Laserfiche WebLink
CITY OF SANTA ANA <br />RFiP NO.: 22-13.3 <br />ON -CALL E NG I NEEWNC I3E.SI GN SE RVJ ES FO R PFAS TREATIVI ENT SYSTE IV S <br />level package forthe project in which the Consultant provider, a refined project budget_ cost <br />estimate and project schec;ule that the City can oornmit lo_ Land eequisitoor , falal flaws, <br />and the fmalpzed design Gnteria shall be incoWraled into the Final Design RapQrt. <br />G_ 60% DIES ION SU BAD ITTAL <br />After receiving and incorporating comments provided by the City an the 39 Design <br />Submittal, the Contractor shall provide an Updated % sign Stibmiltal in Which <br />expectations and objections are finalized of the project as mIJ as confirn kalion of <br />mnstructa bility and perr0 requirements. The nsultant -small also provide plans and <br />speGft,al! oCDS as WEII a-F. an engineering cost estimate. The Consultant shalt also implement <br />acceptable value engineering rectuirernents(if appli ble) and identify preferred equipment <br />and rrtiaterials. <br />0_ 90% DE5118M SUBMITTAL <br />The Gontractor shall provide!DG% Msign Mans with the complete pFctect design. including <br />plans and specifications, subject to review cumrr4nts by the City and any other potential <br />stakeholders. The DOS`¢ Dosign Package shalJ oarel'irm the bid availability of the prof€ 1, <br />possess an erri�Rneer"s cosl estimate for the bid, and 'finalize the building permit packago <br />(when applicable)_ The Consultant 0atl also provide a -Cornmias,ioning Plan in the 90% <br />Design 5ubmiittaI �n which the goals, systems, and mmissioning pilxesaes are idontifi - <br />E. FINAL DESIGN (100% DESIGN SUBMITTAL) <br />In the final design submittal, the Contraclor shall inmrporate all comments. and requests <br />made W the City in previous design submittals and stwil include, but is not Iirrided W the <br />forlowing: <br />I. C-ost Estimate, SpeciTications and Project Schedule. <br />a. Fi nal construction« sched u le a nd astimate of co r istruction duration <br />U. Construction phasing plan <br />c. Final construction staging plan with access to cortiatruciicrl staging area <br />obtained or final staging area to be obtained <br />d, F inrai commissioning Arlan <br />e. EN-Pneer's eosl estimate for Laid and backup dccumentotion <br />If. Al I land Peflmrts received <br />g. 'Z�omPlete set of stamped permit application drawings and documents <br />h. Complete set of project permit applications excluding Contractor obtained <br />permits <br />i. Complete set of technicar specifications <br />j. Cornpiete IGst of special conditions Felated to oonstructlon <br />11. Architectural system (If Appficablel <br />a. C-Omplete set of archiLecturai drawings <br />Ly 01 Santa Ans RFP 22-133 <br />0�n-Call Engineering De5i!p1 Services for PFAS Trealm-AnL SyMems <br />Page 17 <br />