My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - On -Call Transportation and Traffic Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 17 - On -Call Transportation and Traffic Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:34:36 PM
Creation date
8/16/2023 11:43:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on bus stop/route relocations and fine-tuned traffic signal timing of critical intersections as the <br />construction phases progressed, monitored neighborhood traffic conditions to assess the need for <br />implementation of the neighborhood traffic mitigation tool box, and assisted the City Council in <br />making the decision to revise the design plans to add bicycle lanes to the project. Through these <br />efforts, Iteris staff has been in the forefront of complete streets planning and design in Beverly Hills <br />and has successfully worked with policy makers, residents, and business leaders in evaluating <br />street design issues in the City. As part of design, Iteris led signing and striping including solid <br />bicycle lanes, decorative street lighting including illumination analysis using AGi32 software, traffic <br />signal modifications at all signalized intersections and coordinated with IT communication design. <br />The construction of the project completed June 2018. <br />BUENA PARK ON -CALL TRANSPORTATION ENGINEERING — CITY OF BUENA PARK, CA <br />Reference Nabil Henein, Interim Director of Public Works, City of Buena Park, 6550 Beach Blvd <br />Buena Park, CA, 90622, NHenein@buenapark.com, (714) 562-3670 <br />Duration December 2015 — June 2019 Budget $500,000+ <br />July 2015, the City initiated a new approach to managing transportation issues, and determined that <br />future transportation engineering services would be more efficiently provided by consultants rather <br />than City staff. Iteris currently provides on -site staffing four days per week, functioning as an <br />extension of City staff and participated in interdepartmental meetings on new developments and <br />initiatives. Iteris staff also reviewed plans for new developments and temporary construction <br />closures, represented the City at County -level meetings, coordinated maintenance responsibilities <br />with the City's traffic signal maintenance contractor, and addressed traffic inquiries from City <br />Councilmembers and residents. Furthermore, Iteris staff provided training and education to City <br />staff so they can be well -versed in the full capabilities of the City's TMC and signal system. <br />Iteris staff also attended City Council and Transportation Commission <br />meetings on behalf of the City, speaking to projects and specific — g <br />items under consideration. Lastly, Iteris staff prepared and submitted <br />a grant application for the Caltrans Active Transportation Plan (ATP) + <br />_ <br />Cycle 3 call for projects for a Safe Routes to School (SR2S) project. <br />As part of this application, improvements to pedestrian facilities <br />around elementary schools and school bus stops were researched~ " <br />and identified. The grant application was selected by OCTA for <br />funding via the County's Measure M sales tax measure, and Iteris ; <br />worked with the City to fast -track funding and completion. ' <br />¢I <br />Projects Included: x ' <br />• On -Site Staffing ($454,334; 2016 — Ongoing) <br />• On -Call TMC Support ($117,950; 2016 — Ongoing).-- <br />• Los Coyotes Traffic Study Review ($2,400; 1/2016 — 5/2016) <br />• Traffic Circulation at Beach Boulevard/La Mirada <br />Boulevard/Santa Guertrudes ($5k; 2/2016 — 5/2016) <br />• Fire Station 63 TSD ($17,860; 10/2016 — Ongoing) <br />• Beach Wayfinding Signs Electrical Plans ($5k; 5/2017 — 3/2018) <br />• Porto's Parking and Queuing Analysis ($5k; 5/2017 — 6/2017) <br />• Installation of Surge Protectors & Signal Inventory Update ($2,640; 5/2017 — 12/2017) <br />• Commonwealth and Indiana Avenue Traffic Signal Support ($2,864; 7/2017 — 9/2017) <br />• Municipal Code Review ($7k; 8/2017 — 12/2017) <br />• Manual Advance Push Button System ($2k; 8/2017 — 12/2017) <br />• Install four (4) Wireless Radios along Crescent Avenue ($3k; 1/2018 — 6/2018) <br />Santa Ana, On -Call Transportation & Traffic Engineering Services (RFP No. 21-125) <br />Iteris, Inc. 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.