Laserfiche WebLink
7.7.3 The maximum expected static settlement for the five -story residential structure supported on <br />a conventional foundation system designed with a maximum bearing pressure of 5,000 psf and <br />deriving support in the recommended bearing materials is estimated to be less than %2 inch and <br />occur below the heaviest loaded structural element. Settlement of the foundation system is <br />expected to occur on initial application of loading. Differential settlement is not expected to <br />exceed'/a inch over a distance of 20 feet. <br />7.7.4 It is recommended that either a seismic separation or flexible connection be utilized where the <br />apartment structures and parking structure may be attached. The design of the connection is at <br />the discretion of the project structural engineer. Additional settlement analyses should be <br />performed once the foundation loading configuration for the proposed structures is finalized <br />to further evaluate the potential for differential settlement between the residential structure and <br />parking structure. The utilization of a lesser bearing value, or increasing the thickness of <br />engineered fill below the foundations, would further reduce the anticipated settlements and <br />could be evaluated once the design becomes more finalized. <br />7.7.5 It is recommended that flexible utility connections be utilized for all rigid utilities to minimize <br />or prevent damage to utilities from minor differential movements. <br />7.7.6 Once the design and foundation loading configurations for the proposed structures proceeds to <br />a more finalized plan, the estimated settlements presented in this report should be reviewed <br />and revised, if necessary. If the final foundation loading configurations are greater than the <br />assumed loading conditions, the potential for settlement should be reevaluated by this office. <br />7.8 Miscellaneous Foundations <br />7.8.1 Foundations for small outlying structures, such as block walls up to 6 feet in height, planter <br />walls or trash enclosures, which will not be structurally supported by the proposed building, <br />may be supported on conventional foundations deriving support on a minimum of 12 inches <br />of newly placed engineered fill which extends laterally at least 12 inches beyond the <br />foundation area. Where excavation and compaction cannot be performed, such as adjacent to <br />property lines, foundations may derive support in the undisturbed alluvial soils, and should be <br />deepened as necessary to maintain a minimum 12-inch embedment into the recommended <br />bearing materials. <br />Geocon Project No. A9799-88-01 <br />-19- <br />June 7, 2022 <br />7.8.2 If the soils exposed in the excavation bottom are loose, compaction of the soils will be required <br />prior to placing steel or concrete. Compaction of the foundation excavation bottom is typically <br />accomplished with a compaction wheel or mechanical whacker and must be observed and <br />approved by a Geocon representative. Miscellaneous foundations may be designed for a <br />bearing value of 1,500 psf, and should be a minimum of 12 inches in width, 18 inches in depth <br />below the lowest adjacent grade and 12 inches into the recommended bearing material. <br />The allowable bearing pressure may be increased by up to one-third for transient loads due to <br />wind or seismic forces. <br />7.8.3 Foundation excavations should be observed and approved in writing by the Geotechnical <br />Engineer (a representative of Geocon West, Inc.), prior to the placement of reinforcing steel <br />and concrete to verify that the excavations and exposed soil conditions are consistent with <br />those anticipated. <br />7.9 Lateral Design <br />7.9.1 Resistance to lateral loading may be provided by friction acting at the base of foundations, <br />slabs and by passive earth pressure. An allowable coefficient of friction of 0.35 may be used <br />with the dead load forces in the newly placed engineered fill or undisturbed alluvial soils. <br />7.9.2 Passive earth pressure for the sides of foundations and slabs poured against newly placed <br />engineered fill or undisturbed alluvial soils may be computed as an equivalent fluid having a <br />density of 230 pounds per cubic foot (pcf) with a maximum earth pressure of 2,300 psf. When <br />combining passive and friction for lateral resistance, the passive component should be reduced <br />by one-third. A one-third increase in the passive value may be used for wind or seismic loads. <br />7.10 Concrete Slabs -on -Grade <br />7.10.1 Concrete slabs -on -grade subject to vehicle loading should be designed in accordance with the <br />recommendations in the Preliminary Pavement Recommendations section of this report <br />(Section 7.11). <br />7.10.2 Subsequent to the recommended grading, concrete slabs -on -grade for structures, not subject <br />to vehicle loading, should be a minimum of 4 inches thick and minimum slab reinforcement <br />should consist of No. 3 steel reinforcing bars placed 18 inches on center in both horizontal <br />directions. Steel reinforcing should be positioned vertically near the slab midpoint. <br />Geocon Project No. A9799-88-01 -20- June 7, 2022 <br />PHASE 2 <br />STRUCTURAL <br />FOOTING <br />TO BE PLACED OVER <br />/\/\/ <br />>,/A;R 11401 <br />/ <br />INITIAL CONCRETE POUR <br />_-_-4-_-_-�-_-PHASE 1 <br />STRUCTURAL <br />CONCRETE <br />IN jTA/ L p jITj SLOT CUTS <br />j/ <br />7.6.5 If two-part foundation construction is used, the structural footing will be bounded laterally by <br />artificial fill and, therefore, passive pressure along the sides of the foundations cannot be <br />utilized. Resistance to lateral loads should be provided via structural connections to other <br />portions of the structure. <br />7.6.6 Continuous footings may be designed for an allowable bearing capacity of 2,500 pounds per <br />square foot (psf), and should be a minimum of 12 inches in width, 18 inches in depth below <br />the lowest adjacent grade, and 12 inches into the recommended bearing material. <br />7.6.7 Isolated spread foundations may be designed for an allowable bearing capacity of 3,000 psf, <br />and should be a minimum of 24 inches in width, 18 inches in depth below the lowest adjacent <br />grade, and 12 inches into the recommended bearing material. <br />7.6.8 The allowable soil bearing pressure above may be increased by 250 psf and 500 psf for each <br />additional foot of foundation width and depth, respectively, up to a maximum allowable soil <br />bearing pressure of 5,000 psf. <br />7.6.9 The allowable bearing pressures may be increased by one-third for transient loads due to wind <br />or seismic forces. <br />Geocon Project No. A9799-88-01 - 17 - June 7, 2022 <br />7.6.10 Continuous footings should be reinforced with a minimum of four No. 4 steel reinforcing bars, <br />two placed near the top of the footing and two near the bottom. The reinforcement for isolated <br />spread footings should be designed by the project structural engineer. <br />7.6.11 If depth increases are utilized for the exterior wall footings, this office should be provided a <br />copy of the final construction plans so that the excavation recommendations presented herein <br />could be properly reviewed and revised if necessary. <br />7.6.12 No special subgrade presaturation is required prior to placement of concrete. However, the <br />slab and foundation subgrade should be sprinkled as necessary; to maintain a moist condition <br />as would be expected in any concrete placement. <br />7.6.13 Foundation excavations should be observed and approved in writing by the Geotechnical <br />Engineer (a representative of Geocon West, Inc.), prior to the placement of reinforcing steel <br />and concrete to verify that the excavations and exposed soil conditions are consistent with <br />those anticipated. If unanticipated soil conditions are encountered, foundation modifications <br />may be required. <br />7.6.14 This office should be provided a copy of the final construction plans so that the excavation <br />recommendations presented herein could be properly reviewed and revised if necessary. <br />7.7 Foundation Settlement <br />7.7.1 The maximum expected static settlement for the parking structures supported on a <br />conventional foundation system designed with a maximum bearing pressure of 5,000 psf, and <br />deriving support in the recommended bearing materials is estimated to be less than <br />1 inch and occur below the heaviest loaded structural element. Settlement of the foundation <br />system is expected to occur on initial application of loading. Differential settlement is not <br />expected to exceed %Z inch over a distance of 20 feet. <br />7.7.2 The maximum expected static settlement for the seven -story mixed -use structure supported on <br />a conventional foundation system designed with a maximum bearing pressure of 5,000 psf and <br />deriving support in the recommended bearing materials is estimated to be less than 1 %2 inches <br />and occur below the heaviest loaded structural element. Settlement of the foundation system <br />is expected to occur on initial application of loading. Differential settlement is not expected to <br />exceed 3/4 inch over a distance of 20 feet. <br />Geocon Project No. A9799-88-01 _18- June 7, 2022 <br />7.4.9 Foundations for small outlying structures, such as block walls up to 6 feet high, planter walls <br />or trash enclosures, which will not be tied to the proposed structure, may be supported on <br />conventional foundations bearing on a minimum of 12 inches of newly placed engineered fill <br />which extends laterally at least 12 inches beyond the foundation area. Where excavation and <br />proper compaction cannot be performed, foundations may derive support directly in the <br />undisturbed alluvial soils, and should be deepened as necessary to maintain a minimum <br />12-inch embedment into the recommended bearing materials. If the soils exposed in the <br />excavation bottom are soft or loose, compaction of the soils will be required prior to placing <br />steel or concrete. Compaction of the foundation excavation bottom is typically accomplished <br />with a compaction wheel or mechanical whacker and must be observed and approved in <br />writing by a Geocon representative. <br />7.4.10 All imported fill shall be observed, tested, and approved by Geocon West, Inc. prior to bringing <br />soil to the site. Rocks larger than 6 inches in diameter shall not be used in the fill. Import soils <br />used as structural fill should have an expansion index less than 20 and corrosivity properties <br />that are equally or less detrimental to that of the existing onsite soils (see Figure 139). Import <br />soils placed in the building area should be placed uniformly across the building pad or in a <br />manner that is approved by the Geotechnical Engineer (a representative of Geocon). <br />7.4.11 Utility trenches should be properly backfilled in accordance with the following requirements. <br />The pipe should be bedded with clean sands (Sand Equivalent greater than 30) to a depth of at <br />least I foot over the pipe, and the bedding material must be inspected and approved in writing <br />by the Geotechnical Engineer (a representative of Geocon). The use of gravel is not acceptable <br />unless used in conjunction with filter fabric to prevent the gravel from having direct contact <br />with soil. The remainder of the trench backfill may be derived from onsite soil or approved <br />import soil, compacted as necessary, until the required compaction is obtained. The use of <br />minimum 2-sack slurry as backfill is also acceptable. Prior to placing any bedding materials <br />or pipes, the trench excavation bottom must be observed and approved in writing by the <br />Geotechnical Engineer (a representative of Geocon). <br />7.4.12 All trench and foundation excavation bottoms must be observed and approved in writing by <br />the Geotechnical Engineer (a representative of Geocon), prior to placing bedding sands, fill, <br />steel, gravel, or concrete. <br />7.5 Shrinkage <br />7.5.1 Shrinkage results when a volume of material removed at one density is compacted to a higher <br />density. A shrinkage factor of between 10 and 20 percent should be anticipated when <br />excavating and compacting the upper 5 feet of existing earth materials on the site to an average <br />relative compaction of 92 percent. <br />Geocon Project No. A9799-88-01 <br />-15- <br />June 7, 2022 <br />7.4.2 If import soils will be utilized in the building pads, the soils must be placed uniformly and at <br />equal thickness at the direction of the Geotechnical Engineer (a representative of Geocon <br />West, Inc.). Soils can be borrowed from non -building pad areas and later replaced with <br />imported soils. <br />7.6 Foundation Design <br />7.6.1 Subsequent to the recommended grading, a conventional shallow spread foundation system <br />may be utilized for support of the proposed structures provided foundations derive support in <br />newly placed engineered fill and/or the competent alluvial soils found at and below a depth of <br />5 feet. It is the intent of the Geotechnical Engineer to allow building foundations to derive <br />support in both engineered fill and competent alluvial soils for this project if conditions warrant <br />such an occurrence. All foundation excavations must be observed and approved in writing by <br />the Geotechnical Engineer (a representative of Geocon) prior to placing steel or concrete. Any <br />exposed soft soils should be compacted to a dense state or penetrated by proposed foundations <br />at the direction of the Geotechnical Engineer (a representative of Geocon West, Inc.). <br />7.6.2 Special excavation measures, such as slot cutting, will be required to construct foundations <br />along the property line. Recommendations for slot cutting are provided in Section 7.18 of this <br />report. <br />7.6.3 Foundations along the property line may be constructed in two phases using slot cutting to <br />create temporary excavations and quickly restore the majority of the support. It is <br />recommended that this project be mass graded prior to performing any foundation excavations <br />along the property lines. <br />7.6.4 The first phase of foundation construction will be to excavate a temporary slot -cut excavation. <br />The lower portion of the excavation, once approved by Geocon, can be backfilled with <br />structural concrete up to the desired bottom of foundation depth. The project structural <br />engineer should determine if the Phase 1 concrete pour requires any reinforcing and/or a key <br />between the two pours. The excavation should be backfilled on the same day the excavation is <br />opened. The second phase of the foundation construction will be to place the reinforced <br />structural foundation on top of the previously placed Phase 1 concrete. The two-part <br />foundation construction is illustrated below. <br />Geocon Project No. A9799-88-01 - 16 - June 7, 2022 <br />7.3.2 Laboratory tests were performed on representative samples of the site materials to measure the <br />percentage of water-soluble sulfate content. Results from the laboratory water-soluble sulfate <br />tests are presented in Appendix B (Figure 139) and indicate that the on -site materials possess <br />sulfate exposure class of "SO" to concrete structures as defined by 2019 CBC Section 1904 <br />and ACI 318-19 Chapter 19. <br />7.3.3 Geocon West, Inc. does not practice in the field of corrosion engineering and mitigation. <br />If corrosion sensitive improvements are planned, it is recommended that a corrosion engineer <br />be retained to evaluate corrosion test results and incorporate the necessary precautions to avoid <br />premature corrosion of buried metal pipes and concrete structures in direct contact with the <br />soils. <br />7.4 Grading <br />7.4.1 A preconstruction conference should be held at the site prior to the beginning of grading <br />operations with the owner, contractor, civil engineer and soil engineer in attendance. Special <br />soil handling requirements can be discussed at that time. <br />7.4.2 Earthwork should be observed, and compacted fill tested by representatives of Geocon West, <br />Inc. The existing fill and alluvial soils encountered during exploration are suitable for reuse as <br />engineered fill, provided any encountered oversize material (greater than 6 inches) and any <br />encountered deleterious debris is removed. <br />7.4.3 Grading should commence with the removal of all existing vegetation and existing <br />improvements from the area to be graded. Deleterious debris such as wood and root structures <br />should be exported from the site and should not be mixed with the fill soils. Asphalt and <br />concrete should not be mixed with the fill soils unless approved by the Geotechnical Engineer. <br />All existing underground improvements planned for removal should be completely excavated <br />and the resulting depressions properly backfilled in accordance with the procedures described <br />herein. Once a clean excavation bottom has been established it must be observed and approved <br />in writing by the Geotechnical Engineer (a representative of Geocon West, Inc.). <br />Geocon Project No. A9799-88-01 <br />-13- <br />June 7, 2022 <br />7.4.4 As a minimum, it is recommended that the upper 5 feet of existing earth materials within the <br />proposed building footprint areas be excavated and properly compacted for foundation and <br />slab support. Deeper excavations should be conducted as necessary to remove deeper artificial <br />fill or soft alluvial soil at the direction of the Geotechnical Engineer (a representative of <br />Geocon). The limits of existing fill and/or soft alluvial soils removal will be verified by the <br />Geocon representative during site grading activities. The excavation should extend laterally a <br />minimum distance of 3 feet beyond the building footprint area, including building <br />appurtenances, or a distance equal to the depth of fill below the foundation, whichever is <br />greater. Where the recommended lateral over -excavation cannot be performed, such as <br />adjacent to a property line, foundations should be deepened as necessary to derive support in <br />the undisturbed alluvial soils found at or below a depth of 5 feet. <br />7.4.5 All excavations must be observed and approved in writing by the Geotechnical Engineer (a <br />representative of Geocon). Prior to placing any fill, the upper 12 inches of the excavation <br />bottom must be scarified, moistened, and proof -rolled with heavy equipment in the presence <br />of the Geotechnical Engineer (a representative of Geocon West, Inc.). Any exposed soft soils <br />should be compacted to a dense state or penetrated by proposed foundations at the direction of <br />the Geotechnical Engineer (a representative of Geocon West, Inc.). <br />7.4.6 All fill and backfill soils should be placed in horizontal loose layers approximately 6 to <br />8 inches thick, moisture conditioned to near optimum moisture content, and properly <br />compacted to a minimum of 90 percent of the maximum dry density per ASTM D 1557 (latest <br />edition). <br />7.4.7 It is anticipated that stable excavations for the recommended grading associated with the <br />proposed structures can be achieved with sloping measures. However, if excavations in close <br />proximity to an adjacent property line and/or structure are required, special excavation <br />measures may be necessary in order to maintain lateral support of offsite improvements. <br />Excavation recommendations are provided in the Temporary Excavations section of this report <br />(see Section 7.17). <br />7.4.8. Where new paving is to be placed, it is recommended that all existing fill and soft alluvium be <br />excavated and properly compacted for paving support. As a minimum, the upper <br />12 inches of soil should be scarified, moisture conditioned to near optimum moisture content, <br />and compacted to at least 95 percent relative compaction, as determined by ASTM Test <br />Method D 1557 (latest edition). Paving recommendations are provided in Preliminary <br />Pavement Recommendations section of this report (see Sections 7.11 and 7.12). <br />Geocon Project No. A9799-88-01 <br />-14- <br />June 7, 2022 <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />ED 0 A K <br />INVESTi1iEN I'S <br />4199 CAMPUS DRIVE <br />IRVINE, CA 92612 <br />PHONE NO. (714) 342-2502 <br />Sig <br />TF <br />r <br />N <br />C) <br />Q <br />U <br />Q <br />Z <br />Q <br />Q <br />Z <br />Q <br />U) <br />LU <br />LU <br />U) <br />F_ <br />NT <br />L li <br />Ln <br />Ln <br />06 <br />T_ <br />Nt <br />m <br />No. Date Description H <br />75 <br />00 <br />D <br />U) <br />U <br />w <br />2 <br />U <br />Z <br />Q <br />J <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />v, <br />S�D ARcj,11 <br />ILL <br />N <br />No. C29795 <br />0 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />qTF OF <br />0 <br />C�� <br />A <br />License Stamp <br />o <br />GEOTECHNICAL <br />REPORT <br />COPYRIGHT (c, <br />AO-82 <br />