Laserfiche WebLink
Dominguez General Engineering, Inc. <br />PO BOX 6234 ROSEMEAD CA. 91770 <br />PHONE 626-442-7444 FAX 626-442-7277 <br />DOMMGUEZGENERAL a AOL.COM <br />JOB REFERENCES[HISTORY <br />SEWER& STORM DRAIN <br />In Progress: <br />Job name: Oncall Emergency Sewer Repair ( In Progress) Supervised By Javier Mendoza <br />for City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA. 92701 <br />Contract: 3 year contract 2012/2014 <br />Contact: Rudy Rosas at 714-647-3379 <br />Job Name: Emergency Sewer repairs Supervised By Javier Mendoza <br />Owner: City of Fullerton <br />Type work: Emergency sewer repairs 12/2014 <br />Contact Name: Anthony Reynoso 714-738-6302or 714-4.12-1116 <br />Completed: <br />Job Name: Bid Schedule 1314, Empire Center Sewer Relocation <br />City of Burbank 275 E. Olive Ave. Burbank Ca. 91510 Supervised By Victor Dominguez <br />Type of Work: Installation of 10", 15" & 21' PVC Pipe Approx. 1,936 LF, Construct New 48", 60" manholes, construct new <br />48", 60" manhole around existing pipe, Reconnect active sewer lateral, construct storm drain squash box, removal and <br />replacement of existing 6" AC approx.. 3640 SF. Cap and grind 2" AC approx... 47,950, Curb, gutter and sidewalk <br />replacement. <br />Contract amount. 1,295,450,00 completion date 12/5/2013 <br />Contact Person: Daniel J. Rynn PE 818-238-3940 Inspector: Rick Wiggins 949-809-5000 cell 949-878-0154 <br />Job Name: Sewer Improvement Santa Fe and Highland Ave Project#51003 <br />Owner: City of Fullerton <br />Type work: installation on 12"vcp sewer IISOLF, 15" VCP 305LF, abandon 12",8" and <br />6" sewer main, construct] 0-48" manholes ,remove existing manholes and install 6"VCP lateral connections <br />Contract Amount: 394,070.00 Completed 8/30/2010 <br />Contact Name: Al O'Balles inspector 714-595-6718 Eric Villagracia assistant engineer 714-738-6945 <br />Job Name: Syracuse Ave Storm Drain Supervised By; Victor Dominguez <br />Owner: City Of Baldwin Park <br />Type Of Work: Installation of 48", 42", 36", 24" RCP Pipe. 28', 16', 14', wide Catch Basins, house connections, manholes <br />and concrete collars. <br />Contract Amount: $606,303.00 Completed 7/2009 <br />Contact: Edward Torres 626-960-4011 Engineering Assistant <br />Job Name: Civic Center Sewer Main supervised by; Adolfo Dominguez <br />Owner: City Of Santa Ana <br />Type Of Work: Construct 18", & 15" VCP Sewer Main, 6ft and 5ft. P.C.C. Sewer Manhole, <br />Contact amount. $800.000.00 Completed 9/06 <br />Contact Ed Torres 4714-647-5018 <br />Job Name: Bristol St_ Storm Drain Supervised By; Adolfo Dominguez <br />Owner: City Of Santa Ana <br />Type Work: Storm drain installation of 54", 48", RCP Pipe <br />Contract Amount: $1,635,274.00 Completed 4/07 <br />Contact Ed Torres #714-647-5018 <br />