My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 29 - Interpretive Displays at Santiago Creek EcoCenter
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 29 - Interpretive Displays at Santiago Creek EcoCenter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:20:57 PM
Creation date
8/10/2023 9:39:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
29
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Suggestions / Special Concerns <br />Any concerns for this phase would be attributed to availability if materials and equipment. We would <br />minimize any impacts with advance consultation with suppliers and report any concerns prior to <br />fabrication. Lighting equipment has been a fluctuating item in recent months and would need special <br />attention to avoid specifying discontinued products. Additionally, any media interactives, need to be <br />approved prior to production commencing to avoid any scope changes which may delay and increase <br />budgets. <br />PHASE 4: DEMOLITION AND DELIVERY <br />The goals & objectives for Phase 4 activities are confirmed as follows: <br />In this phase we proceed to move all exhibits to the site. We will mobilize and pack and transport the <br />exhibits to the project site. Organize all exhibits for shipping. We will provide shipping to site with safe <br />crating, packing and unpacking for all exhibit features. Prior to site delivery we will begin demolition <br />of the site as prepared and coordinated with the "CAD team" and the EcoCenter team. <br />Color -Ad <br />4.1 Site demolition and preparation <br />Task: Building and exterior site locations are prepped for acceptance of exhibit installation. Remove <br />and properly disposing of garbage. Site cleaned and ready for delivery. <br />4.2 Exhibit is crated and loaded for transport <br />Task: Exhibits are crated and loaded for safe transport of the exhibits, graphics and media to the <br />EcoCenter site. <br />4.3 Transport to Santiago Creek EcoCenter <br />Task: Plan and facilitate safe transport / shipping of the exhibit features to the EcoCenter site. <br />Suggestions / Special Concerns <br />Prior to demolition the EcoCenter should be prepared to demount, pack and store any elements <br />currently on display for either reuse in the exhibit or for long-term storage. Typical concerns will arise <br />during demolition when unexpected conditions are revealed behind existing walls, floors, electrical <br />and lighting systems etc. Advance analysis by "the CAD team" with the facility manager will minimize <br />any impacts. <br />�� 00k�^ <br />40 Reich&Patch SIGNS AND EXHIBITS <br />
The URL can be used to link to this page
Your browser does not support the video tag.