Laserfiche WebLink
Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Verification <br />Iniffal <br />Date <br />Comments <br />Mitigation Measure <br />Action Required <br />Monitoring Phase <br />Agency/Party <br />MM4.13-22 Project applicants shall, where feasible, incorporate passive solar <br />■ Incorporate into individual <br />■ Prior to issuance of <br />■ Project <br />design features into the buildings, which may include roof overhangs or <br />project building plans <br />occupancy permit <br />Applicant <br />canopies that block summer shade, but that allow winter sun, from penetrating <br />■ City of Santa <br />south facing windows. <br />Ana Planning <br />and Building <br />Agency <br />MM4.13-23 Use Energy Efficient Roofing Materials. All roofing materials used <br />■ Incorporate into individual <br />■ Prior to issuance of <br />■ Project <br />in commercial/retail buildings at the Mixed -Use Retail Development shall be <br />project building plans <br />occupancy permit <br />Applicant <br />Energy Star@ certified. All roof products shall also be certified to meet <br />■ City of Santa <br />American Society for Testing and Materials (ASTM) high emissivity <br />Ana Planning <br />requirements. <br />and Building <br />Agency <br />MM4.13-24 All commercial/industrial projects shall, where feasible, include up <br />■ Incorporate into individual <br />■ Prior to issuance of <br />■ Project <br />to 10% renewable energy sources within the project. <br />project building plans <br />occupancy permit <br />Applicant <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR 11-35 <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />ED OAK <br />rNV1'S"1'ilAL:NTS <br />4199 CAMPUS DRIVE <br />I RVI N E, CA 92612 <br />PHONE NO. (714) 342-2502 <br />N TF <br />0 <br />N <br />d') <br />OMu <br />W <br />LO <br />06 <br />LO <br />Nt <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />SED ARCII J <br />No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />OF C A\ - <br />License Stamp <br />CONDITIONS OF <br />APPROVAL <br />J <br />Q <br />H <br />m <br />D <br />co <br />U <br />w <br />2 <br />U <br />N <br />N <br />O <br />N <br />1 <br />Ir- <br />00 <br />0 <br />COPYRIGHT <br />AO-75 <br />