Laserfiche WebLink
BUTIER <br />C.In6twerfoo C,�nfm'rkq� V�yi­." <br />EDUCATION <br />M.S., Construction <br />Management, University of <br />Southern California, Los <br />Angeles, California, 2003 <br />B,S,, Civil ErigIneering, <br />Callfoorila State Polytechnic <br />University - Pomona, <br />California, 1995 <br />LICENSES / <br />CERTIFICATIONS <br />ProfeEk-ional Civil Engineer: <br />California (CE59405) <br />AFFILIA71ONS <br />P!oject Management Institute <br />Building Industry Association, <br />Orange County Chapter <br />Urban Land Institute <br />YEARS WITH FIRM <br />3 years <br />AVAILABILITY <br />As -Needed <br />Vladimir Burce, P.E. <br />TeChnical Advisor <br />Professional Summary <br />Mr. Bume Is a registered civil engineer with over 23 years of professional <br />experience in project and construction management, including planning, <br />clasIgn, resourGe allocabon, and costischedule management of major projects. <br />He has extensive exper�ence in providing PIV and CM services for <br />water/wastewater treatment facilities, wells, pump stations, storm water <br />detenflon / retention systems, transportation, parking structures. industrial, <br />Pducational, residentfal, and lana development projects during the design and <br />construction phases, <br />Mr. Burce has diverse project experience in public works and real estate <br />development, 71his background provides h1m vAth an In-depth understanding <br />of clvll engineering disciplines. His professional responsibilities have ranged <br />from feasibility study, geotechnical, civil design, complex drainage design and <br />regulatory requirements, technical specifications development and preparation <br />of bid documents, design/constructablilty review, schedule preparatton. field <br />implementation and supervi!5ion, and construction managernent. <br />Relevant Experience <br />Resident Engineer, Mid -Basin Injection: Centennial Park Project. Sarita <br />An a, C A; Orange County Wate r District (Complet! on: 2018; Val ue: $2 3.2 <br />m i I I i on) --The Mid -Basin I njection project co nsists of the construction of the <br />folfowlng� four groundwater injection wells In below grada vaults, a monitoring <br />woll at the Horitage Museum site; a purified recycled water injection supp�j <br />pipeline approximately 5.000 feet long that ronnects to the District's existing <br />Groundwater Replenishment System (GINRS) pipeline arid crosses the Sanla <br />Ana River; a backflush dischargo pipeline approximately 4,000 feet long that <br />disoharges to the GreenvIlle-Banning Channel and Centennial Park Lake; <br />installation of submersible purnips wHhin the four InjoGtIon wells; replacement <br />of approx(mately 9.6 acres of paving within the Park: demolishing an existing <br />City of Sonta Ana restroom fac[llty� and constructing two new buildings with <br />shared City and District uses, Mr. Burce is coordinating ulogely with the C�Ly <br />of Santa Ana, Santa Aria Unif ied School District, Heritage Museum, and state <br />and faderAl agencies, <br />Res I dent Eng i neer, C h ino I I We] I Fi e Id E qu ip ping of R aw Water We I I s <br />Nos. 11 - 10 and 11 - 11; East val e a ni Ontari o, C A; (Chi no Basin Desa Iter <br />Authority (Completion: 2017; Value: $3.8 rrilillon)-4Ar- Burce provided <br />rosident enginearinp, servicas for Well Nos. 11-10 and 11-11, Well ll-,110 is <br />located on CDA property In the Clty of Eastvale within Riverside County. Well <br />11-11 (Lot r'X) is located on CDA property in the City of Ontario within San <br />Bernardino County. The scope of work included equipping of two water wells <br />including, but not limited to, the following: construction of 16'8" W x 41'4"L x <br />16*H reinforced masonry block building, installation of 3,301) gprn vertical <br />turbine stainless steel pumping unill and 600 lip premium efficiency motor, <br />16-Inch diameter epoxy lined steel discharge he.ader pipa. 12-inch diameter <br />pump to waste piping, 16-inch diameter flow meter, site pressire pip'ing and <br />tubing, valves, tips and corp stops, pressure gages, 116-inch diarneter Cq05 <br />PVC underground discharge pipeline, and connection to existing 24-inch <br />