My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Pavement Management Program Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
10/19/2021 Regular and Special
>
Item 18 - Pavement Management Program Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:01:03 AM
Creation date
8/17/2023 8:48:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
10/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need / Scope of Work <br />TASK 2.4: Budgetary Analysis <br />Bucknam will review all city provided maintenance projects that have been completed since the <br />last major PMP update (i.e. June 2019) as well as a listing of "scheduled" for M&R over the next <br />seven years. These records will be assessed and entered into StreetSaver. Our staff will <br />generate an updated work history report for City review and compliance. <br />We will assist the City in developing the most cost-effective preventative maintenance, <br />rehabilitation and R&R strategies possible. This will be accomplished by meeting with the City to <br />discuss and strategize maintenance activities that are currently being used by the City. Based on <br />the City's current AC & PCC applications and other M&R practices used we will conduct an <br />historical and prospective analysis on the conditional and financial impact these current practices <br />have on the pavement network. Based on our fiscal and deterioration analysis, we will present <br />our results and recommendations to City staff. This analysis will become an essential building <br />block for the 2022-2029 fiscal year maintenance programs. <br />We will establish/update a M&R "decision tree" that will be used to generate pavement <br />recommendations that match current 2021 practices. This will be accomplished by <br />assessing/updating the unique and individual deterioration curves within StreetSaver based on <br />functional class (i.e. arterial, collector, local), ride quality, traffic volumes and age. <br />Our staff will review the Santa Ana's deterioration curves that have been developed based on <br />historical pavement condition, inspection, surface type, StreetSaver deterioration, and road class. <br />The curves will be modified based on 2021 pavement conditions. The strategies that are typically <br />reviewed are rehabilitation and reconstruction (R&R), localized maintenance, slurry seals, and <br />various overlay types, the expected improvement in pavement condition, the life -cycle extension <br />that would result and the unit costs for maintenance. <br />All maintenance practices/unit costs will be integrated into StreetSaver and will be derived from <br />the most recent construction bids for pavement rehabilitation. We will account for inflation rates <br />when long-term revenues projections are made. <br />Our staff will also update the City's residential maintenance zone approach. We will focus on <br />projecting budgets and maintenance recommendations for all streets within maintenance <br />zones; this will allow us to proactively schedule maintenance efforts throughout the multi -year <br />CIP as well as achieve the desired level of PCI across the City. <br />Our Project Manager and Principal will work closely with City in defining repair and <br />rehabilitation strategies during each fiscal year (i.e. 2022-2029). Once the repair/rehabilitation <br />strategies have been defined, the identification of a seven year Forecasted Maintenance <br />schedule will be generated. The recommended budget scenarios will be identified on the basis <br />of several criteria: <br />• Assessment and review of the City's Pavement CIP; <br />• Present pavement conditions; Desired levels of service and available resources; <br />• Cost benefit of individual strategies (e.g. maintain 80 PCI, reach a PCI of 85 in 7-years); <br />• Recommendations budget strategies and unit costs <br />City of Santa Ana 3-6 <br />Pavement Management Program Update <br />
The URL can be used to link to this page
Your browser does not support the video tag.