Laserfiche WebLink
8 MG Peck Reservoir <br />Replacement; <br />Manhattan Beach, CA <br />City of Manhattan Beach, <br />Public Works <br />Gilbert Gamboa <br />Project Manager <br />Tel: (310) 802-5356 <br />ggamboa@citymb.info <br />Value: $31,167,905.00 <br />Estimated Completion. <br />October 2022 <br />Proposed Key Personnel <br />Mark Butier <br />Bryan Wilson <br />San Lorenzo Sewer Lift Station; <br />Santa Ana, CA <br />City of Santa Ana <br />Michael Ortiz, P.E. <br />City Construction Manager <br />Tel: (714) 647-5624 <br />mortiz@santa-ana.org <br />Value: $7,606,500 <br />Completion: 2022 <br />Proposed Key Personnel <br />Mark Butier <br />Casey Harris <br />Bryan Wilson <br />Kent Kreeger (ON -SITE Technical) <br />City of Santa Ana, Public Works Agency <br />Well 32 Rehabilitation Improvements Project <br />Construction Management and Inspection Services, RFP No. 22-051 <br />Butier is providing construction <br />management, inspection, public <br />relations, environmental impact <br />monitoring, and soils/materials <br />testing services. The scope of <br />work includes construction of the <br />following: <br />• Reservoir-8 MG partially - <br />buried cast -in -place concrete <br />structure approximately 270 <br />feet long by 190 feet wide <br />located in same footprint. <br />• Operations Building-925 SF for office space and water quality <br />laboratory. <br />• Pump Station and Electrical Control Building-1,950 SF cast -in <br />place concrete structure. <br />• Water Treatment Facilities-3,000 SF including two (2) horizontal <br />filtration tanks, a protected chlorine and ammonia chemical storage <br />building, and a glass -fused bolted steel vertical back wash tank. <br />Ancillary Facilities —diesel standby generator, transformer, yard <br />piping, access vaults, infiltration drywells, retaining wall, access road, <br />pavement, fencing, gates, and landscaping. <br />Offsite Work —replacement of raw water transmission pipeline; <br />construction of chemical dosing and containment piping; new sewer <br />discharge pipeline connection; new utility connections; and new curb, <br />gutter, and sidewalks. <br />Butier is providing construction <br />management and inspection services for <br />the San Lorenzo Sewage Lift Station �, j <br />Project which consisted of the following: <br />• Lift station —below ground dry and wet r <br />wells <br />Aboveground CMU block building <br />• Three (3) 15 hp dry pit sewage pumps <br />Piping, fittings, valves, flow meter, in -line grinders, and rail & hoist system <br />• HVAC, ventilation, and ducting <br />• Electrical and instrumentation <br />• Site grading and improvements <br />560 (LF) of 15" gravity sewer pipe <br />• 190 (LF) of 12" gravity sewer pipe <br />• 545 (LF) of 10" force main <br />• Sewer manholes and appurtenances <br />Abandonment of existing Segerstrom Lift Station <br />13 D. RELEVANT PROJECT EXPERIENCE <br />