Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-i 27 <br />Peter Kim, PE, PTE <br />Traffic r'ontrol <br />Mr. Kim has more than 27 years of experience in transportation <br />and traffic engineering. Peter's project experience includes <br />numerous traffic signal designs, street lighting plans, ramp - <br />metering plans, traffic monitoring stations, signing and striping <br />plans, traffic control plans for major freeway projects, and traffic <br />impact studies for various developments. Peter has been <br />responsible for over 20 freeway projects requiring preparation of <br />traffic design plans and traffic management plans throughout <br />Southern California. Mr. Kim has also prepared traffic control <br />plans for various water districts on more than 100 projects. <br />Additionally, Peter is the owner/principal of PMK Associates, <br />Inc., a SBE certified firm which provides traffic engineering <br />services to Tetra Tech along with other commercial and private <br />clients. <br />EXPERIENCE <br />Education: <br />BS, Civil Engineering, Cal <br />Poly Pomona, 1989 <br />Reg istrations/Certifications: <br />Professional Civil Engineer, <br />California, No. 51616, 1994 <br />Professional Traffic Engineer, <br />California, No. 1871 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Institute of Transportation <br />Engineers <br />Office Location: <br />Irvine, CA <br />Total Years of Experience: <br />27 <br />Years with Tetra Tech: <br />nn .: nn ... .IL.. . nl:—..—I \AL.L. <br />e���ation o - nc ransrr'��'-~ 27 <br />I nl:-..-I r►A Mr. Kim was contracted by Tetra Tech <br />to prepare traffic control plans along Oso Parkway at Cabot Road in the City of Laguna Niguel. <br />Harvarri Axle. Tr-r-k -qp'kn/pr Diversion Rfrilt-fure Rehabilitation. Irving Ranch Water District, Irvine, <br />CA. Traffic Engineer. Prepared six (6) traffic control plans in the City of Irvine. <br />Regional Lift Station Force Main Renlacement. Moulton Niguel Water District, Moulton Niguel, <br />CA. Traffic Engineer. Prepared nine (9) traffic control plans in the City of Aliso Viejo. <br />Peter's Canyon Channel Water Capture & Reuse Pipeline, Irvine Ranch Water District, Irvine, <br />CA. Mr. Kim was contracted by Tetra Tech as the Lead Traffic Engineer for the preparation of traffic <br />control plans for 17,000 linear feet of pipeline along Harvard Avenue in the City of Irvine. <br />Carlsbad Seawater Desalination L;onve) Le Pipeline, Poseidon Resources Corporation, <br />Mr. Kim was contracted by Tetra Tech as the Traffic Engineer Lead for the preparation <br />of traffic control plans for 52,000 linear feet of pipeline that serves the product water from the planned <br />50 mgd desalination plant in the City of Carlsbad. Pipeline diameters ranged from 24-inch to 54-inch <br />welded steel pipeline operating at a maximum pressure of 800 psi. Seven flow control facilities were <br />planned. The pipeline was routed through the cities of Carlsbad, San Marcos, Vista and Oceanside. In <br />addition, there were two bridge crossings, Caltrans right-of-way crossing, railroad crossing, and several <br />bore and jack crossings located throughout the project. Final Traffic Control plans were prepared for <br />permitting through the City of Carlsbad and Caltrans. <br />^^*r Under PMK Associates, as the Lead Traffic Design Engineer, Mr. Kim was responsible for <br />preparing corridor -wide traffic study report and corridor wide master overhead sign plans, master <br />corridor operating system and master corridor lighting plans for SR-241 Foothill Transportation <br />Corridor. <br />Anaheim Regional Transportation Intermodal Center (ARTIC), City of Anaheirr. Under PMK <br />Associates, as the Lead Traffic Design Engineer, Mr. Kim was responsible for the 100% PSE for traffic <br />signals, signing and striping, stage construction, and street lighting for ARTIC; a transit hub designed to <br />tie together freeways, bus routes, and rail system as well as allow for future expansion to incorporate <br />the California High -Speed Rail. <br />TETRA TECH <br />