My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - On -Call Transportation and Traffic Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 17 - On -Call Transportation and Traffic Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:34:36 PM
Creation date
8/16/2023 11:43:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4.4 — Documentation <br />Fehr & Peers will prepare a draft transportation impact study report that summarize the analysis <br />methods, data, and the results of the VMT impact analysis; the non -automotive assessment; and <br />the methods, data, and results of the LOS assessment. <br />The draft report will be submitted to the project team for review. We have included up to four hours <br />of staff time to respond to one round of consolidated comments from the project team on the draft <br />report. <br />The updated report will be submitted to the City for review. We have included up to four hours of <br />staff time to respond to one round of consolidated comments from the City on the draft report. The <br />final report will be submitted to the project team. <br />Task 4.5 — Meetings <br />This proposal includes attendance at up two virtual meetings. Please note additional meetings <br />requested outside of this scope of work will be scoped and budgeted on a time -and -materials basis <br />with prior authorization from the client. <br />Schedul3 <br />Fehr & Peers can complete Tasks 1-4 according to the following schedule: <br />Task 1 — Fehr & Peers will submit the draft scoping memorandum within two weeks of receiving a <br />task order from the City of Santa Ana. We will respond to comments within one week and submit a <br />final scoping memo. <br />Task 2 — The draft VMT screening assessment will be completed within two weeks of an approved <br />scoping memo. We will respond to comments within one week and submit a final screening memo. <br />Task 3 — Fehr & Peers will complete VMT modeling and forecasting within four weeks of an <br />approved screening memo. This data can then be used in the Noise and GHG sections of the EIR. <br />A draft transportation impact assessment will be submitted two weeks after the modeling and <br />VMT forecasting is completed. We will respond to comments within one week and submit a final <br />Transportation Impact Analysis memo. <br />Task 4 — Fehr & Peers will order traffic counts following an approved scoping memo. We will <br />complete a draft LOS traffic study within six weeks of receiving the traffic counts. We will respond to <br />comments within two weeks and submit a final LOS traffic study report. <br />Disclaimer: Please note that the above schedule represents a sample of an appropriate schedule <br />for the time to complete the sample scope of work. All schedules will need to be negotiated based <br />on the scope of work, context of the project, and staff availability. <br />22 FEHR & PEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.