My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL rOR <br />On -Call Engineering Design Services <br />permitting. All submittals described herein will be <br />provided in the form of a PDF digital copy (full-size). <br />We have included the proposed sheet counts for the <br />10%, 30%, 60%, 90% and 100% design. The <br />design phases will include the following items: <br />A. ❑raft. Design Report (10% Design Submittal) <br />Tetra Tech will create a Preliminary Design Report <br />(PDR) based on the Planning Study for each <br />treatment site requested by the City. The PDR will <br />be considered a 10% design level package for the <br />project in which the IX wellhead treatment project <br />goals and design criteria are addressed with <br />alternatives, analysis, and potential risks. The <br />following design drawings will be provided: <br />• General (3 Sheets) <br />• Civil (3 Sheets) <br />■ Structural (2 Sheet) <br />■ MechanicallProcess (4 Sheets) <br />• Electrical (3 Sheets) <br />• instrumentation (4 Sheets) <br />B. Final Design Report (30% Design Submittal) <br />After the City defines the major design elements of <br />the project and refines the project's scope, schedule <br />and budget expressed in the PDR, we will develop <br />the Final Design Report. The Final Design Report <br />will be considered a 30% design level package for <br />the project which provides a refined project budget, <br />cost estimate and project schedule that the City can <br />commit to. Land acquisitions, fatal flaws, and the <br />finalized design criteria will be incorporated into the <br />Final Design Report. The following design drawings <br />will be provided: <br />• General (3 Sheets) <br />■ Civil (3 Sheets) <br />• Structural (2 Sheets) <br />■ Mechanical/Process (4 Sheets) <br />■ Electrical (3 Sheets) <br />■ Instrumentation (4 Sheets) <br />C. 60% Design Submittal <br />After receiving and incorporating comments <br />provided by the City on the 30%n Design Submittal, <br />the Tetra Tech will provide an updated 60% Design <br />Submittal in which expectations and objections are <br />finalized of the project as well as confirmation of <br />constructability and permit requirements. Tetra Tech <br />will also provide plans and specifications as well as <br />an engineering cost estimate. Our team will also <br />implement acceptable value engineering <br />requirements (If applicable) and identify preferred <br />PFAS Treatment Systems <br />equipment and materials. The following design <br />drawings will be provided: <br />• General (4 Sheets) <br />• Civil (8 Sheets) <br />• Structural (4 Sheets) <br />• Mechanical/Process (8 Sheets) <br />• Electrical (6 Sheets) <br />• Instrumentation (6 Sheets) <br />D. 90% Design Submittal <br />Tetra Tech will provide 90% Design Plans with the <br />complete project design, including plans and <br />specifications, subject to review comments by the <br />City and any other potential stakeholders. The 90% <br />Design Package will confirm the bid availability of <br />the project, possess an engineer's cost estimate for <br />the bid, and finalize the building permit package <br />(when applicable). Tetra Tech will also provide a <br />Commissioning Plan in the 90% Design Submittal in <br />which the goals, systems, and commissioning <br />processes are identified. The following design <br />drawings will be provided: <br />■ General (6 Sheets) <br />+ Civil (11 Sheets) <br />■ Structural (7 Sheets) <br />• Mechanical/Process (13 Sheets) <br />• Electrical (9 Sheets) <br />■ Instrumentation (6 Sheets) <br />■ Traffic Control (3 Sheets) <br />E. Final Design (100% Design Submittal) <br />In the final design submittal, Tetra Tech will <br />incorporate all comments and requests made by the <br />City in previous design submittals. The following <br />design drawings will be provided: <br />■ General (6 Sheets) <br />■ Civil (11 Sheets) <br />■ Structural (7 Sheets) <br />■ MechanicallProcess (13 Sheets) <br />■ Electrical (9 Sheets) <br />■ Instrumentation (6 Sheets) <br />• Traffic Control (3 Sheets) <br />In addition, the following items will be provided with <br />the final design, as requested in the City's RFP: <br />• Cost Estimate, Specifications and Project <br />Schedule <br />• Structural System <br />■ Civil Site Plan System <br />• Mechanical System <br />■ Electrical System <br />• Instrumentation and Control System <br />TETRA TECH Page 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.