My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - First One -Year Extension for Site Plan Review No. 2020-03 and Variance No. 2020-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/06/2022 Regular
>
Item 23 - First One -Year Extension for Site Plan Review No. 2020-03 and Variance No. 2020-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 4:26:33 PM
Creation date
8/14/2023 7:49:24 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
12/6/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASE HEAD FLASHING: 9 GSM DRIP FLASHING W/ CLOSED <br />12" WIDE SAF -EXTEND 1" HEAD FLASHING: <br />LEGEND <br />BEYOND JAMB FLASHING ENDS (SOLDER SEAMS) 11 12" WIDE SAF O/ <br />WRB WEATHER RESISTIVE BARRIER <br />10 DRIP FLASHING <br />FORTIFIBER 60 MINUTE SUPER JUMBO TEX <br />SAF SELF ADHERED FLASHING <br />3" BEYOND <br />FORTIFIBER FORTIFLASH 25 MIL U.N.O. <br />--- THE WINDOW FLANGE <br />--------------------------- <br />_ <br />-- -- -- -- TOP AND BOTTOM . <br />1 ---- ----- ------- - _ <br />NOF NAIL ON FLASHING <br />------- -- __- _ _ <br />MIN 12" WIDE SOLID BACKING ALL ---- - - <br />- - -- -- <br />- - - - -- ---- <br />FORTIFIBER MOISTOP NEXT <br />1" BELOW -- --------------------------- - <br />FOUR SIDES OF ALL OPENINGS --------- -- . <br />PREPARE SUBSTRATE PER TOP OF HEAD -_- - _ __ _ <br />SEALANT FORTIFIBER MOISTOP SEALANT <br />FLASHING AND SUBSTRATE FLASHING - ------------------ __------ -- ---- <br />MANUFACTURER'S INSTRUCTIONS - - --- ---- <br />GENERAL NOTES <br />4" <br />1. VERIFY WINDOW INSTALLATION WITH WINDOW MANUFACTURER'S WRITTEN INSTRUCTIONS. <br />6" <br />12 <br />PROVIDE FIELD MOCKUP OF WINDOW INSTALLATION FOR APPROVAL BY OWNER. <br />2. UNLESS SUPERSEDED BY WINDOW MANUFACTURER, THE ROUGH OPENING SHOULD BE 1/2" <br />PROVIDE WRB PER CODE <br />GREATER IN WIDTH AND HEIGHT THAN THE NET FRAME SIZE OF THE WINDOW. <br />- _ <br />3. VERIFY ROUGH OPENING IS SQUARE, PLUMB, AND LEVEL. WINDOW SILL TO BE SET UPON LEVEL <br />--- - _ _ <br />FRAMING SILL WITH CONTINUOUS SUPPORT. <br />--- _ <br />4. SUBSTRATES SHALL BE CLEAN, DRY, PRIMED AS REQUIRED, AND UNIFORM/SMOOTH PRIOR TO <br />--`- <br />FLASHING APPLICATION. <br />1" MIN PAST <br />BASE SILL '- -- <br />FLASHING ,f ---------------- --- ----------------- <br />S <br />5. WANED LUMBER WILL NOT BE USED @ROUGH OPENINGS LOCATIONS. <br />- - - <br />6. FIELD VERIFY ALL DIMENSIONS PRIOR TO CUTTING AND INSTALLING FLASHING COMPONENTS. <br />VERIFY MANUFACTURER REQUIREMENTS. <br />6 <br />7. PROVIDE MINIMUM 12" SOLID WOOD BACKING OR SHEATHING AT ALL SIDES OF OPENING TO <br />2 SEALANT: <br />3 8 <br />SECURE FLASHING. <br />4 5 CONT. 3/8" BEAD OF 7 <br />SEALANT ON BACKSIDE NOTE: DETAIL BASED ON FORTIFIBER'S <br />SILL FLASHING: SILL CORNERS W/ SILL WRAP: OF WINDOW FLANGE INSTALL WINDOW JAMB FLASHING: <br />BASE JAMB HIGH PERFORMANCE WINDOW FLASHING <br />8. ADHERE SELF ADHERED FLASHING TO CLEAN DUST FREE BACKING TYPICAL. <br />12" WIDE NOF - EXTEND SEALANT PER MANUF. 9" WIDE SAF 40 MIL FLASHING: (PLACE SEALANT ON 6" WIDE SAF OVER WINDOW SYSTEM W/ SILL CORNERS - <br />12" BEYOND R.O. EA. GUIDELINES COMPLETLY COVER 9" WIDE NOF OUTBOARD EDGE OF FLANGE AND BASE JAMB SEE MANUF. INSTALLATION GUIDELINES FOR <br />9. USE CHEMICALLY COMPATIBLE PRIMERS, WRB, AND SEALANT WITH THE ADHESIVE SIDE OF THE <br />SIDE - FASTEN AT TOP (MOISTOP CORNER R.O. SILL AND SHIELDS FLANGE OR ALONG FLASHING MORE DETAILED INFO. <br />SELF -ADHERED FLASHING AS REQUIRED BY MANUFACTURER. <br />EDGE ALONG R.O. SHIELD) AND 3" MIN DOWNLEG PREPUNCED HOLES <br />10. NAILS TO BE NO MORE THAN 16" ON CENTER OR AS REQUIRED BY MANUF. <br />- <br />21 <br />- <br />17 <br />- <br />13 <br />WINDOW FLASHING <br />5 <br />11. NO NAILS SHALL BE BENT OVER THE NAILING FIN TO SECURE WINDOW <br />STUD WALL <br />i', STUD WALL <br />4 STUD WALL <br />I I <br />STUD WALL <br />STUD WALL <br />j <br />SHEATHING AS OCCURS <br />II <br />''' SHEATHING AS OCCURS <br />II <br />'' SHEATHING AS OCCURS <br />Ij <br />SHEATHING AS OCCURS <br />SHEATHING MAY OCCUR <br />3-COAT STUCCO SYSTEM <br />II <br />Ih, <br />Ih, <br />I; <br />0l METAL LATH 01 WRB <br />COMPOSITE METAL PANELS <br />li' VERTICAL CORRUGATED METAL <br />PANEL ON FURRING CHANNELS <br />ICI <br />FIBER CEMENT SIDING 0/ WRB <br />FIBER CEMENT SIDING 0/ WRB <br />INSTALL PER MANUF. DETAILS <br />INSTALL PER MANUF. GUIDELINES <br />INSTALL PER MANUF. GUIDELINES <br />I <br />II <br />I <br />II <br />4 <br />' <br />n GAP PER SIDING MANUF. - <br />DO NOT CAULK <br />GAP PER SIDING MANUF. - <br />DO NOT CAULK <br />APPLIED FOAM TRIM <br />S <br />I _ SEE EXT. ELEVATIONS <br />DRIP FLASHING 0/ HARDIE TRIM <br />; ; DRIP FLASHING 0/ HARDIE TRIM <br />I - - <br />APPLY LOW EXPANSION FOAM ALL <br />a <br />FOUR SIDES OF WINDOW <br />I I', GAP PER MANUF. <br />' I'' DO NOT CAULK <br />I I', GAP PER MANUF. <br />' I'' DO NOT CAULK <br />FIBER CEMENT TRIM 0/ WRB INSTALL <br />BOND BREAKER AT STUCCO TO DRIP <br />PER MANUF. GUIDELINES - SEE EXT. <br />FLASHING <br />ELEV. FOR MORE INFO. <br />I <br />DRIP CAP <br />I <br />I', <br />i i DRIP CAP <br />i <br />_i DRIP FLASHING - EXTEND <br />�„ <br />CLOSED ENDS 1" PAST WINDOW <br />BACKER ROD AND SEALANT <br />FRAME EA. SIDE <br />BACKER ROD AND SEALANT <br />BACKER ROD AND SEALANT <br />BACKER ROD AND SEALANT: <br />_ APPLY LOW EXPANSION FOAM ALL FOUR <br />FACTORY FINISHED WNDW <br />J APPLY LOW EXPANSION FOAM ALL FOUR <br />t'J APPLY LOW EXPANSION FOAM ALL FOUR <br />7 <br />���" <br />t APPLY LOW EXPANSION FOAM ALL FOUR <br />r� SIDES OF WINDOW <br />t'''S" <br />rz <br />t''S' SEE WINDOW FLASHING <br />DETAIL <br />SIDES OF WINDOW <br />SIDES OF WINDOW <br />SIDES OF WINDOW <br />5 <br />li <br />FACTORY FINISHED WNDW - SEE WINDO <br />FACTORY FINISHED WNDW - SEE WINDOW <br />FACTORY FINISHED WNDW - SEE WINDOW <br />III <br />FACTORY FINISHED WNDW - SEE WINDOW <br />FLASHING DETAIL <br />FLASHING DETAIL <br />FLASHING DETAIL <br />;; FLASHING DETAIL <br />5 <br />5 <br />ED <br />5 <br />- <br />22 <br />WINDOW HEAD (COMP. MTL.) <br />18 <br />WINDOW HEAD (CORR METAL) <br />14 <br />WINDOW HEAD (VERT SIDING) <br />10 <br />WINDOW HEAD (HORZ SIDING) <br />6 <br />WINDOW HEAD (STUCCO) <br />2 <br />INTERIOR FINISH <br />INTERIOR FINISH <br />INTERIOR FINISH <br />STUD WALL <br />STUD WALL <br />STUD WALL <br />STUD WALL <br />STUD WALL <br />FACTORY FINISHED WNDW - <br />FACTORY FINISHED WNDW - <br />SEE WINDOW FLASHING <br />FACTORY FINISHED WNDW - <br />SEE WINDOW FLASHING <br />FACTORY FINISHED WNDW - <br />SEE WINDOW FLASHING <br />DETAIL <br />FACTORY FINISHED WNDW - <br />SEE WINDOW FLASHING <br />DETAIL <br />SEE WINDOW FLASHING <br />DETAIL <br />5 <br />DETAIL <br />5 <br />DETAIL <br />5 <br />---------------------------- ----------------- -- - -- <br />------------- <br />---------------------------- ------------------------- <br />- - -- - -- - -- - - -- <br />� <br />------- <br />_______ ________ _____----- <br />--- <br />LL <br />BACKER ROD AND SEALANT <br />BACKER ROD AND SEALANT <br />BACKER ROD AND SEALANT <br />BACKER ROD AND SEALANT <br />APPLIED FOAM TRIM <br />SEE EXT. ELEVATIONS <br />FLASH CLOSURE TRIM <br />FIBER CEMENT SIDING AND TRIM 0/ <br />FIBER CEMENT SIDING AND TRIM 0/ <br />WRB - INSTALL PER MANUF. <br />3-COAT STUCCO SYSTEM 0/ <br />METAL LATH 0/ WRB <br />COMPOSITE METAL PANELS <br />VERTICAL CORRUGATED METAL <br />PANEL 0/ WRB 0/ SHEATHING <br />WRB - INSTALL PER MANUF. <br />GUIDELINES - SEE EXT. ELEV. FOR <br />GUIDELINES - SEE EXT. ELEV. FOR <br />MORE INFO. <br />MORE INFO. <br />SHEATHING AS OCCURS <br />SHEATHING AS OCCURS <br />SHEATHING AS OCCURS <br />SHEATHING AS OCCURS <br />- <br />23 <br />WINDOW JAMB (COMP. MTL.) <br />19 <br />WINDOW JAMB (CORR METAL) <br />15 <br />WINDOW JAMB (VERT SIDING) <br />11 <br />WINDOW JAMB (HORZ SIDING) <br />7 <br />WINDOW JAMB (STUCCO) <br />3 <br />FACTORY FINISHED WNDW <br />FACTORY FINISHED WNDW <br />FACTORY FINISHED WNDW - <br />SEE WINDOW FLASHING <br />I <br />FACTORY FINISHED WNDW - <br />FACTORY FINISHED WNDW - <br />SEE WINDOW FLASHING <br />DETAIL <br />5 <br />SEE WINDOW FLASHING <br />DETAIL <br />5 <br />DETAIL 5 <br />SEE WINDOW FLASHING <br />DETAIL <br />5 <br />SEE WINDOW FLASHING <br />DETAIL <br />5 <br />WI BACKER ROD AND SEALANTW� <br />BACKER ROD AND SEALANT <br />BACKER ROD AND SEALANT <br />�w� <br />L L8 <br />BACKER ROD AND SEALANT <br />"bi ?, <br />I LJ <br />SILL CLOSURE TRIM <br />FLASH CLOSURE TRIM <br />-- — — —— , I <br />— — — — —— <br />------ <br />I <br />SL <br />I <br />I <br />I <br />7 <br />I <br />t <br />t <br />COMPOSITE METAL PANELS <br />i VERTICAL CORRUGATED METAL <br />' FIBER CEMENT SIDING AND TRIM 0/ <br />WRB INSTALL PER MANUF. <br />FIBER CEMENT SIDING AND TRIM 0/ <br />PANEL C/ WRB 0/ SHEATHING <br />I I <br />GUIDELINES - SEE EXT. ELEV. FOR <br />WRB INSTALL PER MANUF. <br />i <br />' <br />MORE INFO. <br />GUIDELINES - SEE EXT. ELEV. FOR <br />MORE INFO. <br />II <br />ii <br />J <br />I <br />I II <br />i <br />Iy' <br />APPLIED FOAM TRIM <br />I1 <br />SEE EXT. ELEVATIONS <br />SHEATHING AS OCCURS <br />SHEATHING AS OCCURS <br />SHEATHING AS OCCURS', <br />SHEATHING AS OCCURS <br />WRB BOND BREAKER SHEET 01 <br />SAF 0/ NOF <br />i <br />STUD WALL <br />STUD WALL <br />STUD WALL <br />STUD WALL <br />STUD WALL <br />3-COAT STUCCO SYSTEM 0/ <br />METAL LATH 0/ WRB <br />- <br />24 <br />WINDOW SILL (COMP. METAL) <br />20 <br />WINDOW SILL (CORR METAL) <br />16 <br />WINDOW SILL (VERT SIDING) <br />12 <br />WINDOW SILL (HORZ SIDING) <br />8 <br />WINDOW SILL (STUCCO) <br />4 <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />E I]_ [ TQrA� K <br />I��ri_..J•l•��iV •1yJ <br />4199 CAMPUS DRIVE <br />I RVI N E, CA 92612 <br />PHONE NO. (714) 342-2502 <br />T_ <br />0 <br />N <br />Q <br />U <br />Q <br />z <br />z <br />Q <br />U) <br />F_ <br />w <br />w <br />U) <br />w <br />T_ <br />1.0 <br />06 <br />T_ <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />D ARcy,� <br />�G R�A <br />No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />OF CW\ <br />License Stamp <br />WINDOW DETAILS <br />(FLUSH CONDITION) <br />AD-53 <br />N <br />C) <br />1 <br />r <br />C) <br />00 <br />C) <br />COPYRIGHT (c <br />
The URL can be used to link to this page
Your browser does not support the video tag.