My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 3:45:18 PM
Creation date
8/16/2023 3:41:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Document Completion Date <br />Responsible Location <br />Implementing Responsible Monitoring Responsible Project Mitigation <br />Mitigation Measure Timing Party Monitoring Party Record) Monitoring Party Monitor <br />background noise level or switch off back-up alarms and replace <br />with human spotters in compliance with all safety requirements <br />and laws. <br />Erect temporary noise barriers (at least as high as the exhaust of <br />equipment and breaking line -of -sight between noise sources and <br />sensitive receptors), as necessary and feasible, to maintain <br />construction noise levels at or below the performance standard of <br />80 dBA Leq. Barriers shall be constructed with a solid material <br />that has a density of at least 4 pounds per square foot with no <br />gaps from the ground to the top of the barrier. <br />N-2 Prior to issuance of a building permit for a project requiring pile driving Prior to the Project City of Santa City of Santa <br />during construction within 135 feet of fragile structures, such as historical issuance of Applicant/ Ana Building Ana Building <br />resources, 100 feet of non -engineered timber and masonry buildings building permits Developer Safety Division Safety <br />e.g., most residential buildings), or within 75 feet of engineered concrete Division <br />and masonry (no plaster); or a vibratory roller within 25 feet of any <br />structure, the project applicant shall prepare a noise and vibration <br />analysis to assess and mitigate potential noise and vibration impacts <br />related to these activities. This noise and vibration analysis shall be <br />conducted by a qualified and experienced acoustical consultant or <br />engineer. The vibration levels shall not exceed Federal Transit <br />Administration (FTA) architectural damage thresholds (e.g., 0.12 inches <br />per second [in/sec] peak particle velocity [PPV] for fragile or historical <br />resources, 0.2 in/sec PPV for non -engineered timber and masonry <br />buildings, and 0.3 in/sec PPV for engineered concrete and masonry). If <br />vibration levels would exceed this threshold, alternative uses such as <br />drilling piles as opposed to pile driving and static rollers as opposed to <br />vibratory rollers shall be used. If necessary, construction vibration <br />monitoring shall be conducted to ensure vibration thresholds are not <br />exceeded. <br />N-3 New residential projects (or other noise -sensitive uses) located within Prior to the Project City of Santa City of Santa <br />200 feet of existing railroad lines shall be required to conduct a issuance of Applicant/ Ana Building Ana Building <br />groundborne vibration and noise evaluation consistent with Federal building permits Developer Safety Division Safety <br />Transit Administration (FTA)-approved methodologies. Division <br />Page 2 ace ork r
The URL can be used to link to this page
Your browser does not support the video tag.