My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:03:42 PM
Creation date
8/15/2023 8:57:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTIER <br />C—sf,—twn W-gprs, Consulting Engineers <br />Casey Harris <br />Senior Scheduler/ Claims Analysis <br />installation of submersible pumps within the four injection wells; replacement <br />of approximately 9.6 acres of paving within the Park; demolishing an existing <br />City of Santa Ana restroom facility; and constructing two new buildings with <br />shared City and District uses. Butier coordinated closely with the City of <br />Santa Ana, Santa Ana Unified School District, Heritage Museum, and state <br />and federal agencies. <br />Senior Scheduler, EW-1 Well Equipping Project; Fullerton, CA; Orange <br />County Water District (Estimated Completion: September 2017)— EW-1, <br />which is located on private property in Fullerton Industrial Park, the project <br />included rehabilitation and redevelopment of the well, completing construction <br />of the wellhead, installing a submersible pump and shroud, and constructing <br />piping and a connection to a nearby OCSD sewer trunk line in State College <br />Blvd. for discharge of the pumped groundwater. The Butier Team is <br />coordinating with OCWD, the Contractor, and the property owner's <br />association to select an acceptable temporary piping route to the nearest <br />storm drain. In addition, a grade separation project is being constructed <br />concurrently in State College Blvd. adjacent to Fullerton Industrial Park. The <br />Butier Team is the main point of contact between the Contractor and the City <br />of Fullerton, OCTA and OCSD, to assist in coordinating project construction <br />activities. <br />Senior Scheduler, South Main Street Corridor Improvements; Santa <br />Ana, CA; City of Santa Ana Public Works Agency (Completion: 2022)— <br />Butier is providing CM, inspection, and public outreach services for the <br />revitalization of a 2.5-mile stretch of Main Street from First Street to Dyer <br />Road. The scope of work includes monument signs, lighting, decorative <br />sidewalk extensions / bulb outs landscaping, irrigation, traffic signals, signing, <br />striping, street pavement rehabilitation, and railroad coordination. The <br />improvements will replace aging and deficient water mains, sewer mains, <br />fire hydrants, sewer maintenance holes, water services, and sewer <br />laterals. The improvements consist of five individual projects, including South <br />Main Sewer Improvements, South Main Street Corridor Improvements, Main <br />Street Rehabilitation from Edinger Avenue to First Street, Main Street <br />Rehabilitation from Warner Avenue to Edinger Avenue, and Main Street <br />Rehabilitation from Dyer Road to Warner Avenue. <br />Project Manager, Multiple Safe Drinking Wellhead Treatment Project — <br />California American Water Company Arlington Well, Lynwood Well No. <br />11, and Huntington Park Well No. 15; Los Angeles, CA; Water <br />Replenishment District of Southern California (Combined Duration: <br />07/2018 — 04/2021; Combined Value: $4,823,064)—Mr. Harris is <br />responsible for providing construction management services for the Multiple <br />Safe Drinking Wellhead Treatment Project. The project is a part of WRD's <br />Safe Drinking Water Program. The scope of work includes the installation of <br />wellhead treatment equipment on wells that have been contaminated with <br />volatile organic compounds (VOCs). <br />
The URL can be used to link to this page
Your browser does not support the video tag.