Laserfiche WebLink
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Responsible <br />Document <br />Location <br />Completion Date <br />Implementing Responsible Monitoring Responsible Project Mitigation <br />Mitigation Measure Timing Party Monitoring Party Record) Monitoring Party Monitor <br />N-4 During the project -level California Environmental Quality Act (CEQA) Prior to the Project City of Santa City of Santa <br />process for industrial developments under the General Plan Update or issuance of Applicant/ Ana Building Ana Building <br />other projects that could generate substantial vibration levels near building permits Developer and Safety Division Safety <br />sensitive uses, a noise and vibration analysis shall be conducted to Acoustical Division <br />assess and mitigate potential noise and vibration impacts related to the Engineer <br />operations of that individual development. This noise and vibration <br />analysis shall be conducted by a qualified and experienced acoustical <br />consultant or engineer and shall follow the latest CEQA guidelines, <br />practices, and precedents. <br />5.15 RECREATION <br />REC-1 The City shall monitor new residential development within the Dyer/55 Prior to the Project City of Santa City of Santa <br />Fwy focus area. Development proposals for projects including 100 or issuance of Applicant/ Ana Building Ana Building <br />more residential units shall be required to prepare a public park occupancy permits Developer Safety Division Safety <br />utilization study to evaluate the project's potential impacts on existing Division <br />public parks within a one half (1/2) mile radius to the focus area. The <br />evaluation shall include the population increase due to the project and <br />the potential for the new resident population to impact existing public <br />parks within the radius. Each study shall also consider the cumulative <br />development in the Dyer/55 Fwy and the potential for a cumulative <br />impact on existing public parks within the radius. <br />If the study determines that the project, or it's incremental cumulative <br />impacts would result in a significant impact (substantial physical <br />deterioration or substantial acceleration of deterioration) to existing <br />public parks, the project shall be required to mitigate this impact. <br />Measures to mitigate the significant impact may include but are not <br />limited to land dedication and fair -share contribution to acquire new or <br />to enhance existing public parks within the radius. Mitigation shall be <br />completed prior to issuance of occupancy permits. <br />5.16 TRIBAL CULTURAL RESOURCES <br />CUL-4 For projects with ground disturbance—e.g., grading, excavation, Prior to the Project City of Santa I City of Santa Itrenching, boring, or demolition that extend below the current grade— issuance of Applicant/ Ana Building Ana Building <br />prior to issuance of any permits required to conduct ground -disturbing grading permits Developer Safety Division <br />October 2 age 21