Laserfiche WebLink
BERNARD K. U, EE, TE, PTOE <br />Principal -in -Charge <br />Traffic and Parking Analysis for a Senior Day Care <br />Center— Montebello, CA <br />Mr. Li served as Project Manager for the traffic and <br />parking analysis of a proposed Senior Day Care Center <br />located on Beverly Boulevard at Taylor Street in the <br />City of Montebello. The study addressed different <br />traffic issues related to the proposed project, <br />including: on -site parking requirements, on -site <br />circulation evaluation, passenger loading and <br />unloading recommendations, and traffic impact <br />analysis. Duration: 4 months (2002) <br />Traffic Study for a Commercial Development on <br />Pipeline Avenue — Chino Hills, CA <br />Mr. Li served as Project Manager to prepare a traffic <br />impact study for a proposed commercial development <br />located on Pipeline Avenue just north of Chino Hills <br />Parkway (SR-142) in the City of Chino Hills. A total of <br />nine intersections were included in the study. <br />Different scenarios for Opening Year and Horizon Year <br />were analyzed and feasible mitigation measures were <br />presented for intersections with significant impacts. <br />The project required coordination with and approval <br />from City of Chino Hills, City of Chino and Caltrans. <br />Duration: 8 months (2003) <br />Traffic and Parking Study for Bernards Bros <br />Headquarters — San Fernando, CA <br />Mr. Li served as Project Manager and Traffic <br />Engineer to prepare a traffic impact and parking <br />study for a proposed multi -story headquarters <br />building of Bernards Bros Construction Company in <br />the City of San Fernando. The project also involved <br />vacating Ilex Street at Fox Street to accommodate <br />the new parking lot. Closure of Ilex Street would <br />result in loss of several on -street parking spaces. <br />Besides evaluating the traffic impacts as a result of <br />the project and street closure, the study also <br />addressed the effect of the loss of parking spaces to <br />the surrounding businesses. Mr. Li attended the <br />Planning Commission and the City Council meetings <br />to present the study results and to answer questions <br />from the Commission/Council Members and from <br />local businesses within the project area. The project <br />was subsequently approved by the City Council. <br />Duration: 9 months (2003) <br />Traffic Study for South Center Street PSSR — <br />Westmorland, CA <br />Mr. Li served as Project Manager for the preparation <br />of a traffic study along South Center Street from <br />Highway 86 to Baughman Road in the City of <br />iteris <br />Westmorland. The City of Westmorland is in a <br />strategic location on the northwestern portion of <br />Imperial County and serves as the gateway into the <br />Imperial Valley from Los Angeles and Riverside <br />Counties. Hwy 86, which traverses in an east -west <br />direction through the City, is the primary surface <br />transportation corridor into the County. With the <br />implementation of the North American Fair Trade <br />Agreement (NAFTA), the region has experienced a <br />dramatic increase in surface transportation, especially <br />18-wheel truck traffic. The purpose of the study was <br />to forecast the future traffic demands, including truck <br />traffic, in 5-, 10- and 20-year horizon, and to propose <br />improvements at key intersections that would <br />alleviate any future traffic problems. A traffic signal <br />warrant analysis was also conducted at the <br />intersection of S. Center Street and Hwy 86 as part of <br />this project. Duration: 11 months (2002) <br />On -Call Traffic Engineering Consultant — Eastvale, CA <br />Mr. Li served as a Traffic Engineering Consultant for <br />City of Eastvale from March 2014 to June 2016: <br />• Citywide signal timing monitoring, including <br />responding to residents' requests for timing check <br />• Citywide traffic signal equipment inventory <br />• Traffic signal timing parameter update per latest <br />MUTCD requirements <br />• Traffic signal warrant analysis <br />• Traffic signal timing sheets preparation for new <br />signals <br />• Fiber optic communication upgrade design for <br />Hamner Avenue <br />• Traffic signal synchronization along Hamner Ave <br />State Route 75 (SR-75) Adaptive Traffic Signal <br />Control (ATSC) System — Coronado, CA <br />Mr. Li served as Project Manager for this project <br />which consists of the evaluation, design, installation, <br />and maintenance of the Siemens SCOOT ATSC system <br />at four signalized intersections along SR-75, next to <br />the Navy Amphibious Base in the City of Coronado. <br />Iteris, as part of a multidisciplinary team, is <br />responsible for conducting the "before/after" study <br />analysis to assess the efficiency of the adaptive signal <br />system in reducing traffic congestion, delays, travel <br />times, and traffic emissions along the study segment. <br />In addition, during the installation of the ATSC system, <br />Iteris utilized a Synchro simulation model to quantify <br />the expected traffic flow improvements that the ATSC <br />system brought. The project began in July 2017 and <br />completed in April 2018. <br />