Contract: $3,197,670.00 Completed: 7/8/2011
<br />Contact: Charles Gettler Inspector 310-925-0702 or Juan Martinez Civil Engineer Supervised by Victor Dominguez & Adolfo
<br />Dominguez
<br />Job Name. Foothill Blvd. Water Improvement (Grand Ave. to Cullen Ave)
<br />Owner: City of Glendora
<br />116 E. Foothill Blvd., Glendora, CA, 91741
<br />Type Work: install 46991f. Of 16" ductile iron pipe CL 350, 741£ Of 30" steel pipe casing %" wall thickness under railroad way, 17
<br />of 16" butterfly valves, 10 6" fire hydrant assembly, 6" blow offs, 1" & 2" water service assemblies.
<br />Contract: $1,276,752.00
<br />Contact: Civil Engineer Jason Roegln-born 626-914-8253 cell 626-374-5336 Supervised by Adolfo Dominguez
<br />Completed: 3/2011
<br />Job Name: Cast Iron Main Replacement — Artesia Blvd
<br />Owner: Long Beach Water Department
<br />1800 E. Wardlow Dr., Long Beach CA. 90807
<br />Type work: Furnish an install 4", 6", 8", & 12" Ductile Iron water line. Installation of cooper service
<br />Laterals, reconnections of services, fire hydrants, and installation of valves.
<br />Contract: $1,665,824.82 completed: June 15, 2010
<br />Contact: Azhar Khan 323-401-7830 consultant engineer CH2M Mill, Inspector Ed Mendoza 562-577-6560
<br />Inspector: Mike White 805-302-5375, Wendy Chen 562-570-2324 civil engineer, Supervised by Adolfo Dominguez
<br />Job Name: Alley Service Connection Conversion
<br />Owner: Long Beach Water Dpt.
<br />1800 Wardlow DR., Long Beach Ca. 90807
<br />Type of Work: 1", 2". 3", water service connections, 4", 6", and 8" DIP water main installation, hot tap including gate valves, and
<br />fire service installation Contract: $729,950.00 completed: 9/2009 Contact: Ed Mendoza 562-5776560, Dave Stuetzel 4 714-665-
<br />4500, Supervised By Adolfo Dominguez
<br />Job Name: 2008/2009 Water main Replacement
<br />Owner: City Of Monterey Park
<br />320 W. Newmark Ave, Monterey Park, CA.
<br />Type of work (description): Installation of 270Lf. 12", 2520LF. 8" cement mortar ductile iron pipe with fittings and appurtenances.
<br />Furnish and install new fire hydrants and connections.
<br />Contract: $596,847.74 completed 3/09/2009
<br />Contact: Vennie Bermudez Engineer #310-749-9309
<br />Adolph Villalpando 626-307-1294 Water Distribution Supervisor, Supervised by Adolfo Dominguez
<br />Job Name: Artesia Pilar Neighborhood Water main Improvements
<br />Owner: City of Santa Ana
<br />20 Civic center plazas, Santa Ana, CA. 92701
<br />Type of Work (description): installation of 7028Lf, Of 12", 8560 L£ 8", ciass200 AWWA c900, PVC water main. Construct water
<br />services, fire Iine connections, and new fire hydrant assembly
<br />Contract Amount: $1,858,549.60 completed: 1/2009
<br />Contact: Ed Tones # 714-647-5018 engineer cell 626-379-1372 Supervised By: Adolfo Dominguez
<br />Job Name: Water System Improvement
<br />Owner: City of BeII Gardens
<br />8327Garfie1d Ave, Garfield CA. 90201
<br />Type Of Work: (description) installation of 40Lf. Of 6" DIP class 52, 1180LF, 8" DIP class 52& 580L£ DIP class52. Water service
<br />connections, gate valves, and box, new fire hydrants.
<br />Contract Amount: $314,650.0 Completed 12/2009
<br />Contact: Adolph Villapando #562-322-5495 inspector (engineer no longer with the city) Supervised by: Adolfo Dominguez
<br />Job Name: Edmonton Rd Water Main
<br />Owner: City of Glendale water and power
<br />141 N Glendale Ave, Glendale, CA. 91206
<br />Type of Work description) install 8850Lf. Of 8" Pressure class 350 ductile iron pipe with fittings and appurtenances. Furnish and
<br />install copper tube services to new main. new fire hydrants, sewer laterals 8" & 6" gate valves, blow off assemblies.
<br />
|