My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Santa Ana Stadium Scoreboard and Sound System Replacement, Marquee retrofit, & Appropriation Adjustment
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 20 - Santa Ana Stadium Scoreboard and Sound System Replacement, Marquee retrofit, & Appropriation Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 1:49:04 PM
Creation date
8/15/2023 1:44:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAKTRONICS QUOTE # 622653-2-2 MAIN <br />ATTACHMENT A <br />1) Accept, lift, unload, and inspect all Equipment and control equipment from carrier. <br />2) Lift and mount Equipment listed in this quotation. <br />1) Access: Daktronics requires unobstructed access to Equipment and control room installation site until display <br />is 100%. Installation equipment (cranes, lifts, trucks, concrete trucks, etc.) are expected to have access <br />directly to the scoreboard/structure location. No concrete pumping, concrete buggies, or crane picks over <br />10' distance from scoreboard structure are included. <br />2) Control Room Climate: Normal operating temperature should be between 40° to 90° Fahrenheit (4° to 32° <br />Celsius). Normal operating humidity should be less than 80% non-condensing. Storage temperature should be <br />between -10° to 105° Fahrenheit (-23° to 41° Celsius). Storage humidity should be less than 95% non- <br />condensing. Keep computers and monitors out of direct sunlight during storage. Allow control equipment <br />taken out of storage to return to operating temperature range prior to turning it on (24 hours recommended). <br />3) Electrical: The maximum voltage is 120 volts line to neutral for all Equipment in this quotation. <br />4) Building Penetrations: Customer to provide all required building (wall/roof) penetrations for the installation of <br />Daktronics provided wireless bridge and/or scoring console radio transmitter components at the control <br />location. Mount Daktronics provided wireless bridge and/or scoring console radio transmitter components to <br />the building in accordance with manufacturers recommendations. Building penetration location shall <br />provide clear line-of-sight to the Equipment. Provide all conduit, with pull string, from control location <br />equipment to the building penetration location. <br />5) Existing Conduit: Costs to repair or replace damaged or obstructed conduit have not been included in this <br />quote. <br />6) Prevailing Wage: The install price accounts for prevailing wages. <br />QUALIFICATIONS/CLARIFICATIONS <br />Attachment A Page 2 of 2 <br />Exhibit 1
The URL can be used to link to this page
Your browser does not support the video tag.