My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Architectural Design Services for Santa Anita Community Center
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/06/2022 Regular
>
Item 19 - Architectural Design Services for Santa Anita Community Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 3:07:25 PM
Creation date
8/11/2023 4:45:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
12/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ARCHITECTURAL DESIGN SERVICES <br />FOR A NEW COMMUNITY CENTER <br />AT SANTA ANITA PARK <br />RFP NO.22-106A <br />CONSULTANT SERVICES: <br />Consultant shall be responsible for the preparation and submittal of concept plans and the PS&E <br />package for the above project, meeting approval from City to release far construction. <br />A. PROJECT COORDINATION. The Consultant shall be fully responsible for the overall <br />management and coordination for the project, which may include, but is not limited to project <br />development team meetings, liaison with affected agencies, and utility companies. Prepare <br />progress report and schedule, securing permits for all field studies and any other required <br />permits from other agencies. <br />B. RECORDS RESEARCH. Research all information pertinent to the project including, but not <br />limited to existing field condition, as -built plans and record drawings, right-of-way data and <br />all future improvement plans adjacent to or affecting the project site. The selected Consultant <br />shall identify all existing and proposed facilities within the projects limits and potential <br />conflicts. <br />C. SURVEY (if necessary). Consultant shall identify in the proposal if the survey would be <br />needed and the detail of the features to be surveyed. All survey and base mapping of the project <br />site shall be prepared in US Customary English units by a California licensed Land Surveyor <br />in accordance with the City guidelines and in Microstation V8i Computer Aided design and <br />Drafting (CADD) format. The horizontal datum shall be NAD 83 and the vertical datum shall <br />be NAVD 88. <br />D. PERMIT(s). The Consultant shall be responsible for identifying and applying for any <br />necessary permits. All permit requirements shall be include in the bid package for the project, <br />as applicable. <br />City of Santa Ana RFP 22-106A <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.