My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - On -Call Transportation and Traffic Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 17 - On -Call Transportation and Traffic Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:34:36 PM
Creation date
8/16/2023 11:43:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAULIO RAMIREZ, PE <br />Project Manager <br />1-405 Design -Build Improvement Project, Orange <br />County Transportation Authority (OCTA) — Orange <br />County, CA <br />Mr. Ramirez is serving as a Project Engineer for <br />Iteris, acting as a subconsultant of a multidisciplinary <br />design and construction team, on this $1.2 billion <br />dollar design build project in Orange County <br />California. The project will improve 16 miles of the I- <br />405 between the SR-73 freeway in Costa Mesa and <br />the I-605 near the Los Angeles County line. The <br />project includes adding one regular lane in each <br />direction from Euclid Street to I-605, making <br />improvements to freeway entrances, exits and <br />bridges, and will also implement Express Lanes that <br />expands the existing HOV lane from one lane to two <br />lanes in each direction from SR-73 to I-605. Iteris is <br />responsible for the design of the Caltrans ITS field <br />infrastructure, temporary ITS field infrastructure <br />supporting maintenance of traffic during <br />construction, toll system infrastructure and <br />coordination, street lighting, agency traffic signal <br />improvements along the corridor and development <br />of the project Traffic Management Plan. Mr. Ramirez <br />is responsible for preparing Electronic Toll and <br />Traffic Management ETTM and signal plans. The <br />project began in February 2017 and is ongoing. <br />Traffic Signal Modifications for Hawthorne <br />Boulevard and Highridge Boulevard Road — <br />Hawthorne, CA <br />Mr. Ramirez served as Project Manager responsible <br />for coordinating field work, review of Traffic Signal <br />Modification Plan, Specifications and Estimates (PS&E) <br />for the intersection at Hawthorne Boulevard and <br />Highridge Road under an on -call agreement with the <br />City. The project installed a blank -out "No U Turn" <br />sign and new controller to provide conditional <br />northbound right -turn overlap operations. The project <br />began in October 2017 and completed in July 2018. <br />5th Street Communication Upgrades — San <br />Bernardino, CA <br />Mr. Ramirez serves as Project Manager on this <br />communication infrastructure upgrades project for <br />the City of San Bernardino. Wireless and twisted <br />wire pair interconnect upgrades will be installed to <br />bring traffic signal connectivity between the TMC <br />and intersections along 51h Street between H Street <br />and Sierra Way. Iteris is preparing the design plans, <br />procuring and configuring the equipment, and will <br />be providing integration and construction support <br />iteris <br />services during construction. The project began in <br />January 2019 and is expected to be completed in <br />June 2019. <br />C-Street Improvement — Port of Los Angeles, CA <br />Mr. Ramirez served as Project Engineer assisting <br />with the development of the design package for the <br />C-Street improvement project that included traffic <br />control, stage construction, signing and striping, and <br />traffic signal design plans for the existing and new <br />roadway alignment for the project area. The project <br />began in December 2011 and completed in <br />December 2014. <br />Bristol Street Traffic Signal Synchronization Project <br />(TSSP), Orange County Transportation Authority <br />(OCTA) — Orange County, CA <br />As Project Manager, Mr. Ramirez' responsibility was <br />to ensure all project stakeholders received the <br />equipment and signal timing improvement <br />requested for this project. This OCTA-led project <br />consists of 45 study intersections along the eight - <br />mile stretch of Bristol Street in the cities of Santa <br />Ana, Costa Mesa, and Newport Beach. Mr. Ramirez <br />coordinated with his team to provide necessary ITS <br />improvements (e.g. controller, Ethernet switches, <br />communication, Bluetooth travel time devices, <br />detection, etc.). These improvements fed into the <br />ultimate goal of the project, which was regional <br />synchronization. The project began in July 2016 and <br />completed in December 2018. Two years of <br />Operations and Maintenance (O&M) will be <br />provided through January 2020. <br />Hamner Avenue Traffic Signal Synchronization <br />Project (TSSP) — Eastvale, CA <br />Mr. Ramirez served as the Lead Engineer to provide <br />traffic/ITS design services for the City of Eastvale as <br />part of Iteris' on -call traffic signal operations <br />contract. The project involves the design of new <br />fiber-optic communications systems along 6 <br />intersections of Hamner Avenue, as well as the <br />upgrade of Video Detection Systems (VDS) at two <br />intersections. In addition to the traffic signal <br />infrastructure improvements, Iteris is also <br />developing signal coordination plans for AM, Mid - <br />Day, and PM peak hours for all project traffic signals <br />along the corridor. The project began in June 2014 <br />and completed June 2016. <br />
The URL can be used to link to this page
Your browser does not support the video tag.