My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:03:42 PM
Creation date
8/15/2023 8:57:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section D. Relevant Project Experience <br />Summary of Relevant Experience <br />The project experience on the following pages <br />demonstrates that Butier and its team member <br />firms are uniquely qualified to provide <br />construction management and inspection <br />services to the City of Santa Ana for the Well 32 <br />Rehabilitation Improvements project. Butier's <br />45-year history demonstrates our focus on <br />water and wastewater infrastructure. This <br />focused approach has enabled us to <br />independently manage over $1.5 billion of <br />public infrastructure projects. At the field team <br />level, the key members bring construction <br />management, inspection, and contract <br />administration experience for numerous <br />projects of comparable size and complexity. <br />Butier has successfully provided construction <br />management and inspection services for <br />numerous water production wells and pump <br />station projects for public agencies and special <br />districts throughout Southern California. Please <br />find below a sample list of these projects. <br />Additional project details can be found on the <br />following pages. <br />Water Production Wells <br />■ Mid -Basin Injection Wells — Centennial <br />Park Project; Santa Ana, CA (OCWD) <br />• OC Groundwater Storage Program, 8 <br />Water Production Wells; Santa Ana, <br />Anaheim, Buena Park, Garden Grove, <br />Westminster, Cypress, and Placentia, CA <br />(OCWD) <br />• Multiple Safe Drinking Wellhead <br />Treatment Projects —California American <br />Water Company Arlington Well, Lynwood <br />Well No. 11, and Huntington Park Well No. <br />15; Los Angeles, CA (Water Replenishment <br />District of Southern California) <br />• Edinger Avenue Well Phase II Equipping; <br />Tustin, CA (City of Tustin) <br />• Construction of Wells 21 & 22 and <br />Reverse Osmosis Water Treatment Plant; <br />Irvine and Tustin, CA (IRWD) <br />• EW-1 Well Equipping Projects; Fullerton, <br />CA (OCWD) <br />11 <br />• Rehabilitation of Well No. 6; Fountain <br />Valley, CA (City of Fountain Valley) <br />• Chino Creek Well Field Equipping, Well <br />Nos. 1-16, 1-17, 1-18, 1-20, and 1-21; Chino, <br />CA (Chino Basin Desalter Authority) <br />• Chino Creek Well Field Equipping, Raw <br />Water Well Nos. II-10 and II-11; Eastvale <br />and Ontario, CA (Chino Basin Desalter <br />Authority) <br />• Construction of New Water Wells 3A and <br />5; Huntington Beach, CA (City of Huntington <br />Beach) <br />• Baseline Feeder Replacement & <br />Improvement of Wells; San Bernardino, <br />CA (San Bernardino Valley MWD) <br />Pump Stations <br />■ 8 MG Peck Reservoir Replacement; <br />Manhattan Beach, CA (City of Manhattan <br />Beach) —Pump Station and Electrical <br />Control Building <br />OCWD Burris Pump Station — <br />Construction of a new 10,000 SF storm <br />water pump station and 4 conventional <br />vertical turbine pumps <br />Trampas Recycled Water Pump Station; <br />Rancho Mission Viejo, CA (Santa Margarita <br />Water District) —new booster pump station <br />building with pump room and electrical room <br />Chino Desalter Phase 3 Expansion <br />Milliken 1010 Zone Pump Station-3 <br />vertical turbine pumps and associated <br />piping, fittings, valves, appurtenances, <br />electrical instrumentation, and controls <br />■ Walnut Storm Drain Pump Station — <br />Remodel of the existing block building and <br />construction of a new masonry block wall <br />control room <br />Rotating Equipment Expertise <br />Key personnel from ON -SITE Technical Services <br />are experts in the areas of fabrication and testing <br />of rotating equipment, including pumps, motors, <br />turbines, compressors, and generators. <br />
The URL can be used to link to this page
Your browser does not support the video tag.