My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 3:45:18 PM
Creation date
8/16/2023 3:41:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recirculated Draft PEIR to discuss and evaluate impacts related to environmental justice, to <br />conclude that the recreation -related impacts of the proposed GPU would result in a significant <br />impact, and to define a new project alternative to reduce recreational impacts. <br />The City recirculate the Draft PEIR chapters that had been revised and the NOAwas released <br />for a 45-day public review period from August 6, 2021 through September 20, 2021. The NOA <br />directed reviewers to only submit comments on the revised Draft PEIR chapters included in <br />the Recirculated Draft PEIR since the comments in the Final PEIR adequately addressed <br />comments received on portions of the Draft PEIR that had not been recirculated. <br />One September 13th, the City conducted a Planning Commission Study Session to discuss <br />the Recirculated Draft PEIR. Verbal comments from the public, received during the Study <br />Session were addressed in the Final Recirculated PEIR. <br />After considering the PEIR and in conjunction with making these findings, the City of Santa <br />Ana hereby finds that, pursuant to Section 15092 of the CEQA Guidelines, approval of the <br />project will result in significant effects on the environment; however, the significant effects will <br />be eliminated or substantially lessened where feasible, and the City has determined that <br />remaining significant effects are acceptable under Section 15093. <br />The Mitigation Monitoring and Reporting Program is hereby adopted to ensure implementation <br />of feasible mitigation measures identified in the PEIR. The City of Santa Ana finds that these <br />mitigation measures are fully enforceable conditions on the project and shall be binding upon <br />the City and affected parties. <br />The City of Santa Ana finds that the project is in the public interest and is necessary for the <br />public health, safety, and welfare. <br />The City of Santa Ana hereby certifies the Final Recirculated PEIR in accordance with the <br />requirements of CEQA. <br />Pursuant to CEQA Guidelines Section 15095, staff is directed as follows: a) copy of the Final <br />Recirculated PEIR and CEQA Findings of Fact shall be retained in the project files; b) copy of <br />the Final Recirculated PEIR and CEQA Findings of Fact shall be provided to all CEQA <br />responsible" agencies. <br />Santa Ana General Plan Update <br />CE <br />Of <br />i <br />i 5 FactanStatement41 — 43 12/' / 021 <br />Of v ri ing onsiderations -20- October 2021
The URL can be used to link to this page
Your browser does not support the video tag.