Laserfiche WebLink
2 <br />One Bedroom <br />Meetings with Staff (Prelim / Final Plans)1,500.00$ <br />Preliminary Design 5,500.00$ <br />Design Development 2,000.00$ <br />Construction Documents - Final Plans per RFP 13,000.00$ <br />Structural Plans / Calculations 7,475.00$ <br />Energy Calculations / Forms 1,000.00$ <br />Meetings with Staff to Finalize Plan Sets 1,000.00$ <br />Sub Total 31,475.00$ <br />Renderings for Publication 3,000.00$ <br />Total - One Bedroom:34,475.00$ <br />Two Bedroom <br />Meetings with Staff (Prelim / Final Plans)1,500.00$ <br />Preliminary Design 6,500.00$ <br />Design Development 2,000.00$ <br />Construction Documents - Final Plans per RFP 15,000.00$ <br />Structural Plans / Calculations 7,820.00$ <br />Energy Calculations / Forms 1,000.00$ <br />Meetings with Staff to Finalize Plan Sets 1,000.00$ <br />Sub Total 34,820.00$ <br />Renderings for Publication 3,000.00$ <br />Total - Two Bedroom:37,820.00$