My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:03:42 PM
Creation date
8/15/2023 8:57:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTIER <br />Construction Managers, Cwmdting Engineers <br />EDUCATION <br />B.S., Construction <br />Engineering, Arizona <br />State University, 1977 <br />Graduate Studies, <br />Arizona State <br />University <br />Casey Harris <br />Senior Scheduler Claims Analysis <br />Professional Summary <br />Mr. Harris has 45 years of varied experience as a project manager, <br />construction manager, resident engineer, and senior scheduler. As the on- <br />site/owner representative for major municipal, public agency, and special <br />district capital improvement projects, Mr. Harris has successfully managed the <br />construction of multi -million -dollar water and wastewater treatment, pipeline, <br />airport, solid waste landfill, and port facilities. Collectively, this project <br />experience represents over $700 million in construction costs. <br />Mr. Harris' expertise is in contract administration for design/build, <br />design/bid/build, and construction management programs. He is an expert <br />CPM scheduler, has established and implemented effective change order <br />control systems, negotiated change orders with design/build contractors, <br />performed routine shop drawing reviews, and resolved contractor claims. <br />Project Experience <br />Senior Scheduler, San Lorenzo Sewer Lift Station; Santa Ana, CA; City <br />of Santa Ana, Public Works (Completion: 04/2021; Value: $7.6 million) — <br />The San Lorenzo Sewage Lift Station Project consists of construction of the <br />following: lift station —below ground dry and wet wells; aboveground CMU <br />block building; three (3) 15 hp dry pit sewage pumps; piping, fittings, valves, <br />flow meter, in -line grinders, rail and hoist system; HVAC, ventilation and <br />ducting; electrical and instrumentation; site grading and improvements; 560 <br />(LF) of 15" gravity sewer pipe; 190 (LF) of 12" gravity sewer pipe; 545 (LF) of <br />10" force main; sewer manholes and appurtenances; and abandonment of <br />existing Segerstrom Lift Station. <br />Senior Scheduler, Mesa Water District Wells No. 12 and 14, South <br />Croddy Way and West Chandler Avenue; Santa Ana, CA; (Estimated <br />Completion: June 2022; Value: $18,500,000) Butier is providing <br />constructability review, project coordination, resident engineering and <br />construction inspection services for the drilling and construction of two 3000 <br />to 4000 GMP municipal water supply wells that will produce groundwater <br />from selected water -bearing zones using the reverse -circulation rotary drilling <br />technique. Both wells are being constructed in compliance with local codes <br />and regulations and in accordance with the California Water Code, and <br />American Water Works Association (AWWA) Standard for Water Wells <br />(AWWA A100-15). <br />Senior Scheduler, Mid -Basin Injection: Centennial Park Project; Santa <br />Ana, CA; Orange County Water District (Completion: 03/2020; Value: <br />$29.5 million) —The Mid -Basin Injection project consisted of the construction <br />of the following: four groundwater injection wells in below grade vaults; two <br />(2) monitoring wells; a purified recycled water injection supply pipeline <br />approximately 5,700 feet long that connects to the District's existing <br />Groundwater Replenishment System (GWRS) pipeline and crosses the Santa <br />Ana River; a backflush discharge pipeline approximately 4,200 feet long that <br />discharges to the Greenville -Banning Channel and Centennial Park Lake; <br />
The URL can be used to link to this page
Your browser does not support the video tag.