Laserfiche WebLink
ON -CALL TRANSPORTATION ENGINFFRING/K..ANNINC <br />SERVICES FOR CAI_:. POLY POW <br />POMONA, CA 0 <br />(2008 - ONGOING) <br />Fehr & Peers has served as on -call transportation engineering staff to Cal Poly Pomona for over ten <br />years. Fehr & Peers has assisted with site access, traffic studies, signage, signal design, conceptual <br />designs, and major planning efforts, including some of the following major efforts on campus: <br />• University Shuttle Only Lane Design (2020-Ongoing) — Fehr & Peers first led a feasibility <br />study for the shuttle only lane design project along University Drive around Cal Poly Pomona. Fehr & <br />Peers is currently providing traffic engineering recommendations, the signing and striping plans, and <br />lighting design plans during the PS&E phase. <br />• Campus Master Plan Update & EIR (2017-Ongoing) — Fehr & Peers was part of the <br />Campus Master Plan Update and provided recommendations on campus mobility including vehicle <br />access, parking, transit access, bike access and on -campus pedestrian mobility. Fehr & Peers is <br />currently preparing the transportation impact analysis for the EIR. <br />• TDM Plan (2021-Ongoing) — Fehr & Peers is currently leading the campus' first <br />comprehensive Travel Demand Management (TDM) Plan. Fehr & Peers is undertaking a data -driven <br />approach to recommend policies to better manage trips and parking on campus. <br />• Kellogg Dr. & University Dr. Signal Design (2013-2014) — Fehr & Peers designed a traffic <br />signal and sign inglstriping improvements at the Kellogg Drive & University Drive intersection. The <br />project plans, specifications, and cost estimates were developed using the applicable Caltrans <br />Standard Plans, and specifications and standards provided by the Campus. The signal was designed <br />to include interconnect infrastructure to connect to downstream intersections. <br />• On -Campus Bike Lane Design (2013) — Fehr & Peers completed the campus' first on - <br />campus bike lane design, The facility stretches from Parking Lot B, adjacent to South Campus Drive <br />and the proposed Mobility Hub site, up to the center core of campus. <br />Client Reference <br />Danny Wu, Executive <br />Director, Transportation and <br />Planning <br />Cal Poly Pomona <br />3801 W Temple Ave, <br />Pomona, CA 91768 <br />e: dannywu@cpp.edu <br />(909) 869 - 5044 <br />,�t�3ff Involved. <br />Jason Pack <br />Steve Brown <br />Paul Herrmann <br />Claude Strayer <br />Mike Johnstone <br />$500,000+ <br />RFP NO 21-125 19 <br />