My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. Architectural System, if Applicable <br />• Complete set of architectural <br />drawings <br />• All appropriate schedules <br />III. Structural System <br />• Complete set of structural drawings <br />• Final structural details and <br />calculations <br />IV. Civil Site Plan System F-ETER -YER PUMP <br />• Complete set of civil plans including <br />quantities, utility connections, and site drainage <br />• Landscaping and irrigation system plans, if applicable <br />• Traffic control plans and SWPPP will be defined as the Contractor's responsibility <br />V. Mechanical System <br />• Complete set of process mechanical and building mechanical plans <br />• Final control diagrams, control point list, and sequence of operations <br />• Final building components U-value calculations and final energy code calculations <br />VI. Electrical System <br />• Final electrical details including lighting, receptacles, and equipment circuited <br />• Final balanced load panel schedules and fixture schedules <br />• Complete one -line diagrams directly linked to the panel schedule <br />• Final electrical load calculations and final arc flash analysis <br />VII. Instrumentation and Control System <br />• Final control, security, and alarm plans <br />• Final P&IDs and associated Inputs/Outputs <br />• AC/DC power distribution wiring diagrams <br />Deliverables <br />1. Bid Set Design Drawings (Electronic, pdf format). <br />2. Bid Set Design Specifications (Electronic, pdf format). <br />Task 7 - Bid Phase and Construction Support <br />Detailed scopes of work for bid phase and construction phase support services will be proposed during the design phase of <br />the project. Scopes of work will generally conform to the corresponding scopes of work identified in the RFP. <br />EEC Environmental 18 November 17, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.