SA-2 Pressure Control Station Relocation
<br />and Transmission Main Improvements
<br />RFP No. 21-127
<br />Mazen Kassar, PE
<br />Electrical/Controls Engineer
<br />Mr. Kassar has more than 29 years of experience in electrical
<br />engineering and industry standard that includes electrical
<br />engineering staff management, project management, construction
<br />management and supervision, water and wastewater treatment,
<br />petro-chemical design, and environmental soil and groundwater
<br />treatment. Mazen's background includes designing medium and
<br />low voltage power distribution, designing instrumentation, control
<br />systems and SCADA systems for a wide -variety of projects, and
<br />the installation of electrical systems for remediation projects,
<br />including soil vapor extraction systems and groundwater pump -
<br />and -treat systems. Other experience includes, working with utility
<br />companies to provide new electrical service to new projects,
<br />working with local Building and Safety Departments to obtain Plan
<br />Check and construction permits, field trouble shooting of electrical
<br />and mechanical systems, system commissioning and startup.
<br />EXPERIENCE
<br />Carlsbad Seawater Desalination Conveyance Pipeline, KSD Joint
<br />Venture, Carlsbad, CA Managed electrical design for 52,000 linear
<br />feet of pipeline that serves the product water from the planned
<br />Education:
<br />BS, Electrical Engineering,
<br />California State University,
<br />Long Beach, 1990
<br />Reg istrations/Certifications:
<br />Professional Electrical
<br />Engineer, California,
<br />No. 15809, 1998
<br />General Construction,
<br />Class B, California,
<br />No. 777845, 2008
<br />ETAP Electrical Power
<br />Modeling, 2010
<br />Professional Affiliations:
<br />Institute of Electrical and
<br />Electronics Engineers
<br />Office Location:
<br />Irvine, CA
<br />Total Years of Experience:
<br />29
<br />50 mgd desalination plant in the City of Carlsbad. Pipeline diameter is
<br />54-inch welded steel pipeline operating at a maximum pressure of 500 psi. The pipeline is routed
<br />through the cities of Carlsbad, San Marcos, and Vista. The electrical design included designing power
<br />for cathodic protection system at multiple locations, designing power, control and instrumentation for
<br />large flow control facility and underground turnouts.
<br />Mid -Basin Injection: Centennial Park Design Services, Orange County Water District, Fountain
<br />CA Four injection wells are included in this project and will be constructed below ground vaults.
<br />Wells are proposed to inject 12 MGD of GWRS water into the principal groundwater aquifer
<br />approximately 1,200 feet below ground surface. Submersible backflush pumps will be installed within
<br />the injection wells. Electrical Engineer responsible for designing two shared facilities' power distribution,
<br />injection well's instrumentation and control, communication with the other sites and headquarters.
<br />Long Beach 8 Valve Improvement, Electrical Power Svstem Upgrade. Long Beach Water
<br />Department, Long Beach, CA. Tetra Tech provided full service Construction Management Services
<br />for the Long Beach Water Department during construction for Long Beach Valve 8 Improvement
<br />Project. Work involved connection to the MWD pipeline at the Long Beach Valve 8 project sites just
<br />east of the intersection of Wardlow Road and Cherry Avenue complete with pipeline replacements and
<br />electrical and instrumentation upgrades. Mr. Kassar provided electrical and SCADA assistance during
<br />startup of the facility.
<br />SJVWB-ERRP Phase 1 Well Equipping and Treatment Facilities Preliminary Desian. Eastern
<br />Municipal Water District, San Jacinto, CA. Supervising the electrical design for a project that
<br />includes preparation of a Preliminary Design Report with an evaluation of the pipeline corridors from
<br />four wells to a central treatment plant, review of treatment technology for iron and manganese removal,
<br />disinfection using chloramines, booster pump station and reservoir and well equipping evaluation.
<br />Preliminary design drawings will be prepared to a 30% design level that addresses the civil site,
<br />mechanical, process, electrical and instrumentation components of the treatment and blending facility,
<br />site work and pipeline plan and profile sheets. Project field work will consist of a geotechnical
<br />investigation of the well sites, treatment plant and pipeline corridors, aerial and ground survey,
<br />potholing and corrosion analysis.
<br />TETRA TECH