My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - First One -Year Extension for Site Plan Review No. 2020-03 and Variance No. 2020-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/06/2022 Regular
>
Item 23 - First One -Year Extension for Site Plan Review No. 2020-03 and Variance No. 2020-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 4:26:33 PM
Creation date
8/14/2023 7:49:24 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
12/6/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-HR RATED WALL PER PLAN <br />FRAMING PER STRUCTURAL <br />SHEATHING MAY OCCUR <br />HEADER PER STRUCTURAL <br />SEALANT AT FRAME TO WALL <br />N ? LABELED HOLLOW METAL DOOR <br />FRAME PER DOOR SCHEDULE <br />SMOKE AND DRAFT CONTROL <br />AS SPECIFIED OR SCHEDULED <br />LABELED 60 MIN. DOOR <br />PER DOOR SCHEDULE <br />VERIFY FRAME <br />WIDTH WITH <br />WALL REQ'MT. <br />FOR ADDITIONAL INFORMATION SEE DETAILS 4 <br />- <br />21 <br />- <br />17 <br />- <br />13 <br />- <br />9 <br />- <br />5 <br />1-HR INTERIOR DOOR <br />1 <br />2-HR RATED WALL PER PLAN <br />FRAMING PER STRUCTURAL <br />SHEATHING MAY OCCUR <br />HEADER PER STRUCTURAL <br />SEALANT AT FRAME TO WALL <br />iv ? LABELED HOLLOW METAL DOOR <br />FRAME PER DOOR SCHEDULE <br />1/ ' <br />1 2" <br />SMOKE AND DRAFT CONTROL <br />AS SPECIFIED OR SCHEDULED <br />LABELED 90 MIN. DOOR <br />PER DOOR SCHEDULE <br />VERIFY FRAME <br />WIDTH WITH <br />WALL REQ'MT. <br />FOR ADDITIONAL INFORMATION SEE DETAILS 4 <br />- <br />22 <br />- <br />18 <br />- <br />14 <br />- <br />10 <br />- <br />6 <br />2-HR INTERIOR DOOR <br />2 <br />1-HR RATED FIRE PARTITION <br />PER PLAN <br />FRAMING PER STRUCTURAL <br />SHEATHING MAY OCCUR <br />HEADER PER STRUCTURAL <br />LOW EXPANSION FOAM <br />APPLY IN SHIM CAVITY <br />WOOD FRAME CASING, <br />APPLY SEALANT AT WALL <br />20 MIN. WOOD DOOR FRAME <br />SMOKE AND DRAFT CONTROL <br />AS SPECIFIED OR SCHEDULED <br />LABELED 20 MIN. DOOR <br />PER DOOR SCHEDULE <br />CORRIDOR <br />VERIFY FRAME <br />UNIT <br />INTERIOR <br />WIDTH WITH <br />INTERIOR <br />WALL REQ'MT. <br />W <br />fn <br />o2i <br />0 <br />W <br />"PEMKO" 2746D SADDLE <br />x <br />o m <br />Q <br />SET PER MANUFACTURER <br />- <br />23 <br />- <br />19 <br />- <br />15 <br />- <br />11 <br />- <br />7 <br />� o <br />FLOOR ABOVE <br />CORRIDOROR FLOOR <br />p <br />N � �► <br />THRESHOLD "C" "PEMKO" 183D 1/4" ELEVATOR <br />3 THRESHOLD ANCHORS <br />W <br />02i <br />Of F O <br />W <br />"PEMKO" 274D SADDLE SET <br />X o m PER MANUFACTURER <br />Q <br />- O FLOOR 1/8" ABOVE <br />w p CORRIDOR FLOOR <br />THRESHOLD "B" "PEMKO" 183D 1/4" ELEVATOR <br />W 3 THRESHOLD ANCHORS <br />02 <br />O <br />W <br />00"PEMKO" 274D SADDLE SET <br />Q PER MANUFACTURER <br />Q <br />O FLOOR LEVEL WITH <br />CORRIDOR FLOOR <br />7� r <br />THRESHOLD "A" 3 THRESHOLD ANCHORS <br />- <br />24 <br />- <br />20 <br />- <br />16 <br />- <br />12 <br />- <br />8 <br />20-MIN. CORRIDOR UNIT ENTRY DOOR <br />4 <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />ED DAK <br />INVESTMENTS <br />4199 CAMPUS DRIVE <br />IRVINE, CA 92612 <br />PHONE NO. (714) 342-2502 <br />1 <br />i <br />0 <br />z <br />Q <br />2 <br />H <br />7- <br />0 <br />N <br />Q <br />U <br />Q <br />z <br />Q <br />Q <br />z <br />Q <br />U) <br />1= <br />w <br />w <br />w <br />r <br />Lid <br />06 <br />r <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />SED ARCyZT <br />�0 ��A <br />No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />s�gTF <br />OF CA�-\� <br />License Stamp <br />INTERIOR DOOR <br />DETAILS <br />AD-5202 <br />z <br />J <br />r� <br />V <br />ILL <br />N <br />N <br />O <br />N <br />1 <br />r <br />C) <br />00 <br />COPYRIGHT U <br />
The URL can be used to link to this page
Your browser does not support the video tag.