My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 3:45:18 PM
Creation date
8/16/2023 3:41:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. ENVIRONMENTAL REVIEW AND PUBLIC PARTICIPATION PROCESS <br />In conformance with CEQA, the State CEQA Guidelines, and the City of Santa Ana CEQA <br />Guidelines, the City conducted an extensive environmental review of the proposed project. <br />The City of Santa Ana concluded that a PEIR should be prepared, and the Notice of <br />Preparation (NOP) was released for a 30-day public review period from February 26, 2020, <br />through March 27, 2020. The NOP was posted at the Orange County Clerk's Office on <br />February 26, 2020. The notice was published in the Orange County Register, a newspaper of <br />general circulation. Under CEQA, a lead agency may proceed directly with preparation of a <br />PEIR without preparation of an Initial Study if it is clear that a PEIR will be required (State <br />CEQA Guidelines § 15060[d]). The City of Santa Ana made such a determination for this <br />project and did not prepare an Initial Study. <br />Completion of a scoping process, in which the public was invited by the City of Santa Ana to <br />participate. The scoping meeting for the PEIR was held on March 5, 2020, at 6:00 p.m. at the <br />Santa Ana Police Community Room at 60 Civic Center Plaza in Santa Ana. The notice of a <br />public scoping meeting was included in the NOP distributed on February 26, 2020. <br />Preparation of a Draft PEIR by the City of Santa Ana, which was made available for a 45- day <br />public review period (August 3, 2020, through September 16, 2020) and extended to October <br />6, 2020. The Notice of Availability (NOA) for the Draft PEIR was sent to all persons, agencies, <br />and organizations on the list interested persons, sent to the State Clearinghouse in <br />Sacramento for distribution to public agencies, and published in the August 3, 2020, Orange <br />County Register. The NOAwas posted at the Orange County Clerk's Office on August 3, 2020. <br />Copies of the Draft PEIR were made available for public review at the City of Santa Ana, <br />Planning Division Counter at 20 Civic Center Plaza, M-20, Santa Ana, CA 92701, and the City <br />of Santa Ana Public Library at 26 Civic Center Plaza, Santa Ana, CA 92701. The Draft EIR <br />was also available for review and download on City website: https://www.santa- <br />ana.org/general-plan. <br />The Final PEIR contained comments on the Draft PEIR, responses to those comments, <br />revisions to the Draft PEIR, if any, and appended documents. The Final PEIR was released <br />for a 10-day agency review period prior to certification of the Final PEIR. <br />At its November 91 2020, public hearing, the Planning Commission voted not to certify the <br />Final PEIR and continue work on the GPU to a future date to allow additional time for outreach <br />to Santa Ana's environmental justice (EJ) communities. <br />The City performed an intensive, extended community outreach program conducted between <br />January and May 2021 as described in Section 2.4 of the Updated Draft PEIR (Volume II of <br />the Recirculated Final PEIR). <br />Pursuant to Draft PEIR comments, the Planning Commission public hearing, and an <br />expanded EJ community outreach program, the City made the decision to prepare a <br />Santa Ana General Plan Update <br />CE <br />Of <br />1 <br />i 5 FactanStatement41 — 42 12/' / 021 <br />Of v ri ing onsiderations -19- iOctober 2021
The URL can be used to link to this page
Your browser does not support the video tag.