My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - First One -Year Extension for Site Plan Review No. 2020-03 and Variance No. 2020-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/06/2022 Regular
>
Item 23 - First One -Year Extension for Site Plan Review No. 2020-03 and Variance No. 2020-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 4:26:33 PM
Creation date
8/14/2023 7:49:24 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
12/6/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRASH ROOM KEYNOTES <br />8'-8" 4'-8" <br />9" 7'-11 " <br />4'-8" <br />r <br />El RUBBISH CHUTES - (3) 30" DIA, 16 GAUGE ALUMINIZED STEEL W/ DAMPING COMPOUND <br />ON THE CHUTE EQUAL TO SOUNDCOAT GP-1 SHOULD BE INCORPORATED AS PART OF <br />I <br />THE BID REQUIREMENT. DAMPING SHOULD BE 1/2" THICKNESS OF STEEL. PROVIDE <br />SPRINKLERS AT TOP INTAKE AND EVERY 2ND OPENING - PROVIDE FLUSHING SPRAY <br />- <br />- <br />HEAD AND A DISINFECTING AND SANITIZING UNIT <br />M <br />r <br />o <br />I <br />M <br />150.1 <br />I <br />0 <br />2 INTAKE DOOR-15"x18" STAINLESS STEEL FRONT BACK AND SKIRT, NOISELESS SELF -CLOSING, <br />I I <br />.• I I <br />BOTTOM -HINGED, HAND -OPERATED DOOR WITH ACCESSIBLE LEVER HANDLE, RUBBER DOOR BAFFLES <br />I I <br />193 <br />DOOR SHALL BE 1-1/2 HR RATED WITH EMBOSSED LETTERS "WASTE", "RECYCLE" OR "GREEN WASTE". <br />-ago <br />o <br />CLEANING ACCESS DOOR -1-1/2 HOUR FIRE -RATED AT 4+ STORIES, 1 HOUR AT 3 STORIES OR <br />`O <br />0 <br />I <br />I <br />`n <br />-1 <br />LESS, 15"x15" SIDE -HINGED STAINLESS STEEL BEARING A UL "B" LABEL (AT TOP FLOOR ONLY) TO <br />TRASH J <br />TRASH <br />�_____L <br />SANITIZE UNIT OVER TOP OF CHUTE DOOR. VERIFY LOCATION AND COORDINATE WITH CHUTE <br />— <br />N <br />1 <br />VESTIBULE <br />N <br />MANUFACTURER. PROVIDE WATER SUPPLY AS REQUIRED BY CHUTE MANUFACTURER. <br />VESTIBULE <br />_, <br />_, <br />4 WASTE, GREEN WASTE OR RECYCLE BIN <br />Co <br />L <br />\ <br />5 TRASH CHUTE ATTACHMENT AT FLOOR FRAMING, BY MANUFACTURER. PROVIDE VIBRATION <br />\ <br />\ <br />_ <br />ISOLATION OF THE TRASH CHUTE WHERE CONNECTED TO THE BUILDING EQUAL TO MASON <br />r---------- <br />-- -- 1 <br />T A5 97 <br />00 <br />------ <br />r <br />-- - 147 .' <br />1 T I <br />-- <br />-- 1 <br />A5 97 <br />- rn <br />INDUSTRIES TYPE BR HAVING 0.2 INCHES OF STATIC DEFLECTION <br />a <br />1 <br />o <br />_ <br />o <br />OPENING IN SLAB OR FLOOR FRAMING FOR MECHANICAL VENTILATION - SEE MECHANICAL PLANS <br />` <br />-� : <br />`r° <br />DISCHARGE: UL LABELED ACCORDION TYPE FIRE DAMPER <br />El <br />FD <br />�8 FLUSHING SPRAY HEAD <br />r <br />M <br />150.93 <br />Cl)❑ <br />9 165 DEGREE SPRINKLERS: LOCATE AT TOP INTAKE, ALTERNATE INTAKES BELOW AND AT <br />r <br />FIRST INTAKE <br />N <br />N <br />10 FLOOR DRAIN <br />I I <br />I I <br />WALL PROTECTION: 10" HIGH X 6" WIDE CURB ALONG THE PERIMETER OF THE TRASH ROOM <br />El <br />J <br />Q <br />J <br />9 <br />❑g TRASH COMPACTOR: VERIFY SIZE WITH OWNER'S WASTE MANAGEMENT PLAN. VERIFY <br />POWER REQUIREMENTS WITH ELECTRICAL ENGINEER PRIOR TO PURCHASE. SLAB UNDER <br />K <br />K <br />COMPACTOR IS TO BE FLAT. <br />o <br />oilTRASH <br />o <br />10 HOSE BIB - SEE PLUMBING PLANS <br />I I <br />I I <br />I I <br />I I <br />I I I I <br />I I I I <br />ROOM NOTES <br />I I <br />I I <br />A5_98 <br />; <br />1. FACE OF FINISH SHALL BE FLUSH INSIDE OF SHAFT <br />1 <br />2. ALL DIMENSIONS ARE TO THE FACE OF STUD, CMU OR CONCRETE, U.N.O. <br />A5 98 <br />3. TRASH TERMINATION ROOM FLOORS SHALL BE FINISHED WITH WATERPROOF DECK OR EPDXY <br />1'-2" 64" 6-10" <br />5.5' 4" <br />COATING. <br />4. WALLS SHALL BE FINISHED WITH WASHABLE WATERPROOF SURFACE SUCH AS FRP OR HIGH -GLOSS <br />ENAMEL PAINT TO 6-0" AFF. <br />5. ODOR CONTROL UNIT MOUNTED ON WALL OF THE TRASH TERMINATION ROOM. <br />15 <br />6. DISINFECTING AND SANITIZING UNIT AT THE TOP OF THE CHUTE. <br />7. VERIFY ALL ACCESSORIES FOR TRASH TERMINATION ROOM WITH OWNER AND CONFIRM POWER <br />REQUIREMENTS WITH ELECTRICAL ENGINEER. <br />TRASH CHUTE DOOR ACCESSIBILITY NOTES: <br />1. MAXIMUM 5 POUNDS OPENING FORCE <br />UI L D)_N1G B TRASH ROOM <br />- LEVEL 5 <br />SCALE: 1 /4"=V-0" <br />5 <br />U I L D I.I G B <br />TRASH <br />ROOM <br />— LEVEL 3 <br />SCALE: 1 /4"=1'-0" <br />3 <br />2. DOOR HARDWARE SHALL NOT REQUIRE GRASPING PINCHING, TWISTING OF WRIST <br />, <br />3. DOOR HARDWARE CONTROLS SHALL BE 15"-48" ABOVE FINISH FLOOR TO THE HIGHEST OPERATING <br />MECHANISM <br />; <br />TRASH CHUTE ACCESS ROOM ACOUSTICAL NOTES: <br />I <br />I <br />I <br />4. DOORS TO THE TRASH CHUTE ROOM SHOULD HAVE ADJUSTABLE CLOSER THAT CAN BE ADJUSTED SO <br />- - - <br />- - <br />- <br />THE DOOR DOES NOT SLAM. <br />O' <br />' 161 01 ' <br />_ <br />Q <br />140.85' <br />5. DOOR TO THE TRASH CHUTE SHALL EMPLOY QUIET LATCHING. <br />IL <br />r <br />6. PROVIDE SOUNDCOAT GP-1 COMPOUND OR EQUAL ON THE CHUTE. DAMPENING SHALL BE MIN z THE <br />1 <br />I I <br />1 <br />I I <br />THICKNESS OF THE STEEL. <br />M <br />TRASH <br />! <br />°�° <br />o <br />TRIES TYPE BR HAVING 0.2 INCHES OF STATIC ISOLATION. <br />LEGENfY <br />TRASH ----J <br />_0 <br />- <br />VESTIBb E-j <br />t _�1 <br />,����� �L^ <br />ao <br />L <br />r <br />00 <br />2X4 WOOD STUD FRAMING <br />___ -V y\ <br />\ <br />_ y <br />2X6 WOOD STUD FRAMING <br />$0' <br />----- <br />r1 <br />1 <br />1 <br />- -- -T ��jR ' -- -- <br />1 `'' 8' 0 A5 97 <br />c � <br />------ <br />r <br />1 <br />-- - -r 137.80 <br />i <br />-- <br />1 <br />-- <br />A5 97 <br />_ - , <br />00 � <br />n <br />CMU WALL - SEE STRUCTURAL <br />CONCRETE WALL SEE STRUCTURAL <br />EXTENT OF EXTERIOR CEMENT PLASTER FINISH <br />161.01 ' <br />"' <br />140.85' <br />co <br />j DIAGONAL HATCH INDICATES EXTENT OF EXTERIOR PLASTER SOFFIT OR <br />///// DROPPED GYP. BD. CEILING BELOW RATED FLOOR/CEILING ASSEMBLY. SOFFIT <br />iv <br />iv <br />/ HEIGHT AS INDICATED IN PLAN. EXTERIOR CEMENT PLASTER OVER EXTRUDED <br />METAL LATH OCCURS AT LOBBIES WITH EXTERIOR WALL OPENINGS. SEE <br />ENLARGED PLANS FOR EXTENT. <br />iL <br />L----- <br />Q <br />L-----J <br />9 <br />1 i 30" x48" CLEAR FLOOR AREA <br />L J <br />K o <br />o <br />K o <br />0 <br />/—` <br />1 1 5'-0" DIAMETER TURN AROUND SPACE <br />Li <br />1 <br />1 <br />ENLARGED PLAN REFERENCES <br />1. FOR WALL FIRE -RATINGS AND DETAIL REFERENCES, FIRE EXTINGUISHER <br />1 <br />1 <br />A5-98 <br />A5-98 <br />LOCATIONS AND FIRE ACCESS ANALYSIS, SEE SHEETS AO-11 THRU AO-25 . <br />' 5'-4" <br />5'-4" <br />2. FOR EXITING ANALYSIS INCLUDING OCCUPANT LOADS, EXIT SIGNS AND DOOR PANIC <br />HARDWARE LOCATIONS, SEE SHEETS AO-31 THRU AO-45. <br />15 <br />15 <br />BUILDING B TRASH ROOM — LEVEL 4 <br />SCALE-1/4"=V-0" <br />4 <br />BUILDING B TRASH ROOM — LEVEL 2 <br />SCALE-1/4"=V-0" <br />2 <br />9" 7'-11" 22'-1" 31'-6" 11'-0" 2'-0" <br />130.3 ' <br />1; <br />13 0 <br />I <br />I <br />1 <br />I <br />---- — <br />I <br />1 <br />, <br />I <br />128176' <br />N i <br />r---1---------I <br />G` <br />`1 <br />TRASH-L_ -�- <br />121 .82' <br />-� <br />VESTIBULE <br />-------- —---------J <br />L------------ — J <br />00 <br />u'�—�y <br />Lr7-- <br />�----- - <br />—� I <br />I <br />1-+I\-79I1 - TIl -1i %-- <br />TRASH / <br />LOADING <br />1 <br />o <br />\G1 <br />EO V <br />7r11'� J ---� I 22'-1' <br />i 8'-8" <br />22'-10" <br />L— ,J I <br />I <br />F_--- --I--------- <br />�_� I <br />I <br />------------ <br />I I <br />-- <br />r------------------------I <br />I I <br />128.76 <br />I <br />,1 <br />I <br />I 1 <br />126.07 <br />0) <br />W/ <br />- <br />12 <br />LOLtj <br />.70 <br />K <br />IL <br />I— <br />— <br />I <br />0 <br />i <br />--- --- <br />-o' <br />Al i <br />71 <br />I I I I I <br />I I I I <br />I ii 1ii <br />I <br />I <br />1 <br />I <br />I <br />5'-0" 24'-7" <br />1'-1 " 13'-1 " <br />7'-2" 10'-2" <br />11'-0" <br />2'-0" <br />30'-0" <br />31'-6" <br />13'-0" <br />15 <br />17 <br />20 <br />21 <br />BUILDING B TRASH TERMINATION ROOM — LEVEL 1 <br />SCALE:1/4"=V-0" <br />1 <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />ED7 OAK <br />INVESTMENTS <br />S <br />4199 CAMPUS DRIVE <br />I RVI N E, CA 92612 <br />PHONE NO. (714) 342-2502 <br />w <br />T_ <br />L0 <br />06 <br />LO <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />D ARcy,T <br />No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />OF CAS\ <br />License Stamp <br />BUILDING B TRASH <br />ROOM PLANS <br />BUILDING <br />6 <br />A5-96 <br />C) <br />CN <br />Ir— <br />C) <br />00 <br />C) <br />COPYRIGHT (2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.