sports programs <br />a revived presence along McClintock Avenue, the <br />school's athletic corridor. large windows on the street <br />allow passersby to see into the center and visually <br />participate in the numerous athletic activities. The <br />Uytengsu Center also boasts the first LED spectator <br />lighting system in the Pacific 12 Conference. This <br />creates both significant energy savings and a better <br />light temperature that is more conducive to athletic <br />events from both a spectator and athlete perspective. <br />LEDs also reduce light leak and the accompanying <br />impact to surrounding areas. The night lighting has <br />doubled the use of the pool from nine to an average of <br />eighteen hours a day. The project delivery was CMAR. <br />Completion: 20151 Client Reference: Mike Mostowilz, Former <br />Development Manager, Capital Projects, USC, 316.461.8391, <br />mike.mostomiz@gmailcom <br />goo. <br />Mina. <br />Imb,� � <br />kkL- <br />8 of 10 <br />i f <br />9:1 ■ ■ BONNE Room LKEO:Ad "_ _ Po l <br />— _r r <br />i <br />W an <br />+ a oa par poo san francisco, ca <br />city and county of san francisco _ <br />Pon <br />S renovated this heavily used pool building, focusing respectfully upgrading it to serve as a vital resource <br />essential repairs, upgrading structural, seismic, and for the community for many years to come. The <br />environmental systems, pool improvements, and an renovation has been recognized with design awards <br />overall enhanced user experience. A new inviting entry from AIA San Francisco and California Preservation <br />was defined by a contemporary metal canopy, curving Foundation. Kuth Ranieri served as our JV partner. <br />accessible ramp and terraced stairs, welcoming the <br />community into the building. Locker/changing rooms Completion: 20191 Client Reference: ToksAjike, Former <br />and administrative spaces were reconfigured, enabling Director of Capital & Planning, SF Recreation and Park <br />a new, 800-square-foot community area for events and Department, 510.798.6892, tajike@me.com <br />children's parties. accessible even when the natatorium <br />is closed. Natural daylight floods the entry wing and <br />natatorium, with windows that facilitate views the park els+swa <br />and showcasing activity within the building. The project <br />preserves the best qualities of the original building while <br />
The URL can be used to link to this page
Your browser does not support the video tag.