Laserfiche WebLink
BUTIER <br />Vladimir Burce, P.E. <br />Technfcal Advisor <br />diameter discharge pipeline: and on- and off-sile: alectrica;, Including power, <br />control, lighting, underground electrical duct, Instrumentation equipment and <br />panels, switchgear, VFD and motor control center equipment, and installation <br />of SCADA equipment, The project Included close coordination with the City of <br />Ontario, City of Eastvale, County of San Bernardino County Flood Control <br />District. Southern California Edison, and local businesses and residents. <br />Resident Engineer, Chino Desaiter Reliability Project; Chino, CA; Chino <br />Basin Desaiter Authority (Completion- October 2017; Value: $3.8 <br />million)—Butior provided CM and inspection services for the Chino I Reliability <br />Project located at the ex�sting Chino I Desafter. The project scope included the <br />following: new building built on to the existing Chino I Desafter faclifty: new RO <br />train tied into the existing (eed water, permeate, ooncentrate, and CIP piping <br />manifolds, modification of the existing sulfuric acid chemical system by <br />replacing two existing metering purnps and furnishing and Installing two <br />metering pumps; trench overflow constructed and connected below the air gap <br />that conveys water to the brine line; slurry seal all existing and new asphalt <br />surfaces; coating of the exterior of the existing process building to match the <br />new process building exterior coating system; and coating of all existing <br />trenches. <br />Construction Manager, Chino 11 Desalter Concentrate Reduction <br />Facility; Jurupa Valley, CA; Chino Basin Desalter Authority <br />(Completion- 2016—Val ue: $46.6 ml 11 lon�—B utiler provided CM and <br />inspection services for the CRF groundwater treatment facility- Both [on <br />excharge (IX) and RO treatment trains are used to treat brackish <br />groundwater from eight wells that also have elevated nitrate concentrations. <br />The project scope included construction of new softening, clarification, <br />filtration, and secondary RO (SRO) treatment and solids dewatering and <br />storage; installation of a new decarbonator; installation of a new transfer <br />pump with motor with associated VFD and motor controls and discharge <br />piping and valves,- installation of new cartridge filters; modification of the <br />existing sulfuric acid chemical system; modification of the existing threshoid <br />inhibitor chemical system; and site modifications, including fencing and gates. <br />yard piping, and storm drain replacement. <br />