Laserfiche WebLink
AESCO <br />AESCO Proposal No. P6513 <br />Statement of Qualifications <br />Lakeview Avenue Grade Separation -Anaheim and Yorba Linda <br />Senior Engineer: Mr. Ryan was the Senior Engineer for preparation of the QC/QA manual and <br />supervised materials testing and inspection during construction of a new railroad grade separation <br />at the BNSF track. The project included railroad bridges, retaining walls, depressed roadways, utility <br />relocations, roadway bridges, channel walls and drainage ditches. <br />Design/Build Modernization for Terminal 1, Redevelopment Program for Terminal 7 and <br />Modernization of Terminal 6-Los Angeles World Airport for the City of Los Angeles <br />Senior Engineer: Mr. Ryan was the Senior Engineer for the special inspection and testing for three <br />design/build projects at terminals 1, 6 and 7 for Southwest and United Airlines and for Westfield <br />Properties. The scope of work included testing of the subgrade, base and concrete pavement for <br />aprons, and asphaltic concrete tests on the areas between taxiways and utility trenches on the <br />operation areas of the airport. Inside the terminals, concrete, masonry, fireproofing, structural steel <br />with high strength bolting and welding special inspections were provided on a 24/7 basis during <br />construction to seismically upgrade the 45 year old structures. Supervised a work force of eight <br />inspectors working 2 shifts per day which was required to complete the project while keeping the <br />terminals open. <br />Baldwin Park Pumping Plant — Olsson Construction for Covina Irrigating Company <br />Senior Engineer: Mr. Ryan was the Senior Engineer for the site preparation report for remedial <br />grading of the existing Covina Irrigation Company Baldwin Park Pumping Plant in Baldwin Park, CA. <br />The existing plant is being upgraded, requiring removal of existing fill containing miscellaneous <br />debris found to a depth of 6 feet below grade. At the locations of the proposed structures, AESCO <br />monitored the removal of the existing fill and replacement with compacted imported select fill. <br />Various School Improvement Projects -Los Angeles Unified School District <br />Senior Engineer: Mr. Ryan was the Senior Engineer for the construction materials testing for the <br />improvements at various grade school, middle school and high school campuses throughout the <br />LAUSD. Mr. Ryan performed rebar inspection, foundation inspection, compaction testing and <br />inspections, concrete testing and inspection, etc. <br />Los Angeles Interoperative Communications System -Los Angeles County <br />Senior Engineer: Mr. Ryan was the Senior Engineer for numerous sites throughout Los Angeles <br />County for the new emergency communications system. The facilities generally consist of self- <br />supporting towers and equipment support slabs. The towers vary in height up to 180 feet. <br />Materials testing services included inspection and testing of concrete, foundations and cast -in -place <br />drilled holes (caisson). <br />Construction Material Testing/ Inspection Environmental and Geotechnical Engineering Services 27 I I, a g e g a i t d i a q 4 m e z l c a <br />www.AescoTech.com 7 z a m % 4 e Cf z a a o d ZI A <br />