Laserfiche WebLink
ON-Si7E <br />Dent Kreeger <br />Mechanical / Start -Up / Commissioning <br />the drilling and construction of two 3000 to 4000 GMP municipal water supply <br />wells that will produce groundwater from selected water -bearing zones using <br />the reverse -circulation rotary drilling technique. Both wells are being <br />constructed in compliance with local codes and regulations and in <br />accordance with the California Water Code, and American Water Works <br />Association (AWWA) Standard for Water Wells (AWWA Al00-15). <br />Edward C. Little Water Recycling Facility Phase V Design -Build <br />Expansion; El Segundo, CA; West Basin Municipal Water District <br />(Completion: 05/2013; Value: $61,854,989)—Provided shop fabrication <br />inspection and field construction inspection support as a sub -consultant to <br />Butier Engineering, Inc. As a part of the project, West Basin expanded Title <br />22, Barrier Water and Low Pressure Boiler Feed water treatment processes. <br />The Phase V project involved expanding the Title 22 pretreatment capacity by <br />10 MGD to achieve a total treatment capacity of 40 MGD, along with <br />expanding the Barrier Water production from 12.5 MGD to 17.5 MGD and the <br />Low Pressure Boiler Feed water production from 1.7 to 2.2 MGD to serve <br />Single -Pass RO water to NRG's El Segundo Power Plant. The Phase V <br />project addressed numerous capacity expansion and treatment process <br />upgrades. The project included, but was not limited to, the following <br />components: Ozone-Microfiltration Pretreatment Process; West Coast <br />Barrier; El Segundo Power -Low Pressure Boiler Feed Water; Title 22 Facility - <br />High Rate Clarifier Expansion; Title 22 Pump Station; Chemical Facilities; and <br />miscellaneous civil work. <br />Expansion of the Leo J. Vander Lans Water Treatment Facility; Water <br />Replenishment District of Southern California (Completion: 07/2014; <br />Value: $31,588,721)—Provided shop fabrication inspection and field <br />construction inspection support as a sub -consultant to Butier Engineering, <br />Inc. The project included upgrading from 3 mgd to 8 mgd capacity; <br />construction of additional microfiltration (MF), reverse osmosis (RO), and UV <br />treatment and other systems; and upgrading the wastewater equalization <br />system and improvements to the electrical and instrumentation and controls. <br />Carlsbad 50 MGD Seawater RO Desalination Plant; Carlsbad, CA; <br />Poseidon Resources/SDCWA/Butler Engineering, Inc. (Completion: <br />12/2015)—As Start -Up Engineer, Mr. Kreeger had overall responsibilities <br />providing as -needed technical assistance during the fabrication, installation <br />and commissioning of (18) 7000HP pumps, mechanical equipment, valves <br />ranging in size from 48" thru 98" diameter, and electrical inspections for the <br />above referenced project. Knowledgeable and experienced in final testing, <br />debugging, start-up and commissioning of systems related to chlorination, <br />fluoridation, fumigation, exfoliation, water treatment, chemical feed, large <br />pumps and valves, electrical equipment, components and instrumentation, <br />SCADA, and other equipment and systems. <br />