Laserfiche WebLink
1 <br />Cost Proposal <br />Garage Conversion <br />Meetings with Staff (Prelim / Final Plans)1,500.00$ <br />Preliminary Design 2,500.00$ <br />Design Development 1,500.00$ <br />Construction Documents - Final Plans per RFP 9,500.00$ <br />Structural Plans / Calculations 6,325.00$ <br />Energy Calculations / Forms 1,000.00$ <br />Meetings with Staff to Finalize Plan Sets 1,000.00$ <br />Sub Total 23,325.00$ <br />Renderings for Publication 1,500.00$ <br />Total - Garage Conversion:24,825.00$ <br />Studio <br />Meetings with Staff (Prelim / Final Plans)1,500.00$ <br />Preliminary Design 4,500.00$ <br />Design Development 2,000.00$ <br />Construction Documents - Final Plans per RFP 11,500.00$ <br />Structural Plans / Calculations 6,900.00$ <br />Energy Calculations / Forms 1,000.00$ <br />Meetings with Staff to Finalize Plan Sets 1,000.00$ <br />Sub Total 28,400.00$ <br />Renderings for Publication 2,500.00$ <br />Total - Studio:30,900.00$ <br />Exhibit B