My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 3:45:18 PM
Creation date
8/16/2023 3:41:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Responsible <br />Document <br />Location <br />Completion Date <br />Implementing Responsible Monitoring Responsible Project Mitigation <br />Mitigation Measure Timing Party Monitoring Party Record) Monitoring Party Monitor <br />N-4 During the project -level California Environmental Quality Act (CEQA) Prior to the Project City of Santa City of Santa <br />process for industrial developments under the General Plan Update or issuance of Applicant/ Ana Building Ana Building <br />other projects that could generate substantial vibration levels near building permits Developer and Safety Division Safety <br />sensitive uses, a noise and vibration analysis shall be conducted to Acoustical Division <br />assess and mitigate potential noise and vibration impacts related to the Engineer <br />operations of that individual development. This noise and vibration <br />analysis shall be conducted by a qualified and experienced acoustical <br />consultant or engineer and shall follow the latest CEQA guidelines, <br />practices, and precedents. <br />5.15 RECREATION <br />REC-1 The City shall monitor new residential development within the Dyer/55 Prior to the Project City of Santa City of Santa <br />Fwy focus area. Development proposals for projects including 100 or issuance of Applicant/ Ana Building Ana Building <br />more residential units shall be required to prepare a public park occupancy permits Developer Safety Division Safety <br />utilization study to evaluate the project's potential impacts on existing Division <br />public parks within a one half (1/2) mile radius to the focus area. The <br />evaluation shall include the population increase due to the project and <br />the potential for the new resident population to impact existing public <br />parks within the radius. Each study shall also consider the cumulative <br />development in the Dyer/55 Fwy and the potential for a cumulative <br />impact on existing public parks within the radius. <br />If the study determines that the project, or it's incremental cumulative <br />impacts would result in a significant impact (substantial physical <br />deterioration or substantial acceleration of deterioration) to existing <br />public parks, the project shall be required to mitigate this impact. <br />Measures to mitigate the significant impact may include but are not <br />limited to land dedication and fair -share contribution to acquire new or <br />to enhance existing public parks within the radius. Mitigation shall be <br />completed prior to issuance of occupancy permits. <br />5.16 TRIBAL CULTURAL RESOURCES <br />CUL-4 For projects with ground disturbance—e.g., grading, excavation, Prior to the Project City of Santa I City of Santa Itrenching, boring, or demolition that extend below the current grade— issuance of Applicant/ Ana Building Ana Building <br />prior to issuance of any permits required to conduct ground -disturbing grading permits Developer Safety Division <br />October 2 age 21
The URL can be used to link to this page
Your browser does not support the video tag.