My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - On -Call Material Testing and Special Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
Item 21 - On -Call Material Testing and Special Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:29:33 PM
Creation date
8/21/2023 3:49:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AESCO <br />AESCO Proposal No. P6513 <br />Statement of Qualifications <br />David J. Ryan <br />Senior Engineer, P.E.----------- - - - - -� <br />Registered civil engineer with over 40 years of experience as materials Civil <br />i Engigi neering, , <br />testing, special inspection services manager. Responsible for laboratory University of Illinois, <br />and field testing services on materials such as concrete, soils, i Champaign -Urbana, <br />aggregates, reinforcing steel, structural steel, high strength bolting and 1973 <br />welded structures. Registrations: i <br />California No. C49661 <br />Specific Project Experience (Civil) <br />Beach Boulevard Water Main Extension Project -City of Huntington Beach , <br />and Caltrans , <br />L-------------- <br />Senior Engineer: Mr. Ryan was the Senior Engineer for a 1500 foot extension <br />-- <br />of a water main on Eastbound Beach Boulevard between South Warner Avenue and Robidoux Drive <br />and West Beach Boulevard to East Beach Boulevard at Holt in the Caltrans right-of-way. The entire <br />project was constructed at night to accommodate traffic on Beach Boulevard. The testing and <br />inspections included the placement of all structural fill and backfill, concrete testing and inspection, <br />subgrade and aggregate base placement and compaction, asphalt paving construction (base and <br />surface layers), rubber asphaltic concrete, slurry backfill, and inspection of three kinds of pipe-pvc, <br />ductile iron, concrete mortar steel lined pipe, and pvc water lines, valves, fittings and the existing <br />lines connections. Mr. Ryan attended the preconstruction meeting, worked closely with AESCO and <br />the City's engineers to provide approval of material submittals, response to RFI's, assisted in the <br />resolution of construction matters, change orders, maintained the daily diary and the QA/QC logs. <br />Mr. Ryan also coordinated street closure and traffic control to verify that it was in accordance with <br />Caltrans requirements, encroachment permits, noise control, vibration monitoring, and SWPP. Dave <br />reviewed daily work tasks with the Contractor and verified that work was proceeding in accordance <br />with plans and specifications, alerted contractor to project requirements, verified depth of asphalt <br />and aggregate base and measured that the roadway met the required depth of asphalt and <br />aggregate base nightly. Also verified the trench backfill, pipe bedding and rolling and compaction of <br />the asphaltic concrete. Tracked construction schedule and quantities of materials. Reviewed <br />contractor payment schedule. Worked closely with the City of Huntington Beach Senior <br />Construction Project Manager. <br />Long Beach Main Pumping Plant, Los Angeles County Sanitation District -Long Beach <br />Senior Engineer: Mr. Ryan was the Senior Engineer for the quality control inspection and materials <br />testing and geotechnical engineering services for the contractor for the Los Angeles County <br />Sanitation District for the New Main Pumping Plant. The project involved a 50-foot wet well next to <br />the existing plant along the 710 Freeway, adjacent to the Port of Long Beach. Forty separate <br />structural concrete pours were performed below grade which required mass concrete -thermal <br />control. <br />Gerald Desmond Bridge Replacement -Port of Long Beach <br />Laboratory Quality Control Manager: Mr. Ryan was the Laboratory Quality Control Manager for <br />production testing of all reinforcing steel splices in accordance with Caltrans procedures for the <br />replacement of the existing bridge. Sampling and testing were performed for rebar welded hoops, <br />couplers, and reinforcing bars during construction of the foundations for the new bridge. <br />Construction Material Testing/ Inspection , <br />Environmental and Geotechnical Engineering Services 26 I I a g e g a i t d i a q 4 m e z i c a <br />www.AescoTech.com 7 z a m % 4 e Cf z a a o d 'U A <br />
The URL can be used to link to this page
Your browser does not support the video tag.