My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Sewer System Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 13 - Sewer System Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:05:56 PM
Creation date
8/17/2023 5:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Name: Magnolia Blvd Sanitary sewer Main Supervised By; Adolfo Dominguez <br />Owner: City of Burbank <br />Type of Work: Sewer Replacement Contract Amount: $182,000.00 completed 7/2006 Contact: 818-238-3955 <br />.lob Name: Contract93840-0 sewer <br />Owner: City of Carlsbad <br />Type Of Work: <br />Construct 8" HDPE Sewer Pipe, 6" HDPE wet well, Curb and Gutter. <br />Contract amount: $199,201.00 completed 10114/2005 <br />Contact: Kevin #760-602-2720 <br />Job Name: Extension of Castle Storm Drain <br />Owner: City Of La. Canada Flintridge <br />Type of Work: Storm Drain installation. Installation of 24", 36", 48", 51 ", RCP pipe house laterals, <br />construct concrete collars, junction structures and curb and gutters. <br />Contract Amount: $314,120.00 Completed 11 /2009 <br />Contact: Nasser Shoushtarian 818-790-8882 Senior Civil Engineering <br />Job Name: Bristol St. Storm Drain <br />Owner: City Of Santa Ana <br />Type Work: Storm drain installation of 54", 48", RCP Pipe <br />Contract Amount: $1,635,274.00 Completed 4/07 <br />Contact Ed Torres #714-647-5018 <br />Job Name: Tesquequite Sewer <br />Owner: City of Riverside <br />Type Work: Sewer Replacement 36" VCP -Case Bedding, manholes, sidewalk, curb and gutters, 81" <br />storm drain Removal, abandon sewer mains. <br />Contract Amount $939,668 Completed 12/04/2006 <br />Contact: Daniel Ciaccella #951-826-5236 <br />"No Claims, Liquidated damages, Mediations, Arbitrations or Lawsuits" <br />All 100% constructed By Dominguez General Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.