Laserfiche WebLink
Contract: $3,197,670.00 Completed: 7/8/2011 <br />Contact: Charles Gettler Inspector 310-925-0702 or Juan Martinez Civil Engineer Supervised by Victor Dominguez & Adolfo <br />Dominguez <br />Job Name. Foothill Blvd. Water Improvement (Grand Ave. to Cullen Ave) <br />Owner: City of Glendora <br />116 E. Foothill Blvd., Glendora, CA, 91741 <br />Type Work: install 46991f. Of 16" ductile iron pipe CL 350, 741£ Of 30" steel pipe casing %" wall thickness under railroad way, 17 <br />of 16" butterfly valves, 10 6" fire hydrant assembly, 6" blow offs, 1" & 2" water service assemblies. <br />Contract: $1,276,752.00 <br />Contact: Civil Engineer Jason Roegln-born 626-914-8253 cell 626-374-5336 Supervised by Adolfo Dominguez <br />Completed: 3/2011 <br />Job Name: Cast Iron Main Replacement — Artesia Blvd <br />Owner: Long Beach Water Department <br />1800 E. Wardlow Dr., Long Beach CA. 90807 <br />Type work: Furnish an install 4", 6", 8", & 12" Ductile Iron water line. Installation of cooper service <br />Laterals, reconnections of services, fire hydrants, and installation of valves. <br />Contract: $1,665,824.82 completed: June 15, 2010 <br />Contact: Azhar Khan 323-401-7830 consultant engineer CH2M Mill, Inspector Ed Mendoza 562-577-6560 <br />Inspector: Mike White 805-302-5375, Wendy Chen 562-570-2324 civil engineer, Supervised by Adolfo Dominguez <br />Job Name: Alley Service Connection Conversion <br />Owner: Long Beach Water Dpt. <br />1800 Wardlow DR., Long Beach Ca. 90807 <br />Type of Work: 1", 2". 3", water service connections, 4", 6", and 8" DIP water main installation, hot tap including gate valves, and <br />fire service installation Contract: $729,950.00 completed: 9/2009 Contact: Ed Mendoza 562-5776560, Dave Stuetzel 4 714-665- <br />4500, Supervised By Adolfo Dominguez <br />Job Name: 2008/2009 Water main Replacement <br />Owner: City Of Monterey Park <br />320 W. Newmark Ave, Monterey Park, CA. <br />Type of work (description): Installation of 270Lf. 12", 2520LF. 8" cement mortar ductile iron pipe with fittings and appurtenances. <br />Furnish and install new fire hydrants and connections. <br />Contract: $596,847.74 completed 3/09/2009 <br />Contact: Vennie Bermudez Engineer #310-749-9309 <br />Adolph Villalpando 626-307-1294 Water Distribution Supervisor, Supervised by Adolfo Dominguez <br />Job Name: Artesia Pilar Neighborhood Water main Improvements <br />Owner: City of Santa Ana <br />20 Civic center plazas, Santa Ana, CA. 92701 <br />Type of Work (description): installation of 7028Lf, Of 12", 8560 L£ 8", ciass200 AWWA c900, PVC water main. Construct water <br />services, fire Iine connections, and new fire hydrant assembly <br />Contract Amount: $1,858,549.60 completed: 1/2009 <br />Contact: Ed Tones # 714-647-5018 engineer cell 626-379-1372 Supervised By: Adolfo Dominguez <br />Job Name: Water System Improvement <br />Owner: City of BeII Gardens <br />8327Garfie1d Ave, Garfield CA. 90201 <br />Type Of Work: (description) installation of 40Lf. Of 6" DIP class 52, 1180LF, 8" DIP class 52& 580L£ DIP class52. Water service <br />connections, gate valves, and box, new fire hydrants. <br />Contract Amount: $314,650.0 Completed 12/2009 <br />Contact: Adolph Villapando #562-322-5495 inspector (engineer no longer with the city) Supervised by: Adolfo Dominguez <br />Job Name: Edmonton Rd Water Main <br />Owner: City of Glendale water and power <br />141 N Glendale Ave, Glendale, CA. 91206 <br />Type of Work description) install 8850Lf. Of 8" Pressure class 350 ductile iron pipe with fittings and appurtenances. Furnish and <br />install copper tube services to new main. new fire hydrants, sewer laterals 8" & 6" gate valves, blow off assemblies. <br />