SA-2 Pressure Control Station Relocation
<br />and Transmission Main Improvements
<br />RFP No. 21-i 27
<br />Peter Kim, PE, PTE
<br />Traffic r'ontrol
<br />Mr. Kim has more than 27 years of experience in transportation
<br />and traffic engineering. Peter's project experience includes
<br />numerous traffic signal designs, street lighting plans, ramp -
<br />metering plans, traffic monitoring stations, signing and striping
<br />plans, traffic control plans for major freeway projects, and traffic
<br />impact studies for various developments. Peter has been
<br />responsible for over 20 freeway projects requiring preparation of
<br />traffic design plans and traffic management plans throughout
<br />Southern California. Mr. Kim has also prepared traffic control
<br />plans for various water districts on more than 100 projects.
<br />Additionally, Peter is the owner/principal of PMK Associates,
<br />Inc., a SBE certified firm which provides traffic engineering
<br />services to Tetra Tech along with other commercial and private
<br />clients.
<br />EXPERIENCE
<br />Education:
<br />BS, Civil Engineering, Cal
<br />Poly Pomona, 1989
<br />Reg istrations/Certifications:
<br />Professional Civil Engineer,
<br />California, No. 51616, 1994
<br />Professional Traffic Engineer,
<br />California, No. 1871
<br />Professional Affiliations:
<br />American Society of Civil
<br />Engineers
<br />Institute of Transportation
<br />Engineers
<br />Office Location:
<br />Irvine, CA
<br />Total Years of Experience:
<br />27
<br />Years with Tetra Tech:
<br />nn .: nn ... .IL.. . nl:—..—I \AL.L.
<br />e���ation o - nc ransrr'��'-~ 27
<br />I nl:-..-I r►A Mr. Kim was contracted by Tetra Tech
<br />to prepare traffic control plans along Oso Parkway at Cabot Road in the City of Laguna Niguel.
<br />Harvarri Axle. Tr-r-k -qp'kn/pr Diversion Rfrilt-fure Rehabilitation. Irving Ranch Water District, Irvine,
<br />CA. Traffic Engineer. Prepared six (6) traffic control plans in the City of Irvine.
<br />Regional Lift Station Force Main Renlacement. Moulton Niguel Water District, Moulton Niguel,
<br />CA. Traffic Engineer. Prepared nine (9) traffic control plans in the City of Aliso Viejo.
<br />Peter's Canyon Channel Water Capture & Reuse Pipeline, Irvine Ranch Water District, Irvine,
<br />CA. Mr. Kim was contracted by Tetra Tech as the Lead Traffic Engineer for the preparation of traffic
<br />control plans for 17,000 linear feet of pipeline along Harvard Avenue in the City of Irvine.
<br />Carlsbad Seawater Desalination L;onve) Le Pipeline, Poseidon Resources Corporation,
<br />Mr. Kim was contracted by Tetra Tech as the Traffic Engineer Lead for the preparation
<br />of traffic control plans for 52,000 linear feet of pipeline that serves the product water from the planned
<br />50 mgd desalination plant in the City of Carlsbad. Pipeline diameters ranged from 24-inch to 54-inch
<br />welded steel pipeline operating at a maximum pressure of 800 psi. Seven flow control facilities were
<br />planned. The pipeline was routed through the cities of Carlsbad, San Marcos, Vista and Oceanside. In
<br />addition, there were two bridge crossings, Caltrans right-of-way crossing, railroad crossing, and several
<br />bore and jack crossings located throughout the project. Final Traffic Control plans were prepared for
<br />permitting through the City of Carlsbad and Caltrans.
<br />^^*r Under PMK Associates, as the Lead Traffic Design Engineer, Mr. Kim was responsible for
<br />preparing corridor -wide traffic study report and corridor wide master overhead sign plans, master
<br />corridor operating system and master corridor lighting plans for SR-241 Foothill Transportation
<br />Corridor.
<br />Anaheim Regional Transportation Intermodal Center (ARTIC), City of Anaheirr. Under PMK
<br />Associates, as the Lead Traffic Design Engineer, Mr. Kim was responsible for the 100% PSE for traffic
<br />signals, signing and striping, stage construction, and street lighting for ARTIC; a transit hub designed to
<br />tie together freeways, bus routes, and rail system as well as allow for future expansion to incorporate
<br />the California High -Speed Rail.
<br />TETRA TECH
<br />
|