Laserfiche WebLink
TUSTIN AVENUE/ROSE DRIVE <br />RTSSP GRANT APPLICATION OCTOBER 2019 <br />SECTION 1: KEY TECHNICAL INFORMATION <br />a.The proposed project will synchronize Tustin Avenue/Rose Drive corridor from First Street in Santa Ana to <br />Wabash Avenue in Yorba Linda. The project includes fifty-four (54) signals over eleven and four tenths (11.4) <br />miles. Figure 1 shows a map of the project area. <br />Figure 1: Signalized intersection and proposed project limits. <br />1