My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Design List of Drawings: <br />No. <br />Description <br />10% <br />30% <br />60% <br />90% <br />100% <br />GENERAL <br />1 <br />G-1 Title Sheet, Vicinity & Location Map, List of Drawings <br />X <br />X <br />X <br />X <br />X <br />2 <br />G-2 General Notes and Symbols <br />X <br />X <br />X <br />3 <br />G-3 Piping Symbols, Piping Schedules, Legend <br />X <br />X <br />X <br />4 <br />G-4 Hydraulic Profile <br />X <br />X <br />X <br />5 <br />G-5 Process Flow Diagram <br />X <br />X <br />X <br />X <br />X <br />CIVIL <br />6 <br />C-1 Abbreviations and Notes <br />X <br />X <br />X <br />X <br />X <br />7 <br />C-2 Legend <br />X <br />X <br />X <br />8 <br />C-3 Overall Site Plan <br />X <br />X <br />X <br />X <br />X <br />9 <br />C-4 Horizontal Control and Paving Plan <br />X <br />X <br />X <br />10 <br />C-5 Grading and Drainage Plan <br />X <br />X <br />X <br />11 <br />C-6 Yard Piping Plan <br />X <br />X <br />X <br />X <br />X <br />12 <br />C-7 Yard Piping Profile <br />X <br />X <br />X <br />13 <br />C-8 Civil Details <br />X <br />X <br />X <br />STRUCTURAL <br />14 <br />S-1 Structural General Notes and Abbreviations <br />X <br />X <br />X <br />X <br />X <br />15 <br />S-2 Special Inspection, Testing Notes, and Schedules <br />X <br />X <br />X <br />X <br />X <br />16 <br />S-3 Structural - Notes and Standard Details <br />X <br />X <br />X <br />17 <br />S-4 Electrical Equipment Pad Plan and Sections <br />X <br />X <br />X <br />18 <br />S-5 Sand Separator and Pump Station Plan and Sections <br />X <br />X <br />X <br />19 <br />S-6 Pre -Filters and Vessel Foundation Plan and Sections <br />X <br />X <br />X <br />MECHANICAL <br />20 <br />M-1 Legend and Abbreviations <br />X <br />X <br />X <br />X <br />X <br />21 <br />M-2 Equipment, Valve Schedules <br />X <br />X <br />X <br />X <br />X <br />22 <br />M-3 Mechanical Standard Details <br />X <br />X <br />X <br />X <br />X <br />23 <br />M-4 Sand Separator and Pump Station Plan and Sections <br />X <br />X <br />X <br />24 <br />M-5 Pre -Filters and Treatment Equipment Plan <br />X <br />X <br />X <br />X <br />X <br />25 <br />M-6 IX Vessel Slab Sections <br />X <br />X <br />X <br />26 <br />M-7 IX Vessel Slab Sections <br />X <br />X <br />X <br />27 <br />M-8 Mechanical Details <br />X <br />X <br />X <br />28 <br />H-1 HVAC/Plumbing Legend, Abbreviations, & Schedules <br />X <br />X <br />X <br />X <br />29 <br />H-2 Control Building HVAC and Plumbing Plan <br />X <br />X <br />X <br />30 <br />H-3 Control Building HVAC and Plumbing Details <br />X <br />X <br />ELECTRICAL <br />31 <br />E-1 Electrical Abbreviations and Notes <br />X <br />X <br />X <br />X <br />X <br />32 <br />E-2 Electrical Symbols - I <br />X <br />X <br />X <br />X <br />X <br />33 <br />E-3 Electrical Symbols - II <br />X <br />X <br />X <br />X <br />X <br />34 <br />E-4 Electrical Details <br />X <br />X <br />X <br />35 <br />E-5 Overall Electrical Site Plan <br />X <br />X <br />X <br />X <br />36 <br />E-6 Single Line Diagram and Equipment Elevations <br />X <br />X <br />X <br />X <br />X <br />37 <br />E-7 Electrical Control Schematic <br />X <br />X <br />X <br />38 <br />E-8 Panelboard and Luminaire Schedule <br />X <br />X <br />X <br />39 <br />E-9 Conduit Block Diagram - I <br />X <br />X <br />X <br />40 <br />E-10 Conduit Block Diagram - II <br />X <br />X <br />X <br />41 <br />E-11 Conduit and Cable Schedule - I <br />X <br />X <br />X <br />42 <br />E-12 Conduit and Cable Schedule - II <br />X <br />X <br />X <br />43 <br />E-13 Control Building Demolition Plan <br />X <br />X <br />X <br />44 <br />E-14 Control Building Equipment Location Plan <br />X <br />X <br />X <br />45 <br />E-15 Control Building Lighting, Receptacle & Grounding Plan <br />X <br />X <br />X <br />46 <br />E-16 Pump Station Equipment Location Plan <br />X <br />X <br />X <br />47 <br />E-17 Pump Station Lighting, Receptacle & Grounding Plan <br />X <br />X <br />X <br />48 <br />E-18 Well Area and IX Electrical Plan <br />X <br />X <br />X <br />INSTRUMENTATION & CONTROLS <br />49 <br />1-1 Legend and Abbreviations <br />X <br />X <br />X <br />X <br />X <br />50 <br />1-2 Standard Details <br />X <br />X <br />X <br />51 <br />1-3 Network Block Diagram <br />X <br />X <br />X <br />52 <br />1-4 Control Panel Layout and Details <br />X <br />X <br />X <br />53 <br />1-5 Control Panel Wiring Diagram <br />X <br />X <br />X <br />54 <br />1-6 P&ID — Sand Separator and Pump Station <br />X <br />X <br />X <br />X <br />55 <br />1-7 P&ID — Pre -Filters and Treatment Vessels <br />X <br />X <br />X <br />X <br />EEC Environmental 19 November 17, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.