Laserfiche WebLink
Type of Work: Installation of approximately 7,300 LF of 20" DIP, connection of mainlines to existing, installation of services, Air <br />Vacs. Blow offs, Flow Control Sation <br />Contract amount: $2,443,000 Completed 05/05/2015 <br />Contact: Mayra Cabrera 951-739-4842 Supervised by Javier Mendoza <br />Job Name: David Lane Pipeline Replacement <br />Owner: Eastern Municipal Water District, 2270 Trumble Rd. Perris Ca 92570 <br />Type of Work Installation of approximately 1985 PVC, connection of mainlines to existing, installation of services, PRV's DC DA <br />and abandonment of 4" ACP pipe <br />Contract amount: 925,000 Completed 11/29/2014 <br />Contact: Mario Rodriguez 951-300-3087 Supervised by Javier Mendoza <br />Job name Waterline Replacements in alleys and Streets Project# 10094 <br />Owner: City of Beverly Hills 345 Foothill Rd., Beverly Hills, CA. 90210 <br />Type of Work: 13,527 LF. of 8" DIP class 52 push on joints,2000 LF. of 8"class 52 restrained joints, Valve box, reconnect of fire <br />hydrants, fire services, domestic services, traffic meter boxes, sewer laterals, PCC alley approach, Polyethylene eneasernent around <br />pipe. <br />Contract: $2,296,500 Completion date: 7/31/2013 <br />Contact: Charles Gettler Inspector 310-925-0702 or Juan Martinez Civil Engineer Supervised by Victor Dominguez <br />Job Name: Cast Iron Main Replacement <br />Owner: Long Beach water Department, 1900 E. Wardlow Rd. Long Beach Ca. 90807 <br />Type of Work: Installation of 12" 4,920Lf, , 8" 360LF, 6" 892LF, 4" 35LF Ductile Iron Pipe, Installation of New Fire hydrants, <br />Butterfly Valves, New Valves, Copper Service Laterals, 20" inch steel pipe casing, Blow off assembly, line stop, and pipe dewatering. <br />Contract: $2,109,125.93 <br />Contact: Wendy Chen civil Engineer 562-570-2324 Began: 5/11/2012 Ended 12/2012 Supervised by: Victor Dominguez <br />Job Name: 12" inch Transmission Main Relocation <br />Owner: City of Seal Beach <br />Type of Work: installation of 12inch Ductile Iran pipe 479 Lf, installation of 2158 Lf. Of TR-flex restrained Joint Ductile iron Pipe, <br />new Fire hydrant assembly, Blow off assembly, 18inch CML & Steel end cap and abandonment of 18 inch CML & Steel water main. <br />Contract: $453,094.00 <br />Contact: Tom Casulas 562-431-2527 Ext, 1346 Began 5/11/2012 Ended 6/29/2012 Supervised by Adolfo Dominguez <br />Job Name; Water Main Improvement phase 2 <br />Owner: City of Inglewood one Manchester Blvd. Inglewood CA. 90301 <br />Type of work: furnish and install 8"(23101£)& 12" (36001f.) D I P cl 350 pipe, installation of 8"(35) & 12"(34) GV, installation of <br />1 "(92) and 1 'A "(3) services, Fire hydrants and Tie-in works <br />Contract: $889,090.00 <br />Contact; Boytrese Osias at 310-412-5333 Jose Ramirez 310-412-5333 began 2/6/2012 Ended 5/25/2012 Supervised by Adolfo <br />Dominguez <br />Job Name: Water system Improvement <br />Owner: City of Bell Gardens <br />8327 Garfield Ave. Bell Gardens, CA. 90201 <br />Type of Work: installation of 6", 8", & 12" DIP class 52 water main, Installation of 6', 8" & 12" Gate valve & Box. Water service <br />connections for I' & 2" services. New Fire hydrants <br />Contract: $730,229.00 completed 10/2011 <br />Contact: Arjan Aidnani #626-780-9154 project manager./ Sid Mousavi # 562-806-7770 Engineer <br />Supervised by Adolfo Dominguez <br />Job name Waterline Replacements in alleys and Streets Project 10091 <br />Owner: City of Beverly Hills <br />345 Foothill Rd., Beverly Hills, CA. 90210 <br />Type Work: installation of 10,330 LF. of 8"inch DIP class 52, push on joints, slurry installed, 9,034 LF, of 8inch Dip c1ass52 , <br />restrained joints, slurry in place. Polyethylene encasement around DIP, 36 -8inch Butterfly valve with valve box, 14inch and 16inch <br />butterfly valve replacement, install and remove traffic rated Meter box with bolted cover for 1" & 2" service, abandonment of <br />interfering portions of 4", 6" & 8" pipe, remodel sewer house connections, reconstruct PCC alley approach, linestop for 14" & 16" <br />butterfly valve replacement, reconstruct 9 fire hydrants, re -connect 1,2,3 & 4 inch domestic services <br />