My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Proposed Fiscal Year 2022-23 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/07/2022 Regular & HA
>
Item 16 - Proposed Fiscal Year 2022-23 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 2:33:27 PM
Creation date
8/15/2023 10:18:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
6/7/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1006
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Bristol Street Improvements and <br />Widening: Phase 4 - Warner to Saint <br />Andrew <br />PROJECT CATEGORY: <br />Street Improvements <br />Streeb8ridge Improvements & <br />Wirlaninrr <br />LOCATION MAP <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned and designed <br />to incorporate complete street concepts with storm water quality <br />features. The improvements include widening of the street from four <br />lanes to six lanes, with bus turnouts, raised median, bike lanes, <br />enhanced storm drain system, and sound walls. The project also <br />brings native and organic landscaping that beautifies a fully <br />developed urban area. <br />PROJECT NEED: <br />Bristol Street from Warner Avenue to St. Andrew Place (Phase 4) is <br />part of the City's plan to widen Bristol Street from Warner Avenue to <br />Memory Lane, which was approved by City Council in 1990 and <br />reevaluated in 2015. Existing roadway has only 2lanes in each <br />direction and is operating at a Level of Service (LOS) F. This widening <br />is needed to improve traffic flow and create complete streets features. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 671,470 - - - - - - <br />TOTAL 671,470 <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />DAR DA-IV 141,470 - - - - - - <br />TSIA AREA F 530,000 <br />TOTAL 671,470 <br />LGENCY: DIVISION: CONTACT: <br />'ublic Works CIP Engineering Sean Thomas, Senior Civil Engineer <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.