Laserfiche WebLink
CITY OF SAN TA ANA <br />R F P NO.: 22-133 <br />ON -CALL E NG I N E E R1 RG DESIG N 3ERV I C$ FOR PFAS TR EATMENT SYSTEMS <br />The Cornsuttant Shall provide cost es#irnates for the treatment facility egkriprrmeral, any <br />necessary lend acquisition to a000mrnodate a Ireatment systern(s), permitting, plumbing <br />connections. Iransmission atignments and syrtam integration. The Consultant shall also <br />include ca p ital. mai ntenaince a nd o peralio n cost estirnetes for I X treament systerrl(-s) <br />F_ PRE L'IM IN ARY SOHE EAU LE <br />The Consultant Fhell develop o preliminary phasing schedule For construction in the <br />Pao nni ng Studer. The plan is inteMed to priavide the City a schedule and projected annual <br />outlays for financial planning. In the preliminary ScheduPe, the Consultant shall include the <br />anticipated duration of construction as well as any necessa(r utility extensions required. <br />G. FINAL RE PORT <br />The final report shall include disrussion of all items listed herein and shall to Submitted <br />to thi5 City for review arpd comments. The Consultant shall prowde a PDF digital copy of <br />the preliminary report arid shall incorporate all comments made by the City prior to <br />subrniltinig of Ilse final report <br />In addition to the aforer'nentiorred Rems, the final report shall sIse include one or more <br />sections summarizing major findings, amy significant c1halienges or common themes <br />relevant to the Cil}f s system, and recommend any future actions by the City as next steps <br />towards PFAS treatment implerrteotation. The report shall contain descriptions of <br />cparalkin and meIntenance such as IX resin frequency of change out, equipment details, <br />samplalanalyais frequency, and what staff augmentatiorVoerlificabon is required, <br />2, DESIGN PHASES <br />Once lho Planning Study has been completed. the Consultant shall provide design services <br />including preparation of design sheen, spec.ifications and permitting. All submittals described <br />herein ill be provided in th,e form of a PDF digital copy full-size), The design Phases shell <br />include, but are not Iimiled to the fWowing item: <br />A. D RAFT DE SIG N RE PORT (10% D E 5l ON S U8M fTTAL) <br />The Contractor is required to create a Preliminary Oosign Report (PDR} based on the <br />Planning Study for each lrealrr5eM site requested by the Cily_ The PDR shall be consldared <br />a 10% design level packagE for the project in which the IX wellhead "almenl project gals <br />and design criteria are addressed with aItematives, analysis and potential risk. <br />8. FINAL IDESIGN REPORT (30% DESIGN SUBMITTAL) <br />ARer the City defines the ms jor design eleoients of Lbe project and refines the pmject's <br />s pe, schedule and budget expressed in the preliminary design report, the C❑nF+ultent shall <br />develop the Final Design Report_ The final Design Reporl shall be considered a 30 design <br />Gity of Sianm Ana RFFP 22-1.33 <br />On -Call Engineering Design Sarvioe5 fof FFAS TrealrnerA "toms <br />Page 115 <br />