My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSALFOR <br />On -Cali Engineering Design Services <br />PFAS Treatment Systems <br />In order to provide the most comprehensive services possible, our team has been thoughtfully assembled to <br />capitalize on the strengths of each team member and provide you with unparalleled technical excellence. <br />Through our past experience we fully understand how to successfully complete this type of engineering <br />contract. <br />I <br />TETRA TECH <br />.4' ' T1.) J ct.lENrMANAG�R <br />�+ • • • ' • <br />y <br />Y .w <br />ft� <br />TEAM 2 LEADER <br />Kara Buttacavoli, PE Beverly Encina, PE <br />Crisna Raymond, PE <br />Amanda Taylor, PE <br />Victor Ramirez, PE, SE <br />Mazen Kassar, PE <br />Mark Wilt, PhD <br />William Johnson <br />LeightonCori sui0ng.Inc. + <br />Geotechrikof Engineering <br />Metz Surveying + <br />Design Survey <br />+ Sub -consultant <br />Meet our Team <br />Management Team <br />Carey Hess, PE <br />Peter Yu, PE <br />Eric Yuen, PE, 5E <br />Douglas Seamen <br />James Christopher, PE, BCEE <br />Kyle Matsumoto <br />Civil <br />Designers -10 <br />Electrical, AC - 6 <br />Process <br />Administrative <br />Designers-5 <br />Staff-4 <br />Mechanical <br />CADD <br />Designers-5 <br />Designers-6 <br />Mark Bush, PE <br />Gary ReVoir, PE <br />Alan Ludwig + <br />Steve Tedesco, PE, BCEE, Project Manager, has worked in the water industry in California for the <br />majority of his 39-year career with an emphasis on planning, analysis, design, and construction of water <br />and wastewater, treatment design using GAC, IX, and centralized treatment approaches. Steve has an <br />innovative and forward thinking personality and is always looking for the best solution and opportunity <br />to best support his client's needs. He has recently lead the team on six PFAS water treatment plants <br />and three PFAS well studies. <br />TETRA TECH Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.