BUTIER
<br />Kyle Morpelm, P.E.
<br />Project Manager
<br />Resident Engineer, Milliken 101D Zone Pump Station; Chino, CA; Chino
<br />Basin Desalter Authority (Completion: 2014; Value- $1.3 million) —The
<br />,scope of work includes the following potable water improvements: construction
<br />of a ventilated CMU Pump Station, 198 LF of 116-Inch discharge pip)nq and
<br />intarconnecton to an existing 30-inch transmission line, and 24-inch suction
<br />piping and interconnection to an existing 24-inch transmission line; installation of
<br />3 vertical turbine pumps and associated piping, fittings, valves, appurtenances,
<br />electrical instrumentation, and controls; and site Improvements, including grading
<br />and paving and restoration of existing improvements.
<br />Technical Advisor, Moffett Drive and Park Avenue Roadway Extension
<br />Project; City of Tustin, Public Works (Completion, 2016; Value: $14.5
<br />million) —Mr. Morgheirn provided construction management services for the
<br />Moffett Drive anii Park Avenue Extension Roadway Project, The project included
<br />the removal and compaction of 250,000 CY of removal and compaction of soil;
<br />275,000 SP of subgracle preparation and street fine grading; and 4,000 LF of
<br />reinforced concrete box storm drain. The project also includes the construction of
<br />street improvements, paving, utility installation, sioning, traffic installation,
<br />landscaping, and irrigation. Approximately 15,000 CY of concrete was used to
<br />construct the reinforced concrete box storm drain, which includes lateral storm
<br />drains with catch basins. Major dewatering efforts and shoring under the
<br />Jamboree Bridge at Moffett Drive presented significant challenges that Butier
<br />coordinated with success,
<br />Technical Advisor, Peter's Canyon Channel and Moffett Drive Bridge
<br />Construction and Street Improvements Project; City of Tustin, Public
<br />Works (EstImated Completion: 2018)—Mr- Morgheim is providing
<br />construction management services for the Peters Canyon Channel and
<br />Moffett Drive Bridge Construction and Street Improvements Project. The
<br />scope of work consists of removing the existing bridge and constructing a
<br />single sparl cast -in -place concrete box girder bridge approximately 108 feet in
<br />length and 73.25 feet in width. The work also includes an architectural steel
<br />arch on each side of the bridge. In addition to the construction of briqiqe, the
<br />work shall include, but not limited to construction of barriers, sidewalks, wing -
<br />walls, foundation, railings, structure excavation, backfill, drainage, and bridge
<br />lighting. The channtfl work includes Oemol(tion, widening, and relining
<br />approximately 5,000 feet of the existing channel within the Cities of Tustin
<br />and Irvine. The channel scope of work also includes construction of new
<br />storm drain lines, extension of existing storm drain lines, and road
<br />undercrossings,
<br />Technical Support, Armstrong Avenue & Warner Avenue Extension
<br />Phase 2 Street Improvements, City of Tustin (Completion 2015; Value
<br />$13.2 milllon)—Mr. Morlheim provided technical support services for the
<br />Armstrong/Warner Ave. Extension Phase 2 project. The vope of work
<br />included roadway improvements, traffic signals, landscape, dry utility,
<br />waterline, and reclaimed water and sewer line construction on the following
<br />streets: Armstrong Avenue Extension from Warner Avenue to Barranca
<br />Parkway and Warner Avenue Extension frorn Red Hill Avenue to Tustin
<br />Ranch Road.
<br />
|