My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Urban Water Management Plan and Water Shortage Contingency Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
Item 28 - Urban Water Management Plan and Water Shortage Contingency Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 4:26:08 PM
Creation date
8/21/2023 4:24:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
6/1/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana 2020 Water Shortage Contingency Plan <br />2-2 <br />Figure 2-1: City Service Area <br />Although the City supplements its water supply portfolio with recycled water, the WSCP only applies to its <br />potable water supply. The City is directly involved in wastewater services through its ownership and <br />operation of the wastewater collection system in its service area and sends all collected wastewater to <br />Orange County Sanitation District (OC San) for treatment and disposal. The City provides OCWD Green <br />Acres Project (GAP) recycled water to the southern part of the City, as detailed in Section 6.6 of the City’s <br />2020 UWMP (Santa Ana, 2021a). The City will determine the recycled water demand reduction actions <br />for recycled water based on the availability of supply and to meet necessary wastewater discharge permit <br />requirements.
The URL can be used to link to this page
Your browser does not support the video tag.