My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/15/2023 Regular
>
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 3:46:14 PM
Creation date
8/9/2023 4:37:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23
Date
8/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9;'Of 10 <br />5 <br />. i•: - y , 1 <br />L. <br />1 r <br />+ rengstorff par aquatics center mountain view, ca <br />city of mountain view <br />ELS has been working with the City of Mountain View designed around existing specimens. The new <br />to rebuild the Rengstorff Aquatics Center, originally center will include a 25yd x 25M competition pool, a <br />opened in 1959, while threading the new offerings into 4,000sf recreation pool and ample deck and a robust <br />an existing park. The center had undergone relatively lawn area accommodating visits by 1,500+ visitors <br />few renovations since it was built, and it was not flexible per day. This project is targeting LEED Platinum and <br />or efficient enough to support the needs of a modern will be the first all -electric outdoor pool in California <br />municipal aquatics program. ELS worked with the to utilize electric chillers. <br />City to develop a new program consisting of a new <br />aquatics building that houses a reception space, locker Completion: Fall 2023 (projected) I Client Reference: <br />and shower facilities, a multipurpose room for social David Printy, Senior Project Manager, City of Mountain <br />gatherings, and city offices. SWA, meanwhile, was View, 650.903.6162, david.printy@mountainviewgov <br />able to save nearly every existing park tree, carefully <br />ANU <br />L <br />1 <br />Sig <br />' kf Wt' <br />+ south oxnard aquatics center oxnard, ca <br />city of oxnard <br />ELS is working with the City of Oxnard on the insertion of the shoreline. The broad range of programming <br />this major new aquatic center into an existing sports park, include recreation, water fitness, water safety and <br />with a scope that includes design, engineering, CEQA training, and competitive aquatics. SWA connected <br />analysis, and community outreach. The multi -generational to the existing park's auto and pedestrian circulation <br />facility, located in the neighborhood of College Park, will while adding key landscape features. <br />provide a crucial opportunity forthe public to enjoyaquatics <br />programming, with a user experience distinguished by Completion: 2026 (projected) a Client Reference: Nikolas <br />state-of-the-art design, equipment, and technology. This Boas, Supervising Civil Engineer, City Oxnard, <br />805.385.7999, nikolas.boas@oxnard.orgrg <br />project is essential in providing a safe place for children <br />and adults to learn how to swim. A lack of swim training <br />means that many Oxnard residents, despite their proximity e I s <br />to some of Southern California's best beaches, never visit <br />
The URL can be used to link to this page
Your browser does not support the video tag.