Laserfiche WebLink
Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting <br />Program Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required <br />Monitoring Phase Agency/Party <br />Coatings performance standards as amended September 11, 2006) by a <br />minimum of 20 percent <br />MM4.13-9 Prior to issuance of a building permit, applicants for individual <br />■ Prepare and submit <br />■ Prior to issuance of <br />■ City of Santa <br />projects shall provide a landscape plan that includes shade trees around main <br />project -specific landscape <br />building permit <br />Ana Planning <br />buildings, particularly along southern elevations where practical, and will not <br />plans for review and <br />and Building <br />interfere with loading dock locations or other operational constraints. <br />approval <br />Agency <br />Documentation of compliance with this measure shall be provided to the <br />m Incorporate landscape plan <br />Planning and Building Agency for review and approval. <br />into individual project <br />design <br />MM4.13-10 All showerheads, lavatory faucets, and sink faucets within the <br />■ Include in design plans <br />■ Prior to issuance of <br />■ Project <br />residential units, and where feasible within non-residential developments, shall <br />certificate of <br />Applicant <br />comply with the California Energy Conservation flow rate standards. <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.13-11 Low -flush toilets shall be installed within all Congregate Care units <br />■ Include in design plans <br />■ Prior to issuance of <br />■ Project <br />as specified in California State Health and Safety Code Section 17921.3. <br />certificate of <br />Applicant <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.13-12 Project designers should consider design features to incorporate <br />■ Include in design plans <br />■ Prior to issuance of <br />■ Project <br />light-colored roofing materials that will deflect heat away from the building and <br />certificate of <br />Applicant <br />conserve energy. <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.13-13 Landscape designers shall ensure that landscaping of common <br />■ Include in landscaping plan <br />■ Prior to issuance of <br />■ Project <br />areas for Industrial/Commercial projects uses drought -tolerant and smog- <br />and design plans <br />certificate of <br />Applicant <br />tolerant trees, shrubs, and groundcover to ensure long-term viability and <br />occupancy <br />■ City of Santa <br />conserve water and energy. <br />Ana Planning <br />and Building <br />Agency <br />11-32 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Verification <br />InUial <br />Date <br />Comments <br />Mitigation Measure <br />Action Required <br />Monitoring Phase <br />Agency/Party <br />MM4.13-14 Landscape designers shall ensure that the landscape plan for <br />■ Include in landscaping plan <br />■ Prior to issuance of <br />■ Project <br />Industrial/Commercial projects includes drought resistant trees, shrubs, and <br />and design plans <br />certificate of <br />Applicant <br />groundcover within the parking lot and perimeter. <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.13-15 Individual project applicants shall ensure that designs for <br />■ Include in design plans <br />■ Prior to issuance of <br />■ Project <br />Industrial/Commercial projects include all illumination elements to have <br />certificate of <br />Applicant <br />controls to allow selective use as an energy conservation measure. <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.13-16 The applicant for Industrial/Commercial projects should promote <br />■ Submit compliance <br />■ Prior to issuance of <br />■ Project <br />ride sharing programs such as, but not necessarily including, publishing ride <br />document for review and <br />certificate of <br />Applicant <br />sharing information for all of the tenants, designating a certain percentage of <br />approval <br />occupancy <br />■ City of Santa <br />parking spaces for ride sharing vehicles, designating adequate passenger <br />m Confirm installation of <br />Ana Planning <br />loading and unloading and waiting areas for ride sharing vehicles, and <br />design features and <br />and Building <br />providing a website or message board for coordinating rides. Prior to issuance <br />equipment <br />Agency <br />of a building permit, the applicant shall demonstrate that measures have been <br />included to provide adequate bicycle parking near building entrances to <br />promote cyclist safety, security, and convenience pursuant to SAMC <br />Chapter 41 regarding bicycle parking standards and Chapter 16 of the Santa <br />Ana Citywide Design Guidelines regarding Bikeway Support Facilities <br />Guidelines. Documentation of compliance with this measure shall be provided <br />to the City Building Official for review and approval. Installation of the identified <br />design features or equipment will be confirmed by the City Building Official <br />prior to issuance of certificate of occupancy. <br />and <br />P P Y <br />MM4.13-17 Prior to issuance of any certificate of occupancy, the applicant <br />■ Submit compliance <br />■ Prior to issuance of <br />■ Project <br />shall demonstrate that all Multi-family/Industrial/Commercial projects' interior <br />document for review and <br />building permit <br />Applicant <br />building lighting supports the use of compact fluorescent light bulbs or <br />approval <br />■ Prior to issuance of <br />■ City of Santa <br />equivalently efficient lighting to the satisfaction of the Building Official. <br />■ Confirm installation of <br />occupancy permit <br />Ana Planning <br />design features and <br />and Building <br />equipment <br />Agency <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR 11-33 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure <br />Action Required <br />Monitoring Phase <br />Agency/Party <br />MM4.13-18 Applicants for Multi-family/Industrial/Commercial projects shall <br />■ Inform tenants of <br />■ Prior to issuance of <br />■ City of Santa <br />consider providing preferential parking spaces for ultra -low emission vehicles <br />preferential parking space <br />Certificate of <br />Ana Planning <br />and alternative fueled vehicles to encourage the use of alternative fuels and <br />policy <br />Occupancy and <br />and Building <br />ultra -low emission vehicles. <br />On -going through <br />Agency <br />individual project <br />■ Project <br />operation <br />Applicant <br />MM4.13-19 Prior to issuance of a building permit, the applicant shall <br />■ Submit compliance <br />■ Prior to issuance of <br />■ Project <br />demonstrate that the proposed Multi -family/ Industrial/Commercial uses <br />document the Planning <br />building permit <br />Applicant <br />building or structure designs incorporate exterior storage areas for recyclables <br />and Building Agency for <br />■ Prior to issuance of <br />■ City of Santa <br />and green waste and adequate recycling containers located in public/common <br />review and approval <br />occupancy permit <br />Ana Planning <br />areas pursuant to the adopted standards. Documentation of compliance with <br />m Confirm installation of <br />and Building <br />this measure shall be provided to the Planning and Building Agency for review <br />design features and <br />Agency <br />and approval. Installation of the identified design features or equipment will be <br />equipment <br />confirmed by the City Building Official prior to issuance of certificate of <br />occupancy. <br />MM4.13-20 All common area irrigation areas for Multi- <br />■ Incorporate into individual <br />■ Prior to issuance of <br />■ City of Santa <br />family/Industrial/Commercial projects shall consider systems that are capable <br />project landscape plans <br />occupancy permit <br />Ana Planning <br />of being operated by a computerized irrigation system which includes an on- <br />and design plans <br />and Building <br />site weather station/ET gage capable of reading current weather data and <br />Agency <br />making automatic adjustments to independent run times for each irrigation <br />valve based on changes in temperature, solar radiation, relative humidity, rain, <br />and wind. In addition, the computerized irrigation system shall also consider <br />the ability to be equipped with flow -sensing capabilities, thus automatically <br />shutting down the irrigation system in the event of a mainline break or broken <br />head. These features will assist in conserving water, eliminating the potential <br />of slope failure due to mainline breaks, and eliminating over -watering and <br />flooding due to pipe and/or head breaks. <br />MM4.13-21 Consideration of installation of solar roofs on homes and <br />■ Incorporate into individual <br />■ Prior to issuance of <br />■ Project <br />businesses to offset the increasing demand for energy and natural gas. <br />project building plans <br />occupancy permit <br />Applicant <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />11-34 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Utilities and Service Systems <br />MM4.12-1 Individual project applicants shall prepare site -specific sewer <br />P l PP P P P <br />■ Prepare and submit site- <br />P <br />■ Prior to issuance of <br />■ Project <br />J <br />evaluations, including flow monitoring and modeling, during the project design <br />specific sewer evaluations <br />building permits <br />Applicant <br />to determine the adequacy of the existing sewer pipe capacity in the affected <br />for review and approval <br />■ City of Santa <br />project area lines. The evaluation shall be submitted to the City of Santa Ana <br />o Incorporate findings of <br />Ana Planning <br />or OCSD, as appropriate, for review and approval prior to issuance of building <br />evaluations in individual <br />and Building <br />permits. Any recommendations made in the site -specific sewer evaluations <br />project design <br />Agency <br />shall be incorporated into the design of each individual project. <br />■ Orange County <br />Sanitation <br />District <br />MM4.12-2 Individual non-residential project applicants are encouraged to <br />■ Apply for specified program <br />■ Prior to issuance of <br />■ City of Santa <br />apply for Southern Califomia Edison's "Savings By Design" program. The <br />(not required) <br />building permits <br />Ana Planning <br />program is aimed at generating an overall reduction in energy use through <br />and Building <br />design methods and incentive programs by maintaining a 15% or greater <br />Agency <br />exceedance of Title 24. <br />MM4.12-3 Individual development projects within the boundaries of the Transit <br />■ Implement energy <br />■ Prior to issuance of <br />■ City of Santa <br />Zoning Code (SD 84A and SD 84B) shall implement energy conservation <br />conservation measures <br />building permits <br />Ana Planning <br />measures (such as energy -efficient lighting and microprocessor controlled <br />into project design <br />and Building <br />HVAC equipment) to reduce the demand for electricity and natural gas as part <br />. Review project design for <br />Agency <br />of the project design. The energy conservation measures shall be subject to <br />incorporation of these <br />modification as new technologies are developed, or if current technology <br />conservation measures <br />becomes obsolete, through replacement and shall be reviewed by the <br />Planning and Building Agency prior to issuance of a building permit. <br />Climate Change <br />MM4.13-1 All diesel fueled construction equipment shall be classified EPA Tier <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />II or better emission efficiencies. <br />contract specifications and <br />grading permits <br />Contractor <br />construction documents <br />■ City of Santa <br />■ Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR 11-29 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Verification <br />Initial <br />T6ale <br />Comments <br />Mitigation Measure <br />Action Required <br />Monitoring Phase <br />Agency/Party <br />MM4.13-2 All construction equipment shall be shut off when not in use and <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />shall not idle for more than five minutes, unless actively engaged in <br />contract specifications and <br />grading permits <br />Contractor <br />construction activities. <br />construction documents <br />■ During project <br />■ City of Santa <br />■ Monitor construction <br />construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.13-3 Queuing of trucks on and off site shall be limited to periods when <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />absolutely necessitated by grading or construction activities. <br />contract specifications and <br />grading permits <br />Contractor <br />construction documents <br />■ During project <br />■ City of Santa <br />■ Monitor construction <br />construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.13-4 All on -road construction trucks and other vehicles greater than <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />10,000 pounds shall be shut off when not in use and shall not idle for more <br />contract specifications and <br />grading permits <br />Contractor <br />than 5 minutes. <br />construction documents <br />■ During project <br />■ City of Santa <br />■ Monitor construction <br />construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.13-5 To the extent feasible, all diesel- and gasoline -powered <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />construction equipment shall be replaced with equivalent electric equipment. <br />contract specifications and <br />grading permits <br />Contractor <br />construction documents <br />■ City of Santa <br />■ Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.13-6 Project plans and specifications shall include policies and <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />procedures for the reuse and recycling of construction and demolition waste <br />P Y 9 <br />contract specifications and <br />P <br />grading permits <br />9 9 <br />Contractor <br />(including, but not limited to, soil, vegetation, concrete, lumber, metal, and <br />construction documents <br />■ City of Santa <br />cardboard). <br />Ana Planning <br />and Building <br />Agency <br />11-30 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting <br />Program Matrix <br />Responsible <br />Compliance Verification <br />Inifial <br />Date <br />Comments <br />Mitigation Measure Action Required <br />Monitoring Phase Agency/Party <br />MM4.13-7 Project plans and specifications shall include education for <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />construction workers about reducing waste and using available recycling <br />contract specifications and <br />grading permits <br />Contractor <br />services. <br />construction documents <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.13-8 Prior to issuance of a building permit, the applicant shall <br />■ Submit compliance <br />■ Prior to issuance of <br />■ City of Santa <br />demonstrate that the design of the proposed buildings or structures meets or <br />documentation for review <br />building permit <br />Ana Planning <br />exceeds the most recent Title 24 requirements (Title 24, Part 6 of the <br />and approval <br />and Building <br />California Code of Regulations; Energy Efficiency Standards for Residential <br />Agency <br />and Non Residential Buildings; Cool Roof Coatings performance standards <br />9 � 9 P ), <br />subject to review by the City Building Official. Documentation of compliance <br />with this measure shall be provided to the Planning and Building Agency and <br />Building Official for review and approval prior to issuance of the permit. <br />Installation of the identified design features or equipment will be confirmed by <br />the City Building Official prior to certificate of occupancy. The following design <br />features should be considered by the applicant as a way to achieve Title 24 <br />compliance in excess of the minimum requirement: <br />■ Increase in insulation such that heat transfer and thermal bridging is <br />minimized <br />■ Limit air leakage through the structure or within the heating and cooling <br />distribution system to minimize energy consumption <br />■ Incorporate dual -paned or other energy efficient windows <br />■ Incorporate energy efficient space heating and cooling equipment <br />■ Incorporate energy efficient light fixtures <br />■ Incorporate energy efficient appliances <br />■ Incorporate energy efficient domestic hot water systems <br />■ Incorporate solar panels into the electrical system <br />■ Incorporate cool roofs/light-colored roofing <br />■ Or other measures that will increase the energy efficiency of building <br />envelope in a manner that when combined with the other options listed <br />above exceeds current Title 24 Standards (Title 24, Part 6 of the California <br />Code of Regulations; Energy Efficiency Standards for Residential and Non <br />Residential Buildings, as amended September 11, 2008; Cool Roof <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR 11-31 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Mitigation Measure <br />Action Required <br />Monitoring Phase <br />Responsible <br />Agency/Party <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />financial resources adequate to construct all identified mitigation <br />measures in a timely basis. <br />■ All properties that redevelop within the Transit Zoning Code should <br />in the ro ram on a fair share per new development trip basis. <br />participate program P P P <br />The fair share should be based upon the total cost of all identified <br />mitigation measures, divided by the peak hour trip generation increase <br />forecast. This rate per peak hour trip should be imposed upon the <br />incremental traffic growth for any new development within the Transit <br />Zoning Code. <br />■ The program should raise funds from full development of the Transit <br />Zoning Code to fund all identified mitigation measures. <br />■ The program should monitor phasing development of the Transit Zoning <br />Code and defer or eliminate improvements if the densities permitted in the <br />Transit Zoning Code are not occurring. <br />■ Program phasing should be monitored through preparation of specific <br />project traffic impact studies for any project that is expected to include <br />more than 100 dwelling units or 100,000 sf of non-residential <br />development. Traffic impact studies should use traffic generation rates <br />that are deemed to be most appropriate for the actual development <br />proposed. <br />■ Properties within Santa Ana and within one-half mile of the Transit Zoning <br />Code that redevelop to result in higher traffic generation should also <br />participate in the program to insure equity. <br />■ The City may elect to implement appropriate mitigation measures as a <br />condition of approval of the proposed developments, where appropriate. <br />All or part of the costs of these improvements may be considered to be a <br />negotiated credit toward the program, however the program must be <br />administered in a manner that assures that it can fund necessary <br />improvements to maintain adequate level of service at all intersections <br />within this study. If funding of priority improvements cannot be assured, <br />credit for construction of lower priority improvements may not be assured <br />or may be postponed until more program funds are available. <br />11-26 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting <br />Program Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required <br />Monitoring Phase Agency/Party <br />MM4.11-5 Main Street at First Street -Install a second northbound and <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />southbound left -turn lanes and a dedicated northbound right -turn lane for 2030 <br />improvement <br />project <br />Ana Public <br />and 2035 conditions. <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-6 Lacy Street at Santa Ana Boulevard -install a traffic signal and <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />provide exclusive left -turn lane for both northbound and southbound directions <br />improvement <br />project <br />Ana Public <br />for both 2030 and 2035 conditions. <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-7 Lacy Street at First Street -Install a traffic signal for both 2030 and <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />2035 conditions, a traffic signal, and provide exclusive left -turn lane for both <br />improvement <br />project <br />Ana Public <br />northbound and southbound directions for both 2030 and 2035 conditions. <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-8 Santiago Street at Washington Avenue -Install a traffic signal and <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />provide one exclusive left -turn lane for both eastbound and westbound traffic <br />improvement <br />project <br />Ana Public <br />for 2035 conditions only. <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-9 Santiago Street at Civic Center Drive -Install a traffic signal and <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />provide: one exclusive left -turn lane, one through lane, and one shared <br />improvement <br />project <br />Ana Public <br />through and right -turn lane on northbound and southbound approaches; and <br />development as <br />Works Agency <br />one exclusive left -turn lane and one shared through and right lane on <br />prescribed by <br />eastbound and westbound approaches. The improvement is only needed for <br />MM4.11-4 <br />2035 conditions. <br />MM4.11-10 Santiago Street at Santa Ana Drive -Construct a second <br />9 <br />■ Implement roadway <br />P Y <br />■ Ongoing through <br />9 9 9 <br />■ City of Santa <br />ty <br />southbound left -turn lane for 2035 conditions. The improvement is only <br />improvement <br />project <br />Ana Public <br />needed for 2035 conditions. <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR 11-27 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting <br />Program Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required <br />Monitoring Phase Agency/Party <br />MM4.11-11 Santiago Street a Fourth Street -Install a traffic signal. The lane <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />configuration for the signal is recommended as 1 Left, 1 Through, 1 Through+ <br />improvement <br />project <br />Ana Public <br />Right for all approaches. <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-12 Standard Street at First Street -Construct third eastbound and <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />westbound shared through -right lanes for 2035 conditions. The improvement <br />improvement <br />project <br />Ana Public <br />is only needed for 2035 conditions. <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-13 Grand Avenue at Santa Ana Boulevard -Construct a third <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />southbound through lane and eastbound right -turn overlap signal phasing. <br />improvement <br />project <br />Ana Public <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-14 Grand Avenue at First Street -Construct a third eastbound shared <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />through/right-turn lane, a third westbound shared through/right-turn lane, and a <br />improvement <br />project <br />Ana Public <br />third northbound through lane with dedicated northbound right -turn lane for <br />development as <br />Works Agency <br />2035 conditions. The improvement is only needed for 2035 conditions. <br />prescribed by <br />MM4.11-4 <br />MM4.11-15 Grand Avenue at 1-5 Northbound Ramps -Construct a second <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />westbound right -turn lane and for the 1-5 northbound off ramp under both 2030 <br />improvement <br />project <br />Ana Public <br />and 2035 conditions <br />development as <br />Works Agency <br />prescribed by <br />MM4.11-4 <br />MM4.11-161-5 at Santa Ana Blvd. Northbound Off -Ramp -The City of Santa <br />■ Implement roadway <br />■ Ongoing through <br />■ City of Santa <br />Ana Department of Public Works shall coordinate with Caltrans for the <br />improvement <br />project <br />Ana Public <br />installation of a second ramp lane for the 1-5 northbound off ramp. The <br />development as <br />Works Agency <br />improvement shall be implemented to mitigate 2035 conditions. <br />prescribed by <br />■ Caltrans <br />MM4.11-4 <br />11-28 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />ED OAK <br />INVL�SF AL:N I'S <br />4199 CAMPUS DRIVE <br />IRVINE, CA 92612 <br />PHONE NO. (714) 342-2502 <br />1 <br />TF <br />0 <br />Z <br />Q <br />2 <br />H <br />Ir- <br />O <br />N <br />Q <br />U <br />Q <br />Z <br />Q <br />Q <br />Z <br />Q <br />W <br />I- <br />LLI <br />I..LI <br />w <br />LO <br />Ir- <br />LO <br />06 <br />LO <br />T_ <br />Nt <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />��SED ARCy�T <br />,A <br />� tic <br />No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />s�gTF F���\� <br />of CA�\ <br />License Stamp <br />CONDITIONS OF <br />APPROVAL <br />Z <br />Q <br />J <br />Ir-n <br />ILL <br />V / <br />N <br />N <br />O <br />N <br />1 <br />Ir- <br />00 <br />0 <br />COPYRIGHT <br />AO-74 <br />