Laserfiche WebLink
Standard Hourly Rate Schedule <br />Category <br />Rate <br />Principal <br />$ 295 <br />Senior Project Manager <br />215 <br />Senior Engineer/Planner <br />195 <br />Construction Manager <br />190 <br />Pavement Management Project Manager <br />190 <br />Management Analyst <br />165 <br />Project Engineer/Planner <br />160 <br />Engineer/Senior Technician /Sr. GIS Analyst /Senior Inspector <br />145 <br />Assistant Engineer/ GIS Analyst / Inspector <br />135 <br />CARD Operator <br />110 <br />Administrative Assistant <br />100 <br />Field /GIS Technician <br />94 <br />Clerical/ Word Processing <br />80 <br />Forensic Services <br />Quote <br />Reimbursables <br />Mileage <br />$ 0.57/mile <br />Subconsultant Services <br />Cost + 15% <br />Reproduction <br />Cost + 15% <br />Travel & Subsistence <br />Cost + 15% <br />Fees & Permits <br />Cost + 15% <br />Computer Services (External) <br />Cost +15 <br />Standard Hourly Rates <br />shown will not be <br />changed and/or <br />increased during the <br />contract period <br />3548 Seagate Oceanside, CA 90 <br />INFRASTRUCTURE GROUP, INCT:(knam inc.co 4 <br />www.bucltnam-inc.com <br />6-2 <br />